Kaspar Vereide
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Kaspar Vereide has a total of 26 co-authors. Here are the top co-authors by number of shared publications:
- Leif Lia
Department of Civil and Environmental Engineering, Norwegian University of Science and Technology, S.P. Andersens veg 5, 7491 Trondheim, Norway
4 shared publications Leif Lia
3 shared publications- Livia Pitorac
Ph.D. Candidate, Dept. of Civil and Environmental Engineering, Norwegian Univ. of Science and Technology, S. P. Andersens veg 5, Trondheim 7031, Norway. ORCID:
3 shared publications - Krishna Kanta Panthi
Norwegian University of Science and Technology
2 shared publications - Ola Haugen Havrevoll
Department of Civil and Environmental Engineering, Norwegian University of Science and Technology (NTNU), S. P. Andersens veg 5, 7031 Trondheim, Norway
2 shared publications Arne Kollandsrud
1 shared publication
Latest Publications
- Open Access
- 20 December 2025
- Published by Elsevier in Energy Conversion and Management: X
- Vol. 29
Prevent a premature death of a 300 MW hydropower plant: upgrading Tekeze hydropower plant
- 20 December 2025
- Published by Elsevier in Energy Conversion and Management: X
- Vol. 29
Open AccessPrevent a premature death of a 300 MW hydropower plant: upgrading Tekeze hydropower plant
- Open Access
- 23 May 2024
- Published by Elsevier in Renewable Energy
- Vol. 229
The boosterpump concept for reconstruction of hydropower plants to pumped storage plants
- 23 May 2024
- Published by Elsevier in Renewable Energy
- Vol. 229
Open AccessThe boosterpump concept for reconstruction of hydropower plants to pumped storage plants
- Open Access
Application of Three-Dimensional CFD Model to Determination of the Capacity of Existing Tyrolean Intake
CFD models of intakes in high-head hydropower systems are rare due to the lack of geometric data and cost of modeling. This study tests two different types of software to see how modeling can be performed in a cost-effective way with scarce input data and still have sufficient accuracy. The volume of fluid (VoF) model simulations are conducted using both ANSYS Fluent and OpenFOAM. The geometry is modelled from Google Earth satellite images, drone scanning data, and design drawings from the construction period and supported by field observations for extra quality control. From the model, both capacity parameters and flow pattern are calculated. For capacity, the factor is calculated and compared with the literature. The simulations are conducted for a Tyrolean weir with rectangular bars (flat steel) in the rack. Simulated flow patterns through the rack with ANSYS Fluent and OpenFOAM are compared. OpenFOAM simulations yielded 15% to 20% higher water levels compared to the VOF model applied in Ansys Fluent. Also, when the flow rate was high, the water capture capacity calculated with ANSYS Fluent was 10% higher than that obtained with OpenFOAM. However, considering the total simulation times, modeling with OpenFOAM offered approximately 11% faster results.Open AccessApplication of Three-Dimensional CFD Model to Determination of the Capacity of Existing Tyrolean Intake
CFD models of intakes in high-head hydropower systems are rare due to the lack of geometric data and cost of modeling. This study tests two different types of software to see how modeling can be performed in a cost-effective way with scarce input data and still have sufficient accuracy. The volume of fluid (VoF) model simulations are conducted using both ANSYS Fluent and OpenFOAM. The geometry is modelled from Google Earth satellite images, drone scanning data, and design drawings from the construction period and supported by field observations for extra quality control. From the model, both capacity parameters and flow pattern are calculated. For capacity, the factor is calculated and compared with the literature. The simulations are conducted for a Tyrolean weir with rectangular bars (flat steel) in the rack. Simulated flow patterns through the rack with ANSYS Fluent and OpenFOAM are compared. OpenFOAM simulations yielded 15% to 20% higher water levels compared to the VOF model applied in Ansys Fluent. Also, when the flow rate was high, the water capture capacity calculated with ANSYS Fluent was 10% higher than that obtained with OpenFOAM. However, considering the total simulation times, modeling with OpenFOAM offered approximately 11% faster results. - Open Access
Hydraulic Transient Impact on Surrounding Rock Mass of Unlined Pressure Tunnels
The frequent pressure pulsations due to hydraulic transients in hydropower plants induce cyclic loading on the rock mass that may contribute to increased instances of block falls and increased risk of tunnel collapse over the power plant lifetime. This study focuses on understanding the effect of frequent start and stop sequences of hydropower in unlined pressure tunnels. For this purpose, data from a pore water pressure monitoring system is utilized, which was installed at the downstream end of the headrace tunnel at the 50 MW Roskrepp hydropower plant in southern Norway. The objective of this study is to analyze the recorded data and quantify the impact of the hydraulic transient on the surrounding rock mass in the unlined pressure tunnel. The monitoring of pressure data over several years clearly shows that frequent load changes could cause a considerable effect on the rock mass and constituent joint system. A delayed response of the pressure in boreholes in the rock mass compared with inside the tunnel is seen in all start and stop sequences and is considered to be the main reason for instability caused by transients. The response of pore pressure in boreholes is greatly influenced by the characteristics of joints. The results show that the start sequence and shorter shutdown duration exert a greater impact on rock mass as compared to the stop sequence and longer shutdown duration. Therefore, it is recommended to increase the shutdown duration so that the impact can be minimized to increase the tunnel lifetime. This study recommends implementing a more conservative design approach in tunnels with weak rock masses in projects that involve frequent load changes.
