Chuan Chen
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Chuan Chen has a total of 41 co-authors. Here are the top co-authors by number of shared publications:
- Igor Martek
School of Architecture and Built Environment, Deakin University, Geelong, VIC 3220, Australia
10 shared publications - Yubo Guo
SILK ROAD Research Center for Oil & Gas Energy Strategy, Southwest Petroleum University, Chengdu 610500, China
4 shared publications - Guanghua Li
College of Environment and Civil Engineering, Chengdu University of Technology, Chengdu 610059, China
3 shared publications Igor Martek
School of Architecture and Built Environment, Deakin University, Geelong, Australia
3 shared publicationsJinchan Liu
National University of Singapore
3 shared publicationsYubo Guo
Business School, Sichuan University, Chengdu, China; Department of Architecture and Civil Engineering, City University of Hong Kong, Hong Kong, China
3 shared publications
Latest Publications
- Open Access
Risk and Control Rights-Oriented Payment Method Selection for the Operation and Maintenance Phase of Public–Private Partnership Projects
Payment method selection for the Operation and Maintenance (O&M) phase of Public–Private Partnership (PPP) projects remains underexplored, despite its critical role in balancing risk and project control. Drawing on the theories of risk allocation and project control rights, this paper developed a theoretical model for payment method selection of the O&M phase of PPP projects through literature review; 13 influencing factors associated with the model were verified by interview. A survey of PPP professionals in China was analyzed to group these factors into four categories: maturity of pre-project work (MPPW), capacity of potential investors (CPIN), operating cost risk (OCRI), and capacity of local government (CLGO). The findings also reveal two distinct influencing mechanisms: the Cost-Plus-Fee (CPF) approach is preferred when MPPW, CLGO, and OCRI are high, but CPIN is low. Conversely, the Fixed-Price (FP) approach is favored when these factors are reversed. This study advances PPP financing and governance literature by integrating risk allocation and project control rights theories into a novel framework, enhancing the understanding of payment method selection in complex contexts. Besides, unpacking the influence mechanisms provides practitioners with a structured approach to better understand the determinants of payment method selection, thereby supporting more informed risk management, control allocation, and project outcomes in real-world settings.
Open AccessRisk and Control Rights-Oriented Payment Method Selection for the Operation and Maintenance Phase of Public–Private Partnership Projects
Payment method selection for the Operation and Maintenance (O&M) phase of Public–Private Partnership (PPP) projects remains underexplored, despite its critical role in balancing risk and project control. Drawing on the theories of risk allocation and project control rights, this paper developed a theoretical model for payment method selection of the O&M phase of PPP projects through literature review; 13 influencing factors associated with the model were verified by interview. A survey of PPP professionals in China was analyzed to group these factors into four categories: maturity of pre-project work (MPPW), capacity of potential investors (CPIN), operating cost risk (OCRI), and capacity of local government (CLGO). The findings also reveal two distinct influencing mechanisms: the Cost-Plus-Fee (CPF) approach is preferred when MPPW, CLGO, and OCRI are high, but CPIN is low. Conversely, the Fixed-Price (FP) approach is favored when these factors are reversed. This study advances PPP financing and governance literature by integrating risk allocation and project control rights theories into a novel framework, enhancing the understanding of payment method selection in complex contexts. Besides, unpacking the influence mechanisms provides practitioners with a structured approach to better understand the determinants of payment method selection, thereby supporting more informed risk management, control allocation, and project outcomes in real-world settings.
