Behnam Neyestani
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Behnam Neyestani has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
Joseph Berlin Juanzon
De La Salle University
1 shared publicationJoseph Berlin P. Juanzon
Assist. Professor, Department of Civil Engineering, De La Salle University, Manila
1 shared publication- Joseph Berlin P. Juanzon
Dept. of Civil Engineering-De La Salle University, Ermita, Manila
1 shared publication
Latest Publications
- Open Access
- 29 June 2017
- Published by Center for Open Science in OSF Preprints
Developing an Appropriate Performance Measurement Framework for Total Quality Management in Construction, and other Industries
Total quality management (TQM) is a set of opinions and ideas that widely called “management philosophy”. This management technique is able to assist the construction firms in improving continuously the organization's performance, in order to satisfy customers and survive in the market. The success of TQM implementation is tightly dependent on identifying and selecting the appropriate critical success factors (CSFs), quality tools, and performance measures (KPIs) within TQM framework. Doubtlessly, a set of suitable performance measures (indicators) has a significant role to verify and ensure that TQM implementation can successfully achieve its aims in the organization. Thus, the main purpose of this paper was to develop a suitable framework to assess the effects of TQM implementation on organization's performance in construction industry. For this aim, the study was conducted a comprehensive literature review to specify the existing key performance indicators (KPIs) from 26 TQM frameworks that formulated by scholars. In data analysis, the only 20 KPIs were found of 26 TQM studies. The extracted KPIs (20) classified based on four dimensions of balanced scorecard (BSC), and then arranged from highest to lowest frequency for each perspective of BSC. Finally, a total of ten KPIs were determined and presented within BSC system as an appropriate performance measures framework, which enables evaluating critical areas that very vital to the success of TQM implementation in construction firms at project and enterprise levels.
- 29 June 2017
- Published by Center for Open Science in OSF Preprints
Open AccessDeveloping an Appropriate Performance Measurement Framework for Total Quality Management in Construction, and other Industries
Total quality management (TQM) is a set of opinions and ideas that widely called “management philosophy”. This management technique is able to assist the construction firms in improving continuously the organization's performance, in order to satisfy customers and survive in the market. The success of TQM implementation is tightly dependent on identifying and selecting the appropriate critical success factors (CSFs), quality tools, and performance measures (KPIs) within TQM framework. Doubtlessly, a set of suitable performance measures (indicators) has a significant role to verify and ensure that TQM implementation can successfully achieve its aims in the organization. Thus, the main purpose of this paper was to develop a suitable framework to assess the effects of TQM implementation on organization's performance in construction industry. For this aim, the study was conducted a comprehensive literature review to specify the existing key performance indicators (KPIs) from 26 TQM frameworks that formulated by scholars. In data analysis, the only 20 KPIs were found of 26 TQM studies. The extracted KPIs (20) classified based on four dimensions of balanced scorecard (BSC), and then arranged from highest to lowest frequency for each perspective of BSC. Finally, a total of ten KPIs were determined and presented within BSC system as an appropriate performance measures framework, which enables evaluating critical areas that very vital to the success of TQM implementation in construction firms at project and enterprise levels.
- Open Access
- 9 April 2017
- Published by Center for Open Science in OSF Preprints
Impact of ISO 9001 Certification on the Projects' Success of Large-scale (AAA) Construction Firms in the Philippines
The general purpose of this study is to investigate the effects of ISO 9001 certification on project success, and its main criteria into large-scale construction companies in Metro Manila, Philippines. For this aim, the research was conducted an in-depth literature review for identifying the main variables first. Subsequently, a survey questionnaire was designed, and distributed randomly among 67 managers working in ISO 9001:2008- certified projects of large-scale construction firms. Then the descriptive and inferential statistics analysis employed, in order to find the results and conclusions. Finally, the findings revealed that ISO 9001 certification can significatly affect the construction project success and its main criteria, except time lenght of projects in Metro Manila, Philippines.
- 9 April 2017
- Published by Center for Open Science in OSF Preprints
Open AccessImpact of ISO 9001 Certification on the Projects' Success of Large-scale (AAA) Construction Firms in the Philippines
The general purpose of this study is to investigate the effects of ISO 9001 certification on project success, and its main criteria into large-scale construction companies in Metro Manila, Philippines. For this aim, the research was conducted an in-depth literature review for identifying the main variables first. Subsequently, a survey questionnaire was designed, and distributed randomly among 67 managers working in ISO 9001:2008- certified projects of large-scale construction firms. Then the descriptive and inferential statistics analysis employed, in order to find the results and conclusions. Finally, the findings revealed that ISO 9001 certification can significatly affect the construction project success and its main criteria, except time lenght of projects in Metro Manila, Philippines.