Open AccessHydraulic Transient Impact on Surrounding Rock Mass of Unlined Pressure Tunnels
The frequent pressure pulsations due to hydraulic transients in hydropower plants induce cyclic loading on the rock mass that may contribute to increased instances of block falls and increased risk of tunnel collapse over the power plant lifetime. This study focuses on understanding the effect of frequent start and stop sequences of hydropower in unlined pressure tunnels. For this purpose, data from a pore water pressure monitoring system is utilized, which was installed at the downstream end of the headrace tunnel at the 50 MW Roskrepp hydropower plant in southern Norway. The objective of this study is to analyze the recorded data and quantify the impact of the hydraulic transient on the surrounding rock mass in the unlined pressure tunnel. The monitoring of pressure data over several years clearly shows that frequent load changes could cause a considerable effect on the rock mass and constituent joint system. A delayed response of the pressure in boreholes in the rock mass compared with inside the tunnel is seen in all start and stop sequences and is considered to be the main reason for instability caused by transients. The response of pore pressure in boreholes is greatly influenced by the characteristics of joints. The results show that the start sequence and shorter shutdown duration exert a greater impact on rock mass as compared to the stop sequence and longer shutdown duration. Therefore, it is recommended to increase the shutdown duration so that the impact can be minimized to increase the tunnel lifetime. This study recommends implementing a more conservative design approach in tunnels with weak rock masses in projects that involve frequent load changes.
- Open Access
- 1 September 2022
- Published by American Society of Civil Engineers (ASCE) in Journal of Hydraulic Engineering
- Vol. 148 (9) , 05022002
Hydraulic Scale Modeling of Mass Oscillations in a Pumped Storage Plant with Multiple Surge Tanks
As power systems include more intermittent renewable energy sources, energy storage solutions are needed to support them. Pumped hydro is a reliable alternative for long-term energy storage. A solution for bringing more pumped hydro into the power system is to upgrade existing hydropower plants into pumped hydro. To investigate this possibility, a case study with a complex tunnel system and multiple surge tanks along both the headrace and the tailrace tunnels is selected. A hydraulic scale model and validation methods were developed. The challenges in developing and validating complex models involving multiple surge tanks, throttles, head loss, and limited prototype information are detailed.
- 1 September 2022
- Published by American Society of Civil Engineers (ASCE) in Journal of Hydraulic Engineering
- Vol. 148 (9) , 05022002
Open AccessHydraulic Scale Modeling of Mass Oscillations in a Pumped Storage Plant with Multiple Surge Tanks
As power systems include more intermittent renewable energy sources, energy storage solutions are needed to support them. Pumped hydro is a reliable alternative for long-term energy storage. A solution for bringing more pumped hydro into the power system is to upgrade existing hydropower plants into pumped hydro. To investigate this possibility, a case study with a complex tunnel system and multiple surge tanks along both the headrace and the tailrace tunnels is selected. A hydraulic scale model and validation methods were developed. The challenges in developing and validating complex models involving multiple surge tanks, throttles, head loss, and limited prototype information are detailed.