- Open Access
Toward a Refined Framework for Qualitative VfM Assessment in Chinese PPPs: A Comparative Approach
China’s extensive experience with Public–Private Partnerships (PPPs) over the past decade offers valuable lessons for international infrastructure governance. Central to the PPP concept is the imperative to deliver Value for Money (VfM), and VfM assessment serves as a critical tool to determine whether the PPP modality is appropriate for a given project. While China’s Ministry of Finance (MoF) introduced a qualitative VfM assessment framework in 2015, its conceptual ambiguity, indicator overlap, and procedural inconsistencies have limited its effectiveness in guiding PPP decisions. This paper critically examines the existing Chinese qualitative VfM framework through comparative analysis with two international approaches: the UK HM Treasury’s three-dimensional VfM approach and the UN ESCAP’s developmental framework for Asia–Pacific countries. Through pair-wise and structural comparison, the study identifies key gaps in the Chinese model, including the absence of a preliminary applicability screening stage and insufficiently specified treatment of output clarity, scope stability, interface coordination, private-sector capability, revenue sustainability, and asset-life/contract-term alignment. Drawing on international insights, a refined VfM framework is proposed, featuring a pre-screening mechanism, a refined indicator system, and enhanced scoring methodology. The framework is applied to a complex, large-scale PPP case in China through a retrospective reassessment to illustrate its operability and diagnostic usefulness. Results show that the refined approach preserves the original positive VfM judgement while improving analytical clarity, procedural transparency, and the traceability of expert scoring. The paper concludes by discussing how a more structured qualitative VfM procedure can contribute to evaluation governance in PPP decision-making, while also identifying the need for further testing across additional PPP cases in China and beyond.
Open AccessToward a Refined Framework for Qualitative VfM Assessment in Chinese PPPs: A Comparative Approach
China’s extensive experience with Public–Private Partnerships (PPPs) over the past decade offers valuable lessons for international infrastructure governance. Central to the PPP concept is the imperative to deliver Value for Money (VfM), and VfM assessment serves as a critical tool to determine whether the PPP modality is appropriate for a given project. While China’s Ministry of Finance (MoF) introduced a qualitative VfM assessment framework in 2015, its conceptual ambiguity, indicator overlap, and procedural inconsistencies have limited its effectiveness in guiding PPP decisions. This paper critically examines the existing Chinese qualitative VfM framework through comparative analysis with two international approaches: the UK HM Treasury’s three-dimensional VfM approach and the UN ESCAP’s developmental framework for Asia–Pacific countries. Through pair-wise and structural comparison, the study identifies key gaps in the Chinese model, including the absence of a preliminary applicability screening stage and insufficiently specified treatment of output clarity, scope stability, interface coordination, private-sector capability, revenue sustainability, and asset-life/contract-term alignment. Drawing on international insights, a refined VfM framework is proposed, featuring a pre-screening mechanism, a refined indicator system, and enhanced scoring methodology. The framework is applied to a complex, large-scale PPP case in China through a retrospective reassessment to illustrate its operability and diagnostic usefulness. Results show that the refined approach preserves the original positive VfM judgement while improving analytical clarity, procedural transparency, and the traceability of expert scoring. The paper concludes by discussing how a more structured qualitative VfM procedure can contribute to evaluation governance in PPP decision-making, while also identifying the need for further testing across additional PPP cases in China and beyond.
- Open Access
Validation and Optimization of the Cite Frequency Approach in Identifying Potential Factors Affecting the Bid/No-Bid Decision
The Cite Frequency Approach (CFA) is an accepted method for identifying potential factors influencing bid/no-bid decisions, yet no study has systematically validated its theoretical foundation. The aim of this study was to elucidate the theoretical basis of CFA and ascertain whether citation frequency truly reflects factor importance. Through rigorous screening undertaken using the PRISMA method, 24 journal articles with bid/no-bid decision (BNBD) factors’ RII were extracted for analysis. By constructing a 276-times pairwise comparisons of these articles, a matrix of 121 factors’ RII was built. Based on the matrix data, 2380 Spearman correlation coefficients (rhos) between cite frequency and RII were calculated. Significant level rhos of medium and high strength account for only 15.59%. This demonstrates that the cite frequencies of factors found in previous studies are not highly representative of their importance. Cite frequencies are therefore shown to be unreliable in identifying the potential factors affecting BNBD. Moreover, the Meta-Analyses approach (MAA) is proposed as a superior factor selection method (MAA), and this was verified to be more representative and effective than CFA. This study provides the first systematic and global validation of CFA’s core assumption supported by robust and generalizable findings. It enriches the methods for identifying potential factors affecting decisions, including but not limited to BNBD.