- Open Access
- 1 March 2017
- Published by Elsevier in SSRN Electronic Journal
Quality Costing Technique: An Appropriate Financial Indicator for Reducing Costs and Improving Quality in the Organizations
Quality costing method is one of the total quality management (TQM) tools. This technique is also the most significant financial performance indicator, which can assist the companies to monitor and control their expenses related the quality of products and services during production process, in order to ensure that the firm is able to satisfy the requirements of the customers. Accordingly, the adoption of this method can cause that the companies save money and being more competitive in the market. However, the main purpose of this paper was to explore and discuss regarding the aspects of this TQM tool, and how it can detect unnecessary costs and maintain good quality for products and services with an aim to attain highest level of customer satisfaction in the organizations.
- 1 March 2017
- Published by Elsevier in SSRN Electronic Journal
Open AccessQuality Costing Technique: An Appropriate Financial Indicator for Reducing Costs and Improving Quality in the Organizations
Quality costing method is one of the total quality management (TQM) tools. This technique is also the most significant financial performance indicator, which can assist the companies to monitor and control their expenses related the quality of products and services during production process, in order to ensure that the firm is able to satisfy the requirements of the customers. Accordingly, the adoption of this method can cause that the companies save money and being more competitive in the market. However, the main purpose of this paper was to explore and discuss regarding the aspects of this TQM tool, and how it can detect unnecessary costs and maintain good quality for products and services with an aim to attain highest level of customer satisfaction in the organizations.
- Open Access
- 24 January 2017
- Published by Elsevier in SSRN Electronic Journal
Effects of ISO 9001 Standard on Critical Factors of Project Management in Construction Industry
This paper provides a significant contribution to the knowledge by identifying the impact of ISO 9001 implementation on the most vital factors of project management within large scale (AAA) construction firms in Metro Manila, Philippines. Thus, the study was accomplished an extensive literature review for identifying the main factors of project management, ISO 9001 standard, and other concepts, for developing an appropriate survey instrument. Then the questionnaires were distributed randomly among selected ISO 9001:2008-certified projects of large-scale (AAA) construction firms. For data analysis, the study adopted the descriptive and inferential statistics analysis, in order to find the results and conclusions. Lastly, the findings indicated that ISO 9001 certification can statistically affect the two main factors of project management, except time length of projects in Metro Manila, Philippines.
- 24 January 2017
- Published by Elsevier in SSRN Electronic Journal
Open AccessEffects of ISO 9001 Standard on Critical Factors of Project Management in Construction Industry
This paper provides a significant contribution to the knowledge by identifying the impact of ISO 9001 implementation on the most vital factors of project management within large scale (AAA) construction firms in Metro Manila, Philippines. Thus, the study was accomplished an extensive literature review for identifying the main factors of project management, ISO 9001 standard, and other concepts, for developing an appropriate survey instrument. Then the questionnaires were distributed randomly among selected ISO 9001:2008-certified projects of large-scale (AAA) construction firms. For data analysis, the study adopted the descriptive and inferential statistics analysis, in order to find the results and conclusions. Lastly, the findings indicated that ISO 9001 certification can statistically affect the two main factors of project management, except time length of projects in Metro Manila, Philippines.
- Open Access
- 30 November 2016
- Published by International Journal Of Advanced Research in International Journal of Advanced Research
- Vol. 4 (11) , 1581-1591
IDENTIFICATION OF A SET OF APPROPRIATE CRITICAL SUCCESS FACTORS (CSFS) FOR SUCCESSFUL TQM IMPLEMENTATION IN CONSTRUCTION, AND OTHER INDUSTRIES.
Total quality management (TQM) is a management philosophy that emphasizes on non-stop quality improvement within all aspects of the organizations. Its main aims are to satisfy customers and survive in
- 30 November 2016
- Published by International Journal Of Advanced Research in International Journal of Advanced Research
- Vol. 4 (11) , 1581-1591
Open AccessIDENTIFICATION OF A SET OF APPROPRIATE CRITICAL SUCCESS FACTORS (CSFS) FOR SUCCESSFUL TQM IMPLEMENTATION IN CONSTRUCTION, AND OTHER INDUSTRIES.
Total quality management (TQM) is a management philosophy that emphasizes on non-stop quality improvement within all aspects of the organizations. Its main aims are to satisfy customers and survive in
- Open Access
- 26 November 2016
- Published by IRA Academico Research in IRA-International Journal of Technology & Engineering (ISSN 2455-4480)
- Vol. 5 (2) , 32-44
Developing an Appropriate Performance Measurement Framework for Total Quality Management (TQM) in Construction and Other Industries
Total quality management (TQM) is a set of opinions and ideas that widely called “management philosophy”. This management technique is able to assist the construction firms in improving continuously the organization's performance, in order to satisfy customers and survive in the market. The success of TQM implementation is tightly dependent on identifying and selecting the appropriate critical success factors (CSFs), quality tools, and performance measures (KPIs) within TQM framework. Doubtlessly, a set of suitable performance measures (indicators) has a significant role to verify and ensure that TQM implementation can successfully achieve its aims in the organization. Thus, the main purpose of this paper was to develop a suitable framework to assess the effects of TQM implementation on organization's performance in construction industry. For this aim, the study was conducted a comprehensive literature review to specify the existing key performance indicators (KPIs) from 26 TQM frameworks that formulated by scholars. In data analysis, the only 20 KPIs were found of 26 TQM studies. The extracted KPIs (20) classified based on four dimensions of balanced scorecard (BSC), and then arranged from highest to lowest frequency for each perspective of BSC. Finally, a total of ten KPIs were determined and presented within BSC system as an appropriate performance measures framework, which enables evaluating critical areas that very vital to the success of TQM implementation in construction firms at project and enterprise levels.
