Ahmed Khalafallah
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Ahmed Khalafallah has a total of 36 co-authors. Here are the top co-authors by number of shared publications:
Khaled El-Rayes
3 shared publications- Khaled Hesham Hyari
Professor of Construction Engineering and Management, Dept. of Civil Engineering, Faculty of Engineering, The Hashemite Univ., Zarqa 13133, Jordan. ORCID:
3 shared publications - Mohamed Abdel-Raheem
Ph.D. Candidate, Department of Civil, Environmental and Construction Engineering, University of Central Florida, 4000 Central Florida Blvd. Orlando, Florida, 32816, USA
3 shared publications - Georgios Kapogiannis
Warwick Manufacturing Group, University of Warwick
2 shared publications - Khaled El-Rayes
Associate Professor, Dept. of Civil Engineering, Univ. of Qatar, P.O. Box 2713, Doha, Qatar
2 shared publications Michael Gerges
University of Wolverhampton Faculty of Science and Engineering Wolverhampton
2 shared publications
Latest Publications
- 1 January 2027
- Published by American Society of Civil Engineers (ASCE) in Journal of Hazardous, Toxic, and Radioactive Waste
- Vol. 31  (1) , 04026042
Controlling the Hazards of Hydrogen Sulfide Exposure in the Construction Industry
Hydrogen sulfide (H 2 S) is a highly toxic gas often encountered in various industrial settings, including the construction industry. When H 2 S is encountered in construction environments, it not only poses severe health risks to workers but also causes project delays and economic losses. In this study, a quantitative survey was conducted to assess construction professionals’ awareness of H 2 S hazards, evaluate the impacts of regulatory measures on project performance, and identify effective mitigation measures. A structured online survey was administered to 59 construction engineers and professionals in Kuwait, and the responses were analyzed using descriptive and inferential statistics in SPSS. The results revealed significant gaps in hazard awareness, with 41.1% of the respondents incorrectly identifying H 2 S as a harmless gas. While 61.4% reported preemptive testing of H 2 S concentrations during groundwater pumping, nearly half of the participants reported no regular training on H 2 S management. H 2 S emissions negatively impact safety (81.0%), cost (79.3%), and schedule (75.9%). Effective mitigation measures identified include implementing water treatment systems (59.6%), installing on-site gas monitoring labs (49.1%), and utilizing exhaust ventilation in confined spaces (54.4%). The findings underscore the need for enhanced training protocols, stricter enforcement of safety regulations, and the integration of proactive engineering controls to reduce occupational hazards, protect worker health, and ensure project delivery in H 2 S-prone environments.
- 1 January 2027
- Published by American Society of Civil Engineers (ASCE) in Journal of Hazardous, Toxic, and Radioactive Waste
- Vol. 31  (1) , 04026042
Controlling the Hazards of Hydrogen Sulfide Exposure in the Construction Industry
Hydrogen sulfide (H 2 S) is a highly toxic gas often encountered in various industrial settings, including the construction industry. When H 2 S is encountered in construction environments, it not only poses severe health risks to workers but also causes project delays and economic losses. In this study, a quantitative survey was conducted to assess construction professionals’ awareness of H 2 S hazards, evaluate the impacts of regulatory measures on project performance, and identify effective mitigation measures. A structured online survey was administered to 59 construction engineers and professionals in Kuwait, and the responses were analyzed using descriptive and inferential statistics in SPSS. The results revealed significant gaps in hazard awareness, with 41.1% of the respondents incorrectly identifying H 2 S as a harmless gas. While 61.4% reported preemptive testing of H 2 S concentrations during groundwater pumping, nearly half of the participants reported no regular training on H 2 S management. H 2 S emissions negatively impact safety (81.0%), cost (79.3%), and schedule (75.9%). Effective mitigation measures identified include implementing water treatment systems (59.6%), installing on-site gas monitoring labs (49.1%), and utilizing exhaust ventilation in confined spaces (54.4%). The findings underscore the need for enhanced training protocols, stricter enforcement of safety regulations, and the integration of proactive engineering controls to reduce occupational hazards, protect worker health, and ensure project delivery in H 2 S-prone environments.