- Open Access
Mechanistic Model of an Air Cushion Surge Tank for Hydro Power Plants
Due to the increasing use of renewable energy sources, and to counter the effects of fossil fuels, renewable dispatchable hydro power can be used for balancing load and generation from intermittent sources (solar and wind). During higher percentage change in load acceptance or rejection in the intermittent grid, the operations of surge tanks are crucial in terms of water mass oscillation and water hammer pressure, and to avoid wear and tear in actuators and other equipment, such as hydro turbines. Surge tanks are broadly classified as open types, with access to open air, and closed types, with a closed volume of pressurized air. Closed surge tanks are considered to have a more flexible operation in terms of suppressing water mass oscillation and water hammer pressure. In this paper, a mechanistic model of an air cushion surge tank (ACST) for hydro power plants is developed based on the ordinary differential equations (ODEs) for mass and momentum balances. The developed mechanistic model of the ACST is a feature extension to an existing open-source hydro power library—OpenHPL. The developed model is validated with experimental data from the Torpa hydro power plant (HPP) in Norway. Results show that the air friction inside the ACST is negligible as compared to the water friction. The results also indicate that a hydro power plant with an ACST is a potential candidate as a flexible hydro power in an interconnected power system grid supplied with intermittent energy sources. Conclusions are drawn based on the simulation results from hydraulic performance of the ACST.
Open AccessMechanistic Model of an Air Cushion Surge Tank for Hydro Power Plants
Due to the increasing use of renewable energy sources, and to counter the effects of fossil fuels, renewable dispatchable hydro power can be used for balancing load and generation from intermittent sources (solar and wind). During higher percentage change in load acceptance or rejection in the intermittent grid, the operations of surge tanks are crucial in terms of water mass oscillation and water hammer pressure, and to avoid wear and tear in actuators and other equipment, such as hydro turbines. Surge tanks are broadly classified as open types, with access to open air, and closed types, with a closed volume of pressurized air. Closed surge tanks are considered to have a more flexible operation in terms of suppressing water mass oscillation and water hammer pressure. In this paper, a mechanistic model of an air cushion surge tank (ACST) for hydro power plants is developed based on the ordinary differential equations (ODEs) for mass and momentum balances. The developed mechanistic model of the ACST is a feature extension to an existing open-source hydro power library—OpenHPL. The developed model is validated with experimental data from the Torpa hydro power plant (HPP) in Norway. Results show that the air friction inside the ACST is negligible as compared to the water friction. The results also indicate that a hydro power plant with an ACST is a potential candidate as a flexible hydro power in an interconnected power system grid supplied with intermittent energy sources. Conclusions are drawn based on the simulation results from hydraulic performance of the ACST.
- Open Access
Retrofitting of Pressurized Sand Traps in Hydropower Plants
Unlined pressure tunnels in sound rock, combined with pressurized sand traps at the downstream end, allow for low-cost construction of hydropower tunnel systems. This design concept is utilized in hydropower plants across the world. Currently, many such power plants are being upgraded with higher installed capacity, which may result in challenges with the sand trap efficiency. A physical scale model test, accompanied by 3D CFD simulations of a case study pressurized sand trap, has been studied for economic retrofitting. The geometric model scale is 1:36.67 while the velocity scale and sediment scale are 1:1 (same average flow velocity and sediment size in model and prototype). This is currently an uncommon scaling approach but with several advantages, as presented in this paper. Various options for retrofitting were investigated. A combined structure of ramp and ribs was found to significantly improve the sediment trap efficiency. The main novelties from this work are the proposed design of the combined ramp and rib structure. Secondary results include an efficient setup for physical scale models of pressurized sand traps and a methodology that combines the benefits of 3D CFD simulations with physical scale models testing for sand trap engineering and design.
