N. S. Harish Kumar
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
N. S. Harish Kumar has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
Ch. S. N. Murthy
Department of Mining Engineering, National Institute of Technology Karnataka, Surathkal, Mangalore, Karnataka, India
4 shared publicationsR. P. Choudhary
Department of Mining Engineering, National Institute of Technology Karnataka, Surathkal, Mangalore, Karnataka, India
3 shared publications- Chivukula Surya Narayana Murthy
Department of Mining Engineering, National Institute of Technology Karnataka, Mangalore, India
2 shared publications - R. P. Choudhary
Department of Mining Engineering, Faculty of Engineering, Jai Narain Vyas University, Jodhpur 342011, India
2 shared publications - Ram Prasad Choudhary
Department of Mining Engineering, MBM Engineering College, JNV University, Jodhpur, India
1 shared publication
Latest Publications
- 25 July 2020
- Published by Springer Nature in Modeling Earth Systems and Environment
- Vol. 7 (3) , 1727-1738
Reliability-based analysis of probability density function and failure rate of the shovel–dumper system in a surface coal mine
- 25 July 2020
- Published by Springer Nature in Modeling Earth Systems and Environment
- Vol. 7 (3) , 1727-1738
Reliability-based analysis of probability density function and failure rate of the shovel–dumper system in a surface coal mine
- 1 June 2020
- Published by Taylor & Francis in Safety and Reliability
- Vol. 39 (3-4) , 215-229
Model based reliability analysis of shovel – dumper system’s mechanical failures used in the surface coal mine: a case study
In a surface coal mine, efficient usage of shovels and dumpers should be most reliable and available to reach their production target. Keeping this in mind, this study was carried out at a surface coal mine, which is located at Open Cast-I, The SCCL, Kothagudem area, Telangana. The mechanical failure data such as time between failures (TBF) and time to repair (TTR) of each sub-system of a shovel-dumper system were collected and analysed statistically and graphically for reliability and availability. Graphical methods such as trend test and series correlation test and Chi-squared test were used to validate the independent, identically distribution of mean time between failures and mean and time to repair for the same a shovel and dumpers. Statistically, the Weibull distribution is selected as it was found the best-fit distribution by the Kolmogorov-Smirnov (K-S) test using Isograph Reliability Workbench. In K-S test, it was found that shovel KS1 has reliability of 0.2682 and dumpers BD1, BD2, KD2 and KD4 had reliability of 0.3731, 0.2850, 0.2897 and 0.2962, respectively for the 1 year of working hours. Also, calculated reliability- based time interval for preventive maintenance to achieve 70, 80 and 90%, respectively of reliability for same shovel-dumper system.
- 1 June 2020
- Published by Taylor & Francis in Safety and Reliability
- Vol. 39 (3-4) , 215-229
Model based reliability analysis of shovel – dumper system’s mechanical failures used in the surface coal mine: a case study
In a surface coal mine, efficient usage of shovels and dumpers should be most reliable and available to reach their production target. Keeping this in mind, this study was carried out at a surface coal mine, which is located at Open Cast-I, The SCCL, Kothagudem area, Telangana. The mechanical failure data such as time between failures (TBF) and time to repair (TTR) of each sub-system of a shovel-dumper system were collected and analysed statistically and graphically for reliability and availability. Graphical methods such as trend test and series correlation test and Chi-squared test were used to validate the independent, identically distribution of mean time between failures and mean and time to repair for the same a shovel and dumpers. Statistically, the Weibull distribution is selected as it was found the best-fit distribution by the Kolmogorov-Smirnov (K-S) test using Isograph Reliability Workbench. In K-S test, it was found that shovel KS1 has reliability of 0.2682 and dumpers BD1, BD2, KD2 and KD4 had reliability of 0.3731, 0.2850, 0.2897 and 0.2962, respectively for the 1 year of working hours. Also, calculated reliability- based time interval for preventive maintenance to achieve 70, 80 and 90%, respectively of reliability for same shovel-dumper system.
- 27 July 2019
- Published by Springer Nature
- p. 293-302
Evolution of the Probability Distribution Function of Shovel – Dumper Combination in Opencast Coal Mine Using ANN and RWB
- 27 July 2019
- Published by Springer Nature
- p. 293-302
Evolution of the Probability Distribution Function of Shovel – Dumper Combination in Opencast Coal Mine Using ANN and RWB
- 3 June 2019
- Published by Springer Nature in Modeling Earth Systems and Environment
- Vol. 5 (4) , 1607-1613
Evolution of the probability distribution function of shovel–dumper combination in open cast limestone mine using RWB and ANN: a case study
- 3 June 2019
- Published by Springer Nature in Modeling Earth Systems and Environment
- Vol. 5 (4) , 1607-1613
Evolution of the probability distribution function of shovel–dumper combination in open cast limestone mine using RWB and ANN: a case study
- 30 December 2018
- Published by International Information and Engineering Technology Association in Mathematical Modelling of Engineering Problems
- Vol. 5 (4) , 373-378
Reliability-based preventive maintainability analysis of shovel-dumper system in surface coal mine using ANN and isograph reliability workbench
- 30 December 2018
- Published by International Information and Engineering Technology Association in Mathematical Modelling of Engineering Problems
- Vol. 5 (4) , 373-378
Reliability-based preventive maintainability analysis of shovel-dumper system in surface coal mine using ANN and isograph reliability workbench
- 1 January 2018
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 1943, 020007
Failure rate and reliability of the KOMATSU hydraulic excavator in surface limestone mine
- 1 January 2018
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 1943, 020007
Failure rate and reliability of the KOMATSU hydraulic excavator in surface limestone mine