- 5 June 2025
- Published by Emerald Publishing in Proceedings of the Institution of Civil Engineers - Engineering Sustainability
- Vol. 179  (2) , 169-181
Barriers to adopting solar photovoltaics (PV) systems in healthcare projects in Qatar
This study investigates the integration of solar photovoltaic (PV) systems in Qatar’s healthcare industry, aligning with the nation’s goals to lower emissions by addressing renewable energy adoption challenges. Utilising a quantitative approach, the research involved surveying healthcare professionals to pinpoint key elements affecting solar PV system implementation. The findings highlight barriers including institutional, financial, technical, and social aspects, with policy gaps and financial limitations—such as high upfront and running costs—identified as major obstacles. Contrary to common beliefs, the research revealed a lesser impact from aspects stakeholder readiness and concerns over system dependability. Examining more than 15 factors, the study emphasises the necessity of strong policyframeworks and financial mechanisms to boost solar PV system uptake. This research provides critical insights into the nuanced factors influencing renewable energy adoption in healthcare, serving as a crucial guide for policymakers and establishing a foundation for further research that could expand to the wider Gulf region.
- 5 June 2025
- Published by Emerald Publishing in Proceedings of the Institution of Civil Engineers - Engineering Sustainability
- Vol. 179  (2) , 169-181
Barriers to adopting solar photovoltaics (PV) systems in healthcare projects in Qatar
This study investigates the integration of solar photovoltaic (PV) systems in Qatar’s healthcare industry, aligning with the nation’s goals to lower emissions by addressing renewable energy adoption challenges. Utilising a quantitative approach, the research involved surveying healthcare professionals to pinpoint key elements affecting solar PV system implementation. The findings highlight barriers including institutional, financial, technical, and social aspects, with policy gaps and financial limitations—such as high upfront and running costs—identified as major obstacles. Contrary to common beliefs, the research revealed a lesser impact from aspects stakeholder readiness and concerns over system dependability. Examining more than 15 factors, the study emphasises the necessity of strong policyframeworks and financial mechanisms to boost solar PV system uptake. This research provides critical insights into the nuanced factors influencing renewable energy adoption in healthcare, serving as a crucial guide for policymakers and establishing a foundation for further research that could expand to the wider Gulf region.
- 15 February 2024
- Published by Taylor & Francis in Environmental Technology
- Vol. 45  (27) , 5956-5965
Solar roads – a new potential renewable energy for Great Britain
Global warming has become a much more realised issue and an immediate threat, accelerating due to the anthropogenic carbon release associated with escalating energy demand. Consequently, pressures are building up to reduce anthropogenic carbon footprint by employing renewable energy resources, among which solar energy is the main. Solar roads are a new and innovative concept as they do not require land to be specifically allocated. This is because the road infrastructure already exists. Therefore, this emerging technique of embedding solar panels into pavements and roadways is becoming a more attractive proposition. However, a hurdle to its successful application is the lack of knowledge regarding its feasibility and viability. This study aims to evaluate the potential of solar roads to inform future feasibility and viability studies in varying contexts and implications. Within the scope of this study, the case of Great Britain is considered to evaluate the potential of how much energy can be generated via the solar roads technology that can be embedded in the country's road infrastructure. A mathematical exercise is performed in which calculations are executed to develop a basic numerical model of the potential. Therefore, the study is quantitative, and the factors considered include seasonal changes, average daily traffic covering roads, tree and building shades, road types and sizes, solar irradiance, solar panel types, and alike. It is estimated that solar roads may supply up to 96.42% of the UK's total electricity, which is a substantially promising potential.
- 15 February 2024
- Published by Taylor & Francis in Environmental Technology
- Vol. 45  (27) , 5956-5965
Solar roads – a new potential renewable energy for Great Britain
Global warming has become a much more realised issue and an immediate threat, accelerating due to the anthropogenic carbon release associated with escalating energy demand. Consequently, pressures are building up to reduce anthropogenic carbon footprint by employing renewable energy resources, among which solar energy is the main. Solar roads are a new and innovative concept as they do not require land to be specifically allocated. This is because the road infrastructure already exists. Therefore, this emerging technique of embedding solar panels into pavements and roadways is becoming a more attractive proposition. However, a hurdle to its successful application is the lack of knowledge regarding its feasibility and viability. This study aims to evaluate the potential of solar roads to inform future feasibility and viability studies in varying contexts and implications. Within the scope of this study, the case of Great Britain is considered to evaluate the potential of how much energy can be generated via the solar roads technology that can be embedded in the country's road infrastructure. A mathematical exercise is performed in which calculations are executed to develop a basic numerical model of the potential. Therefore, the study is quantitative, and the factors considered include seasonal changes, average daily traffic covering roads, tree and building shades, road types and sizes, solar irradiance, solar panel types, and alike. It is estimated that solar roads may supply up to 96.42% of the UK's total electricity, which is a substantially promising potential.