Open AccessValidation and Optimization of the Cite Frequency Approach in Identifying Potential Factors Affecting the Bid/No-Bid Decision
The Cite Frequency Approach (CFA) is an accepted method for identifying potential factors influencing bid/no-bid decisions, yet no study has systematically validated its theoretical foundation. The aim of this study was to elucidate the theoretical basis of CFA and ascertain whether citation frequency truly reflects factor importance. Through rigorous screening undertaken using the PRISMA method, 24 journal articles with bid/no-bid decision (BNBD) factors’ RII were extracted for analysis. By constructing a 276-times pairwise comparisons of these articles, a matrix of 121 factors’ RII was built. Based on the matrix data, 2380 Spearman correlation coefficients (rhos) between cite frequency and RII were calculated. Significant level rhos of medium and high strength account for only 15.59%. This demonstrates that the cite frequencies of factors found in previous studies are not highly representative of their importance. Cite frequencies are therefore shown to be unreliable in identifying the potential factors affecting BNBD. Moreover, the Meta-Analyses approach (MAA) is proposed as a superior factor selection method (MAA), and this was verified to be more representative and effective than CFA. This study provides the first systematic and global validation of CFA’s core assumption supported by robust and generalizable findings. It enriches the methods for identifying potential factors affecting decisions, including but not limited to BNBD.
- 30 October 2025
- Published by Springer Nature
- p. 919-932
Evaluating Investment Risks in Railway Transit-Oriented Development (TOD) Projects in China: Perspectives from Practitioners
- 30 October 2025
- Published by Springer Nature
- p. 919-932
Evaluating Investment Risks in Railway Transit-Oriented Development (TOD) Projects in China: Perspectives from Practitioners
- 4 August 2024
- Published by Springer Nature
- p. 1561-1574
Antecedents of Chinese Consumers’ Purchase Intentions Toward Hybrid Electric Vehicles (HEVs)
- 4 August 2024
- Published by Springer Nature
- p. 1561-1574
Antecedents of Chinese Consumers’ Purchase Intentions Toward Hybrid Electric Vehicles (HEVs)
- 6 July 2024
- Published by Springer Nature
- p. 13-21
Decision-Making Factors Influencing Bundling Strategies in Educational PPP Projects
- 6 July 2024
- Published by Springer Nature
- p. 13-21
Decision-Making Factors Influencing Bundling Strategies in Educational PPP Projects
- Open Access
- 6 February 2024
- Published by Vilnius Gediminas Technical University in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
- Vol. 30 (2) , 149-167
DETERMINING CONCESSIONARY ITEMS FOR “AVAILABILITY PAYMENT ONLY” PPP PROJECTS: A HOLISTIC FRAMEWORK INTEGRATING VALUE-FOR-MONEY AND SOCIAL VALUES
Public-private partnerships (PPPs) have been widely applied in infrastructure development around the world. However, reasonable concessionary items are critical to compromise interest conflicts between government agencies and sponsors to ensure project success. A broad literature review centering on PPP transaction structuring revealed two significant research gaps: (1) a lack of attention to the ‘availability payment only’ (APO) funding method and (2) negligence of the public side’s perspective in determining concessionary items. The research objective was to develop a methodological framework for determining concessionary items in APO PPP projects while considering the interests of the public side. This study proposed a value-for-money (VFM) and social values integrated framework which accommodates discounted cash flow (DCF) analysis, bargaining game modeling, and multi-objectives decision-making (MODM). This framework enables a decision-making process based on both an indifferent feasible interval of concessionary items under a discount rate agreed upon by both parties and an optimal set of concessionary items. Additionally, results of a sensitivity analysis indicated that project construction profit can significantly affect feasible and optimal concession items, and the optimal concession period is less sensitive to changes in risk allocation. The application of proposed model indicated that this paper successfully provides a methodology for determining a feasible interval and an optimal concession items group tailored to APO PPP projects. This study paves the way towards a platform for the public and private partners to jointly and quickly come up with sound PPP concessional items in light of the win-win principle, particularly under the APO funding mechanism.