Open AccessRetrofitting of Pressurized Sand Traps in Hydropower Plants
Unlined pressure tunnels in sound rock, combined with pressurized sand traps at the downstream end, allow for low-cost construction of hydropower tunnel systems. This design concept is utilized in hydropower plants across the world. Currently, many such power plants are being upgraded with higher installed capacity, which may result in challenges with the sand trap efficiency. A physical scale model test, accompanied by 3D CFD simulations of a case study pressurized sand trap, has been studied for economic retrofitting. The geometric model scale is 1:36.67 while the velocity scale and sediment scale are 1:1 (same average flow velocity and sediment size in model and prototype). This is currently an uncommon scaling approach but with several advantages, as presented in this paper. Various options for retrofitting were investigated. A combined structure of ramp and ribs was found to significantly improve the sediment trap efficiency. The main novelties from this work are the proposed design of the combined ramp and rib structure. Secondary results include an efficient setup for physical scale models of pressurized sand traps and a methodology that combines the benefits of 3D CFD simulations with physical scale models testing for sand trap engineering and design.
- Open Access
Efficiency of Pressurized Rock Traps for Unlined Hydropower Tunnels
Pressurized rock traps are constructed in many hydropower plants to stop sand and gravel from being transported through the turbines. Pressurized rock traps are typically located in the downstream end of unlined headrace tunnels, where the tunnel itself may be one of the sediment sources. This state-of-the-art review presents an overview of research on pressurized rock traps from both publicly available sources and unpublished sources. Limited scientific literature exists on rock traps, and most of the existing literature has previously been unavailable for an international audience. Based on this review, it is concluded that pressurized rock traps should be built with the flow area and sediment deposition volume separated by plates or ribs. Without any separation measures, the sediments risk being re-entrained due to turbulence. This review is separated into three sections: (1) sediment problems and sources of sediments, (2) theory for pressurized rock traps, and (3) design of pressurized rock traps. The recommended design for new pressurized rock traps, including a design flow chart, is provided. Finally, a recommended solution for rebuilding existing pressurized rock traps with an open design into a closed design is also presented.
Open AccessEfficiency of Pressurized Rock Traps for Unlined Hydropower Tunnels
Pressurized rock traps are constructed in many hydropower plants to stop sand and gravel from being transported through the turbines. Pressurized rock traps are typically located in the downstream end of unlined headrace tunnels, where the tunnel itself may be one of the sediment sources. This state-of-the-art review presents an overview of research on pressurized rock traps from both publicly available sources and unpublished sources. Limited scientific literature exists on rock traps, and most of the existing literature has previously been unavailable for an international audience. Based on this review, it is concluded that pressurized rock traps should be built with the flow area and sediment deposition volume separated by plates or ribs. Without any separation measures, the sediments risk being re-entrained due to turbulence. This review is separated into three sections: (1) sediment problems and sources of sediments, (2) theory for pressurized rock traps, and (3) design of pressurized rock traps. The recommended design for new pressurized rock traps, including a design flow chart, is provided. Finally, a recommended solution for rebuilding existing pressurized rock traps with an open design into a closed design is also presented.
- Open Access
Investigations of Rake and Rib Structures in Sand Traps to Prevent Sediment Transport in Hydropower Plants
In order to increase the lifespan of hydraulic turbines in hydropower plants, it is necessary to minimize damages caused by sediment erosion. One solution is to reduce the amount of sediments by improving the design of sand trap. In the present work, the effects on sand trap efficiency by installing v-shaped rake structures for flow distribution and rib structures for sediment trapping is investigated numerically using the SAS–SST turbulence model. The v-shaped rake structures are located in the diffuser near the inlet of the sand trap, while the ribs cover a section of the bed in the downstream end. Three-dimensional models of the sand trap in Tonstad hydropower plant are created. The present study showed that integrating rib type structure can reduce the total weight of sediments escaping the sand trap by 24.5%, which leads to an improved sand trap efficiency. Consequently, the head loss in the sand trap is increased by 1.8%. By additionally including the v-shaped rakes, the total weight of sediments escaping the sand trap is instead increased by 48.5%, thus worsening the sand trap efficiency. This increases head loss by 12.7%. The results also show that turbulent flow commencing at the sand trap diffuser prevents the downstream settling of sediments with a diameter of less than one millimeter. The hydraulic representation of the numerical model is validated by comparison with particle image velocimetry measurements of the flow field from scale experiments and ADCP measurements from the prototype. The tested rib design has not previously been installed in a hydropower plant, and can be recommended. The tested v-shaped rakes have been installed in existing hydropower plants, but this practice should be reconsidered.