- Open Access
- 9 November 2023
- Published by Emirates Scholar in Emirati Journal of Civil Engineering and Applications
- Vol. 1  (1) , 70-88
SLOW ADOPTION OF BUILDING INFORMATION MODELING: COMPARING VIEWPOINTS OF DESIGNERS AND CONTRACTORS
The slow adoption of Building Information Modeling (BIM) technology poses significant problems for the construction industry in the Middle East. The root causes of this issue are purported to include a lack of understanding of its benefits and the existence of barriers to its adoption. This study investigates the slow adoption of BIM technology in the Middle East to identify solutions to facilitate BIM adoption and approaches by which stakeholders can transform to utilizing BIM. The main objectives of this research are to: (1) examine the attitudes and readiness of construction stakeholders for BIM, (2) investigate the extent to which there is a lack of understanding of BIM benefits, (3) explore the barriers that hinder BIM adoption, and (4) identify the solutions recommended by the industry experts to promote BIM utilization. The study also compares the viewpoints of designers and contractors to identify potential differences. A questionnaire survey has been devised to gather data from stakeholder firms and experienced BIM professionals. The results revealed that the viewpoints of designers and contractors generally align, except when it comes to recognizing a few benefits such as the generation of accurate and consistent 2D drawings, achieving greater predictability in project time, enhancing communication among project stakeholders, minimizing change orders, and mitigating redesign issues. Similarly, there was a difference in recognizing a few barriers, namely, the lack of skilled personnel and the cost of training existing staff. Furthermore, the analysis led to the conclusion that the most notable advantage of BIM is improved conflict detection, and the most significant barrier is the lack of BIM training. The research culminated in offering recommendations for addressing the industry's BIM-related challenges. These suggestions encompassed raising awareness of BIM as a robust design and construction tool, supporting construction firms for adopting BIM techniques, and identifying methods to streamline the implementation process within these firms.
- 9 November 2023
- Published by Emirates Scholar in Emirati Journal of Civil Engineering and Applications
- Vol. 1  (1) , 70-88
Open AccessSLOW ADOPTION OF BUILDING INFORMATION MODELING: COMPARING VIEWPOINTS OF DESIGNERS AND CONTRACTORS
The slow adoption of Building Information Modeling (BIM) technology poses significant problems for the construction industry in the Middle East. The root causes of this issue are purported to include a lack of understanding of its benefits and the existence of barriers to its adoption. This study investigates the slow adoption of BIM technology in the Middle East to identify solutions to facilitate BIM adoption and approaches by which stakeholders can transform to utilizing BIM. The main objectives of this research are to: (1) examine the attitudes and readiness of construction stakeholders for BIM, (2) investigate the extent to which there is a lack of understanding of BIM benefits, (3) explore the barriers that hinder BIM adoption, and (4) identify the solutions recommended by the industry experts to promote BIM utilization. The study also compares the viewpoints of designers and contractors to identify potential differences. A questionnaire survey has been devised to gather data from stakeholder firms and experienced BIM professionals. The results revealed that the viewpoints of designers and contractors generally align, except when it comes to recognizing a few benefits such as the generation of accurate and consistent 2D drawings, achieving greater predictability in project time, enhancing communication among project stakeholders, minimizing change orders, and mitigating redesign issues. Similarly, there was a difference in recognizing a few barriers, namely, the lack of skilled personnel and the cost of training existing staff. Furthermore, the analysis led to the conclusion that the most notable advantage of BIM is improved conflict detection, and the most significant barrier is the lack of BIM training. The research culminated in offering recommendations for addressing the industry's BIM-related challenges. These suggestions encompassed raising awareness of BIM as a robust design and construction tool, supporting construction firms for adopting BIM techniques, and identifying methods to streamline the implementation process within these firms.