- 6 February 2024
- Published by Vilnius Gediminas Technical University in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
- Vol. 30 (2) , 149-167
Open AccessDETERMINING CONCESSIONARY ITEMS FOR “AVAILABILITY PAYMENT ONLY” PPP PROJECTS: A HOLISTIC FRAMEWORK INTEGRATING VALUE-FOR-MONEY AND SOCIAL VALUES
Public-private partnerships (PPPs) have been widely applied in infrastructure development around the world. However, reasonable concessionary items are critical to compromise interest conflicts between government agencies and sponsors to ensure project success. A broad literature review centering on PPP transaction structuring revealed two significant research gaps: (1) a lack of attention to the ‘availability payment only’ (APO) funding method and (2) negligence of the public side’s perspective in determining concessionary items. The research objective was to develop a methodological framework for determining concessionary items in APO PPP projects while considering the interests of the public side. This study proposed a value-for-money (VFM) and social values integrated framework which accommodates discounted cash flow (DCF) analysis, bargaining game modeling, and multi-objectives decision-making (MODM). This framework enables a decision-making process based on both an indifferent feasible interval of concessionary items under a discount rate agreed upon by both parties and an optimal set of concessionary items. Additionally, results of a sensitivity analysis indicated that project construction profit can significantly affect feasible and optimal concession items, and the optimal concession period is less sensitive to changes in risk allocation. The application of proposed model indicated that this paper successfully provides a methodology for determining a feasible interval and an optimal concession items group tailored to APO PPP projects. This study paves the way towards a platform for the public and private partners to jointly and quickly come up with sound PPP concessional items in light of the win-win principle, particularly under the APO funding mechanism.
- 26 May 2023
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 31 (11) , 4562-4584
Inclusion of “managing flexibility” valuations in the pricing of PPP projects: a multi-objective decision-making method
Purpose: The Public–Private Partnership (PPP) modality plays an important role in the procurement of global infrastructure projects. Regarding PPP's complex transaction structure, pricing of a PPP project is critical to both parties where the government pursues a high value for money (VFM) and the investor strives to maximize its financial gains. Despite the straightforward win–win principle, a formidable compromise is often the case to end up with a fairly acceptable price, subject to many determinants such as the risk profile, expected return, technological innovation and capacities of both parties. Among them, this study chooses to examine the “managing flexibility” (MF) capacity of investors in pricing of a PPP project, in light of the widely recognized importance of a real-option perspective toward the long term, complex and uncertain PPP arrangement. This study addresses two major questions: (1) how is MF in PPP projects to be valued and (2) how are PPP projects to be priced when considering a project's MF value.Design/methodology/approach: A binomial tree model is used to evaluate the MF value in PPP projects. Based on the developed MF pricing model, net present value (NPV) and adjusted VFM value are then calculated. Finally, a multi-objective decision-making method (MODM) was adopted to determine the optimal level of returns based on invested capital (ROIC), return on operation maintenance (ROOM) and concession period.Findings: The applicability and functionality of the proposed model is investigated using a real project case. For a given return, extended NPV and adjusted VFM value were calculated and analyzed using sensitivity analysis. Factor influence is shown by the model to be dependent on factor impact on cash flow. Subsequently, a multi-objective decision-making (MODM) model was adopted to determine the optimal level of returns, where the solution approximates the real-world bidding price. Results confirm that the pricing model provides a reliable and practical PPP proposal pricing tool.Originality/value: This study proposes an integrated framework for valuing MF in PPP projects and thus more accurately determine optimal pricing of PPP projects than revealed in extant research. The model offers a practical tool to aid in the valuation of PPP projects.
- 26 May 2023
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 31 (11) , 4562-4584
Inclusion of “managing flexibility” valuations in the pricing of PPP projects: a multi-objective decision-making method
Purpose: The Public–Private Partnership (PPP) modality plays an important role in the procurement of global infrastructure projects. Regarding PPP's complex transaction structure, pricing of a PPP project is critical to both parties where the government pursues a high value for money (VFM) and the investor strives to maximize its financial gains. Despite the straightforward win–win principle, a formidable compromise is often the case to end up with a fairly acceptable price, subject to many determinants such as the risk profile, expected return, technological innovation and capacities of both parties. Among them, this study chooses to examine the “managing flexibility” (MF) capacity of investors in pricing of a PPP project, in light of the widely recognized importance of a real-option perspective toward the long term, complex and uncertain PPP arrangement. This study addresses two major questions: (1) how is MF in PPP projects to be valued and (2) how are PPP projects to be priced when considering a project's MF value.Design/methodology/approach: A binomial tree model is used to evaluate the MF value in PPP projects. Based on the developed MF pricing model, net present value (NPV) and adjusted VFM value are then calculated. Finally, a multi-objective decision-making method (MODM) was adopted to determine the optimal level of returns based on invested capital (ROIC), return on operation maintenance (ROOM) and concession period.Findings: The applicability and functionality of the proposed model is investigated using a real project case. For a given return, extended NPV and adjusted VFM value were calculated and analyzed using sensitivity analysis. Factor influence is shown by the model to be dependent on factor impact on cash flow. Subsequently, a multi-objective decision-making (MODM) model was adopted to determine the optimal level of returns, where the solution approximates the real-world bidding price. Results confirm that the pricing model provides a reliable and practical PPP proposal pricing tool.Originality/value: This study proposes an integrated framework for valuing MF in PPP projects and thus more accurately determine optimal pricing of PPP projects than revealed in extant research. The model offers a practical tool to aid in the valuation of PPP projects.