Open AccessInvestigations of Rake and Rib Structures in Sand Traps to Prevent Sediment Transport in Hydropower Plants
In order to increase the lifespan of hydraulic turbines in hydropower plants, it is necessary to minimize damages caused by sediment erosion. One solution is to reduce the amount of sediments by improving the design of sand trap. In the present work, the effects on sand trap efficiency by installing v-shaped rake structures for flow distribution and rib structures for sediment trapping is investigated numerically using the SAS–SST turbulence model. The v-shaped rake structures are located in the diffuser near the inlet of the sand trap, while the ribs cover a section of the bed in the downstream end. Three-dimensional models of the sand trap in Tonstad hydropower plant are created. The present study showed that integrating rib type structure can reduce the total weight of sediments escaping the sand trap by 24.5%, which leads to an improved sand trap efficiency. Consequently, the head loss in the sand trap is increased by 1.8%. By additionally including the v-shaped rakes, the total weight of sediments escaping the sand trap is instead increased by 48.5%, thus worsening the sand trap efficiency. This increases head loss by 12.7%. The results also show that turbulent flow commencing at the sand trap diffuser prevents the downstream settling of sediments with a diameter of less than one millimeter. The hydraulic representation of the numerical model is validated by comparison with particle image velocimetry measurements of the flow field from scale experiments and ADCP measurements from the prototype. The tested rib design has not previously been installed in a hydropower plant, and can be recommended. The tested v-shaped rakes have been installed in existing hydropower plants, but this practice should be reconsidered.
- Open Access
Operation of Norwegian Hydropower Plants and Its Effect on Block Fall Events in Unlined Pressure Tunnels and Shafts
The main objective of this study is to investigate the effect of hydropower plant operation on the long-term stability of unlined pressure tunnels of hydropower plants in Norway. The authors analyzed the past production data of some hydropower plants to find out the number of starts/stops and the frequency and magnitude of load changes. The study demonstrates that an average of 200–400 start/stop events are occurring per turbine per year for the analyzed period, with an increasing trend. Currently, 150–200 large load changes per turbine smaller than 50 MW are occurring every year, and this is expected to increase by 30–45% between 2025 and 2040 for one of the studied power plants. Most importantly, the monitored pressure transients and pore pressure response in the rock mass during real-time operation at Roskrepp power plant are presented. A new method is proposed to calculate and quantify the hydraulic impact (HI) of pressure transients on rock joints and the effect of duration of shutdown/opening, which is found to be the most dominant parameter affecting the magnitude. The results show that faster shutdown sequences cause unnecessary stress in rock mass surrounding pressure tunnel. The hydraulic impact (HI) can be more than 10 times higher when the shutdown duration is reduced by 50 percent. The study recommends that duration of normal shutdowns/openings in hydropower plants should be slower so that hydraulic impacts on the rock joints are reduced and cyclic hydraulic fatigue is delayed, prolonging the lifetime of unlined pressure tunnels and shafts.
Open AccessOperation of Norwegian Hydropower Plants and Its Effect on Block Fall Events in Unlined Pressure Tunnels and Shafts
The main objective of this study is to investigate the effect of hydropower plant operation on the long-term stability of unlined pressure tunnels of hydropower plants in Norway. The authors analyzed the past production data of some hydropower plants to find out the number of starts/stops and the frequency and magnitude of load changes. The study demonstrates that an average of 200–400 start/stop events are occurring per turbine per year for the analyzed period, with an increasing trend. Currently, 150–200 large load changes per turbine smaller than 50 MW are occurring every year, and this is expected to increase by 30–45% between 2025 and 2040 for one of the studied power plants. Most importantly, the monitored pressure transients and pore pressure response in the rock mass during real-time operation at Roskrepp power plant are presented. A new method is proposed to calculate and quantify the hydraulic impact (HI) of pressure transients on rock joints and the effect of duration of shutdown/opening, which is found to be the most dominant parameter affecting the magnitude. The results show that faster shutdown sequences cause unnecessary stress in rock mass surrounding pressure tunnel. The hydraulic impact (HI) can be more than 10 times higher when the shutdown duration is reduced by 50 percent. The study recommends that duration of normal shutdowns/openings in hydropower plants should be slower so that hydraulic impacts on the rock joints are reduced and cyclic hydraulic fatigue is delayed, prolonging the lifetime of unlined pressure tunnels and shafts.