- 1 November 2023
- Published by American Society of Civil Engineers (ASCE) in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Vol. 15  (4)
A Legitimate Alternative for Unbalanced Bidding in Unit Price Contracts
- 1 November 2023
- Published by American Society of Civil Engineers (ASCE) in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Vol. 15  (4)
A Legitimate Alternative for Unbalanced Bidding in Unit Price Contracts
- 1 February 2023
- Published by American Society of Civil Engineers (ASCE) in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Vol. 15  (1) , 04522034
Litigation versus Judicial Arbitration as Binding Dispute Settlement Techniques in Public Construction Projects
Dispute resolution is employed to assist project parties in overcoming situational friction and to help them move ahead with project execution. Understanding available binding dispute resolution methods and selecting a proper resolution method can reduce the negative impact of disputes on construction duration and cost. In many countries, dispute resolution is limited and is channeled through official agencies; litigation and judicial arbitration are adopted as binding settlement techniques. This study compared litigation and judicial arbitration in Kuwait by analyzing a sample of 98 real cases collected through convenience sampling from a population of around 1,000 cases that took place between 1995 and 2018. The collected cases consisted of 48 litigation cases and 50 cases of judicial arbitration and represented all the cases available to the research team from Kuwait’s Ministry of Justice. The study’s main objectives were to (1) characterize the time and cost effectiveness of the two techniques and investigate their influencing factors; (2) collect and analyze real data on litigation and judicial arbitration; and (3) compare the two techniques in order to identify their value to owners and contractors. Data on litigation and judicial arbitration cases were categorized according to claim values. It was found that the litigation process consumed more time than judicial arbitration due to multiple legal levels of courts. When claim values exceeded $1.6 million, the results showed that judicial arbitration was more cost effective, but it was not always legally applicable. In contrast, when claim values were below $1.5 million, contrary to existing beliefs, the results showed that judicial arbitration can be more costly than litigation. These findings will help stakeholders better understand both methods and their suitability for settling disputes.
- 1 February 2023
- Published by American Society of Civil Engineers (ASCE) in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Vol. 15  (1) , 04522034
Litigation versus Judicial Arbitration as Binding Dispute Settlement Techniques in Public Construction Projects
Dispute resolution is employed to assist project parties in overcoming situational friction and to help them move ahead with project execution. Understanding available binding dispute resolution methods and selecting a proper resolution method can reduce the negative impact of disputes on construction duration and cost. In many countries, dispute resolution is limited and is channeled through official agencies; litigation and judicial arbitration are adopted as binding settlement techniques. This study compared litigation and judicial arbitration in Kuwait by analyzing a sample of 98 real cases collected through convenience sampling from a population of around 1,000 cases that took place between 1995 and 2018. The collected cases consisted of 48 litigation cases and 50 cases of judicial arbitration and represented all the cases available to the research team from Kuwait’s Ministry of Justice. The study’s main objectives were to (1) characterize the time and cost effectiveness of the two techniques and investigate their influencing factors; (2) collect and analyze real data on litigation and judicial arbitration; and (3) compare the two techniques in order to identify their value to owners and contractors. Data on litigation and judicial arbitration cases were categorized according to claim values. It was found that the litigation process consumed more time than judicial arbitration due to multiple legal levels of courts. When claim values exceeded $1.6 million, the results showed that judicial arbitration was more cost effective, but it was not always legally applicable. In contrast, when claim values were below $1.5 million, contrary to existing beliefs, the results showed that judicial arbitration can be more costly than litigation. These findings will help stakeholders better understand both methods and their suitability for settling disputes.
- 1 November 2020
- Published by American Society of Civil Engineers (ASCE) in Journal of Waterway, Port, Coastal, and Ocean Engineering
- Vol. 146  (6) , 04020040
Port Construction Planning: Automated System for Projecting Expansion Needs
The growing demand for maritime transport imposes several challenges to port authorities, including reducing port congestion, planning for expansion projects, and allocating budgets for such capital projects. To address these construction planning problems, there is a vital need to identify the factors that influence port congestion and understand their impact on port expansion and reconstruction planning. This study focuses on: (1) identifying the decision variables that influence port expansion and reconstruction decisions; (2) modeling the impacts of these variables on the decision to expand a port; and (3) developing an automated system to forecast port expansion needs. The automated system employs a mixed-integer nonlinear programming model that is designed to predict port performance, given a projected increase in cargo demand. The developed model is empirically validated using real data acquired from Shuwaikh Port. For the projected 1.8% increase in cargo demand, it was concluded that the port will need expansion in 8 years. The present study contributes to the core body of knowledge of port construction engineering and management by providing a novel model and a practical automated system for projecting port expansion needs using real-time port data. This should prove useful to port authorities and construction planners as it facilitates the advancement of port construction planning, enhances port operational safety, and provides the capacity to predict port expansion and modernization needs.