- Open Access
- 1 January 2023
- Published by European Alliance for Innovation n.o.
Bibliometric Analysis of Real Estate Investment Trusts Research
In order to understand the research trend and key fields of Real Estate Investment Trusts (REITs), a bibliometric analysis was conducted based on the Web of Science database and Bibliometrix. This study gives a comprehensive overview of the Real Estate Investment Trusts research according to annual output, publishing journals, institutions, authors, research fields and temporal trends in keywords. The Journal of Real Estate Finance and Economics and Real Estate Economics are the most popular journals for researchers to publish research results. These two journals also have greater influence in this field and have more citations than other journals. State University System Of Florida is the institution with the most research achievements. Seen from the number of papers, C. F. Sirmans, Chinmoy Ghosh and Ong Seow Eng are the most competitive authors. Keyword analysis shows that "risk" and "return" are the most frequently studied topics by researchers. Through literature review, a REITs process model was established to help researchers understand and analyze the target process in depth while grasping the research progress of REITs.
- 1 January 2023
- Published by European Alliance for Innovation n.o.
Open AccessBibliometric Analysis of Real Estate Investment Trusts Research
In order to understand the research trend and key fields of Real Estate Investment Trusts (REITs), a bibliometric analysis was conducted based on the Web of Science database and Bibliometrix. This study gives a comprehensive overview of the Real Estate Investment Trusts research according to annual output, publishing journals, institutions, authors, research fields and temporal trends in keywords. The Journal of Real Estate Finance and Economics and Real Estate Economics are the most popular journals for researchers to publish research results. These two journals also have greater influence in this field and have more citations than other journals. State University System Of Florida is the institution with the most research achievements. Seen from the number of papers, C. F. Sirmans, Chinmoy Ghosh and Ong Seow Eng are the most competitive authors. Keyword analysis shows that "risk" and "return" are the most frequently studied topics by researchers. Through literature review, a REITs process model was established to help researchers understand and analyze the target process in depth while grasping the research progress of REITs.
- Open Access
A Framework for Selecting Construction Project Delivery Method Using Design Structure Matrix
Determining a project delivery method that matches the characteristics of a construction project is a critical step that affects the success or failure of a project. The Project Delivery Method (PDM) should be adapted to the activities and processes of project implementation. However, the traditional selection method does not come from the internal process of the project which may lead to the delivery method not being able to meet the actual project requirements. This research proposes a DSM-based PDM selection framework model that regroups activities and identifies appropriate PDMs by revealing the dependencies and intensities between activities. The research uses a case to demonstrate the feasibility of the framework. After considering specific project requirements and goals, the framework model can be used as a basis for choosing specific project delivery methods, or as a visualization tool to help owners schedule activities.
Open AccessA Framework for Selecting Construction Project Delivery Method Using Design Structure Matrix
Determining a project delivery method that matches the characteristics of a construction project is a critical step that affects the success or failure of a project. The Project Delivery Method (PDM) should be adapted to the activities and processes of project implementation. However, the traditional selection method does not come from the internal process of the project which may lead to the delivery method not being able to meet the actual project requirements. This research proposes a DSM-based PDM selection framework model that regroups activities and identifies appropriate PDMs by revealing the dependencies and intensities between activities. The research uses a case to demonstrate the feasibility of the framework. After considering specific project requirements and goals, the framework model can be used as a basis for choosing specific project delivery methods, or as a visualization tool to help owners schedule activities.