- 26 November 2016
- Published by IRA Academico Research in IRA-International Journal of Technology & Engineering (ISSN 2455-4480)
- Vol. 5 (2) , 32-44
Open AccessDeveloping an Appropriate Performance Measurement Framework for Total Quality Management (TQM) in Construction and Other Industries
Total quality management (TQM) is a set of opinions and ideas that widely called “management philosophy”. This management technique is able to assist the construction firms in improving continuously the organization's performance, in order to satisfy customers and survive in the market. The success of TQM implementation is tightly dependent on identifying and selecting the appropriate critical success factors (CSFs), quality tools, and performance measures (KPIs) within TQM framework. Doubtlessly, a set of suitable performance measures (indicators) has a significant role to verify and ensure that TQM implementation can successfully achieve its aims in the organization. Thus, the main purpose of this paper was to develop a suitable framework to assess the effects of TQM implementation on organization's performance in construction industry. For this aim, the study was conducted a comprehensive literature review to specify the existing key performance indicators (KPIs) from 26 TQM frameworks that formulated by scholars. In data analysis, the only 20 KPIs were found of 26 TQM studies. The extracted KPIs (20) classified based on four dimensions of balanced scorecard (BSC), and then arranged from highest to lowest frequency for each perspective of BSC. Finally, a total of ten KPIs were determined and presented within BSC system as an appropriate performance measures framework, which enables evaluating critical areas that very vital to the success of TQM implementation in construction firms at project and enterprise levels.
- Open Access
- 1 November 2016
- Published by Scientific and Literature Open Access Publishing in International research journal of management, IT and social sciences
- Vol. 3 (11) , 35-45
Impact of ISO 9001 Certification on the Projects' Success of Large-Scale (AAA) Construction Firms in the Philippines
Impact of ISO 9001 Certification on the Projects' Success of Large-Scale (AAA) Construction Firms in the Philippines
- 1 November 2016
- Published by Scientific and Literature Open Access Publishing in International research journal of management, IT and social sciences
- Vol. 3 (11) , 35-45
Open AccessImpact of ISO 9001 Certification on the Projects' Success of Large-Scale (AAA) Construction Firms in the Philippines
Impact of ISO 9001 Certification on the Projects' Success of Large-Scale (AAA) Construction Firms in the Philippines
- Open Access
- 1 January 2015
- Published by Elsevier in SSRN Electronic Journal
A Proposed Sustainable Transportation and Urban Mobility Design
The Urban Mobility Design is city's comprehensive resource on street design guidelines, policies, and processes. It aggregates a broad range of resources from nationally recognized engineering and design guidelines. It supplements rather than replaces existing engineering and environmental standards, requirements, or guidelines, such as the Manual on Traffic Control Devices and Policy on Geometric Design of Highways and Streets. In a city with as many varied and complex conditions as Metro Manila, designs should be tailored to the particular needs and opportunities created by the local context, uses, and dimensions of streets. The purpose of this study is to find the problems of transportation and mobility, and likewise propose the appropriate solutions based on principles of sustainability in city's transportation.
- 1 January 2015
- Published by Elsevier in SSRN Electronic Journal
Open AccessA Proposed Sustainable Transportation and Urban Mobility Design
The Urban Mobility Design is city's comprehensive resource on street design guidelines, policies, and processes. It aggregates a broad range of resources from nationally recognized engineering and design guidelines. It supplements rather than replaces existing engineering and environmental standards, requirements, or guidelines, such as the Manual on Traffic Control Devices and Policy on Geometric Design of Highways and Streets. In a city with as many varied and complex conditions as Metro Manila, designs should be tailored to the particular needs and opportunities created by the local context, uses, and dimensions of streets. The purpose of this study is to find the problems of transportation and mobility, and likewise propose the appropriate solutions based on principles of sustainability in city's transportation.
- Open Access
- 1 March 2011
- Published by Elsevier in SSRN Electronic Journal
Specified Tests for Concrete Quality
Concrete is unique among construction materials in that it requires various degrees of processing between arriving on site and being placed, compacted, finished and cured. This is true whether the concrete is site batched or arrives ready mixed. It is therefore necessary to sample the concrete and conduct concrete testing to ensure that it complies with the requirements of the project specification.
- 1 March 2011
- Published by Elsevier in SSRN Electronic Journal
Open AccessSpecified Tests for Concrete Quality
Concrete is unique among construction materials in that it requires various degrees of processing between arriving on site and being placed, compacted, finished and cured. This is true whether the concrete is site batched or arrives ready mixed. It is therefore necessary to sample the concrete and conduct concrete testing to ensure that it complies with the requirements of the project specification.