- 1 November 2020
- Published by American Society of Civil Engineers (ASCE) in Journal of Waterway, Port, Coastal, and Ocean Engineering
- Vol. 146  (6) , 04020040
Port Construction Planning: Automated System for Projecting Expansion Needs
The growing demand for maritime transport imposes several challenges to port authorities, including reducing port congestion, planning for expansion projects, and allocating budgets for such capital projects. To address these construction planning problems, there is a vital need to identify the factors that influence port congestion and understand their impact on port expansion and reconstruction planning. This study focuses on: (1) identifying the decision variables that influence port expansion and reconstruction decisions; (2) modeling the impacts of these variables on the decision to expand a port; and (3) developing an automated system to forecast port expansion needs. The automated system employs a mixed-integer nonlinear programming model that is designed to predict port performance, given a projected increase in cargo demand. The developed model is empirically validated using real data acquired from Shuwaikh Port. For the projected 1.8% increase in cargo demand, it was concluded that the port will need expansion in 8 years. The present study contributes to the core body of knowledge of port construction engineering and management by providing a novel model and a practical automated system for projecting port expansion needs using real-time port data. This should prove useful to port authorities and construction planners as it facilitates the advancement of port construction planning, enhances port operational safety, and provides the capacity to predict port expansion and modernization needs.
- 1 November 2019
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 145  (11)
Change Orders: Automating Comparative Data Analysis and Controlling Impacts in Public Projects
Change orders grant public-project owners exceptional flexibility to alleviate construction problems and respond promptly to project needs. Recently, in the Middle East, change orders have become common, leading to significant major problems and disputes. The negative impacts of this phenomenon on project cost and time create a critical need for systems that enable public agencies to identify the technical causes of change orders and investigate their impacts in order to prepare relevant response strategies. This study presents the development of a model for change-order data analysis that is capable of quantifying the impact of change orders on project cost and time. The model incorporates newly developed elements that enable (1) identifying the leading technical causes of change orders by project type and instigator; (2) quantifying the influence of project type and size on change-order cost and duration; and (3) automating the development of periodic reports that can be used to mitigate the negative impacts of change orders. To illustrate the viability of the developed model, a computerized system was developed and populated with data collected from 38 public projects that included 67 change orders. The leading technical causes of change orders identified through record analysis were poor definition of work scope, lack of coordination with authorities, and unplanned interruptions. An inverse exponential relationship is observed between the project size and both the percent time change and percent cost change of change orders. In projects that experienced scope-of-work changes, the percent time and cost changes were substantially higher compared with projects without scope-of-work changes. The paper’s primary contributions to the overall body of knowledge are (1) the development of a standard model to facilitate and automate the comparative analysis of change-order data across public-project types and sizes; and (2) the empirical demonstration of its viability for the analysis of change-order data.
- 1 November 2019
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 145  (11)
Change Orders: Automating Comparative Data Analysis and Controlling Impacts in Public Projects
Change orders grant public-project owners exceptional flexibility to alleviate construction problems and respond promptly to project needs. Recently, in the Middle East, change orders have become common, leading to significant major problems and disputes. The negative impacts of this phenomenon on project cost and time create a critical need for systems that enable public agencies to identify the technical causes of change orders and investigate their impacts in order to prepare relevant response strategies. This study presents the development of a model for change-order data analysis that is capable of quantifying the impact of change orders on project cost and time. The model incorporates newly developed elements that enable (1) identifying the leading technical causes of change orders by project type and instigator; (2) quantifying the influence of project type and size on change-order cost and duration; and (3) automating the development of periodic reports that can be used to mitigate the negative impacts of change orders. To illustrate the viability of the developed model, a computerized system was developed and populated with data collected from 38 public projects that included 67 change orders. The leading technical causes of change orders identified through record analysis were poor definition of work scope, lack of coordination with authorities, and unplanned interruptions. An inverse exponential relationship is observed between the project size and both the percent time change and percent cost change of change orders. In projects that experienced scope-of-work changes, the percent time and cost changes were substantially higher compared with projects without scope-of-work changes. The paper’s primary contributions to the overall body of knowledge are (1) the development of a standard model to facilitate and automate the comparative analysis of change-order data across public-project types and sizes; and (2) the empirical demonstration of its viability for the analysis of change-order data.
- 1 October 2019
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 145  (10)
Bilevel Standards-Compliant Platform for Evaluating Building Contractor Safety
In building construction, contractors are typically selected through competitive bidding or negotiated contracting, in which the project price is the major selection criterion. A contractor’s safety performance is still not a major selection criterion, despite the existence of numerous safety prequalification methods. The negative repercussions of such apathy create a critical need for systems that enable owners to evaluate contractor safety performance and facilitate the selection of safety-conscious contractors by virtue of their good safety practices. This study presents the development of a computerized platform for evaluating contractor safety performance that is capable of analyzing contractors’ safety performance data. The platform incorporates newly developed parameters that enable (1) including leading and lagging safety indicators that depict current and past contractor safety performance; (2) conducting analysis on both the organizational and project levels; and (3) satisfying the requirements of international safety standards. This research contributes to the existing body of knowledge by presenting a validated standard-compliant set of 10 indicators and 71 metrics that facilitate evaluating contractor safety performance and establishing their significance analytically. This should prove useful to decision makers and researchers alike and is a step forward to facilitate including contractor safety performance among major selection criteria, which can ultimately bring significant improvements to the building industry’s safety.
- 1 October 2019
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 145  (10)
Bilevel Standards-Compliant Platform for Evaluating Building Contractor Safety
In building construction, contractors are typically selected through competitive bidding or negotiated contracting, in which the project price is the major selection criterion. A contractor’s safety performance is still not a major selection criterion, despite the existence of numerous safety prequalification methods. The negative repercussions of such apathy create a critical need for systems that enable owners to evaluate contractor safety performance and facilitate the selection of safety-conscious contractors by virtue of their good safety practices. This study presents the development of a computerized platform for evaluating contractor safety performance that is capable of analyzing contractors’ safety performance data. The platform incorporates newly developed parameters that enable (1) including leading and lagging safety indicators that depict current and past contractor safety performance; (2) conducting analysis on both the organizational and project levels; and (3) satisfying the requirements of international safety standards. This research contributes to the existing body of knowledge by presenting a validated standard-compliant set of 10 indicators and 71 metrics that facilitate evaluating contractor safety performance and establishing their significance analytically. This should prove useful to decision makers and researchers alike and is a step forward to facilitate including contractor safety performance among major selection criteria, which can ultimately bring significant improvements to the building industry’s safety.
- 1 September 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Computing in Civil Engineering
- Vol. 32  (5)
Optimization Parameter Variation: Improving Biobjective Optimization of Temporary Facility Planning
Recent research interest in nondominated sorting genetic optimization has increased remarkably due to its effectiveness in handling multiple objectives without scalarization. Algorithms for these evolutionary optimization methods have been used to solve a wide variety of civil engineering optimization problems. Despite the effectiveness of these algorithms, their optimization parameter tuning is a time-consuming process that, if improperly executed, can hinder performance and lead to premature convergence toward incomplete, suboptimal Pareto fronts. Existing tuning methods either require a substantial amount of time or rely on inadequate methods. The main objective of this study is to investigate the performance of these algorithms under the effect of optimization parameter variation. Using a biobjective benchmark problem on optimizing temporary facility planning, the study specifically investigates the effects of varying the population size, number of generations, crossover type, probability of crossover, and mutation rate on the algorithm behavior. The results are used to recommend strategies for parameter tuning in order to accelerate convergence toward optimal Pareto fronts and improve solution dispersion ranges for biobjective optimization problems. The findings of this study should prove most useful to scholars and construction planners, especially those who are involved in temporary facility planning.
- 1 September 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Computing in Civil Engineering
- Vol. 32  (5)
Optimization Parameter Variation: Improving Biobjective Optimization of Temporary Facility Planning
Recent research interest in nondominated sorting genetic optimization has increased remarkably due to its effectiveness in handling multiple objectives without scalarization. Algorithms for these evolutionary optimization methods have been used to solve a wide variety of civil engineering optimization problems. Despite the effectiveness of these algorithms, their optimization parameter tuning is a time-consuming process that, if improperly executed, can hinder performance and lead to premature convergence toward incomplete, suboptimal Pareto fronts. Existing tuning methods either require a substantial amount of time or rely on inadequate methods. The main objective of this study is to investigate the performance of these algorithms under the effect of optimization parameter variation. Using a biobjective benchmark problem on optimizing temporary facility planning, the study specifically investigates the effects of varying the population size, number of generations, crossover type, probability of crossover, and mutation rate on the algorithm behavior. The results are used to recommend strategies for parameter tuning in order to accelerate convergence toward optimal Pareto fronts and improve solution dispersion ranges for biobjective optimization problems. The findings of this study should prove most useful to scholars and construction planners, especially those who are involved in temporary facility planning.