Maria Teresa Vespucci
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Maria Teresa Vespucci has a total of 50 co-authors. Here are the top co-authors by number of shared publications:
- Marida Bertocchi
University of Bergamo
6 shared publications - Elisabetta Allevi
Department of Economics and Management, University of Brescia, Brescia, Italy
5 shared publications Marida Bertocchi
Department of Management, Economics and Quantitative Methods, Bergamo University, Bergamo, Italy
5 shared publicationsStefano Zigrino
Department of Management, Economics and Quantitative Methods, Bergamo University, Bergamo, Italy
5 shared publicationsAlberto Gelmini
3 shared publications- Cinzia Puglisi
CESI, Milan, Italy
3 shared publications
Latest Publications
- Open Access
- 27 July 2026
- Published by Springer Nature in Energy Systems
- p. 1-56
A stochastic programming model for anticipative planning of integrated electricity and gas systems with bidirectional energy flows under fuel and CO$_{2}$ price uncertaintyA two-stage multi-period mixed-integer linear stochastic programming model is proposed to assist qualified operators in long-term generation and transmission expansion planning of electricity and gas systems to meet policy objectives. The first-stage decisions concern investments in new plants, new connections in the electricity and gas sectors, and the decommissioning of existing thermal power plants; the second-stage variables represent operational decisions, with uncertainty about future fuel and CO $$_2$$ prices represented by scenarios. The main features of the model are: (i) the bidirectional conversion between electricity and gas enabled by Power-to-Gas and thermal power plants, (ii) a detailed representation of short-term operation, crucial for addressing challenges associated with integrating large shares of renewables in the energy mix, and (iii) an integrated planning framework to evaluate the operation of flexibility resources, their ability to manage non-programmable generation, and their economic viability. A case study on the decarbonisation of the Italian integrated energy system demonstrates the effectiveness of the model. The numerical results show: (i) the importance of including a detailed system representation for obtaining reliable results, and (ii) the need to consider price uncertainty to design adequate systems and reduce overall costs.- 27 July 2026
- Published by Springer Nature in Energy Systems
- p. 1-56
Open AccessA stochastic programming model for anticipative planning of integrated electricity and gas systems with bidirectional energy flows under fuel and CO$_{2}$ price uncertaintyA two-stage multi-period mixed-integer linear stochastic programming model is proposed to assist qualified operators in long-term generation and transmission expansion planning of electricity and gas systems to meet policy objectives. The first-stage decisions concern investments in new plants, new connections in the electricity and gas sectors, and the decommissioning of existing thermal power plants; the second-stage variables represent operational decisions, with uncertainty about future fuel and CO $$_2$$ prices represented by scenarios. The main features of the model are: (i) the bidirectional conversion between electricity and gas enabled by Power-to-Gas and thermal power plants, (ii) a detailed representation of short-term operation, crucial for addressing challenges associated with integrating large shares of renewables in the energy mix, and (iii) an integrated planning framework to evaluate the operation of flexibility resources, their ability to manage non-programmable generation, and their economic viability. A case study on the decarbonisation of the Italian integrated energy system demonstrates the effectiveness of the model. The numerical results show: (i) the importance of including a detailed system representation for obtaining reliable results, and (ii) the need to consider price uncertainty to design adequate systems and reduce overall costs. - Open Access
- 27 March 2026
- Published by Elsevier in European Journal of Operational Research
A Primal-Dual Interior-Point algorithm for nonlinear ACOPF with adaptively reformulated Volt-Var constraints
- 27 March 2026
- Published by Elsevier in European Journal of Operational Research
Open AccessA Primal-Dual Interior-Point algorithm for nonlinear ACOPF with adaptively reformulated Volt-Var constraints
- Open Access
A Stochastic Programming Model for Anticipative Planning of Integrated Electricity and Gas Systems with Bidirectional Energy Flows under Fuel and CO2 Price Uncertainty
A two-stage multi-period mixed-integer linear stochastic programming model is proposed to assist qualified operators in long-term generation and transmission expansion planning of electricity and gas systems to meet policy objectives. The first-stage decisions concern investments in new plants, new connections in the electricity and gas sectors, and the decommissioning of existing thermal power plants; the second-stage variables represent operational decisions, with uncertainty about future fuel and CO2 prices represented by scenarios. The main features of the model are: (i) the bidirectional conversion between electricity and gas enabled by Power-to-Gas and thermal power plants, (ii) a detailed representation of short-term operation, crucial for addressing challenges associated with integrating large shares of renewables in the energy mix, and (iii) an integrated planning framework to evaluate the operation of flexibility resources, their ability to manage non-programmable generation, and their economic viability. Given the computational complexity of the proposed model, in this paper we also implement a solution algorithm based on Benders decomposition to compute near-optimal solutions. A case study on the decarbonisation of the Italian integrated energy system demonstrates the effectiveness of the model. The numerical results show: (i) the importance of including a detailed system representation for obtaining reliable results, and (ii) the need to consider price uncertainty to design adequate systems and reduce overall costs.
Open AccessA Stochastic Programming Model for Anticipative Planning of Integrated Electricity and Gas Systems with Bidirectional Energy Flows under Fuel and CO2 Price Uncertainty
A two-stage multi-period mixed-integer linear stochastic programming model is proposed to assist qualified operators in long-term generation and transmission expansion planning of electricity and gas systems to meet policy objectives. The first-stage decisions concern investments in new plants, new connections in the electricity and gas sectors, and the decommissioning of existing thermal power plants; the second-stage variables represent operational decisions, with uncertainty about future fuel and CO2 prices represented by scenarios. The main features of the model are: (i) the bidirectional conversion between electricity and gas enabled by Power-to-Gas and thermal power plants, (ii) a detailed representation of short-term operation, crucial for addressing challenges associated with integrating large shares of renewables in the energy mix, and (iii) an integrated planning framework to evaluate the operation of flexibility resources, their ability to manage non-programmable generation, and their economic viability. Given the computational complexity of the proposed model, in this paper we also implement a solution algorithm based on Benders decomposition to compute near-optimal solutions. A case study on the decarbonisation of the Italian integrated energy system demonstrates the effectiveness of the model. The numerical results show: (i) the importance of including a detailed system representation for obtaining reliable results, and (ii) the need to consider price uncertainty to design adequate systems and reduce overall costs.
- 1 January 2021
- Published by Springer Nature
- p. 183-207
A Survey on Modeling Approaches for Generation and Transmission Expansion Planning Analysis
- 1 January 2021
- Published by Springer Nature
- p. 183-207
A Survey on Modeling Approaches for Generation and Transmission Expansion Planning Analysis
- Open Access
- 21 October 2020
- Published by Springer Nature in Energy Systems
- Vol. 14 (3) , 663-705
A two-stage stochastic MILP model for generation and transmission expansion planning with high shares of renewables
This paper is concerned with the generation and transmission expansion planning of large-scale energy systems with high penetration of renewable energy sources. Since expansion plans are usually provided for a long-term planning horizon, the system conditions are generally uncertain at the time the expansion plans are decided. In this work, we focus on the uncertainty of thermal power plants production costs, because of the important role they play in the generation and transmission expansion planning by affecting the merit order of thermal plants and the economic viability of renewable generation. To deal with this long-term uncertainty, we consider different scenarios and we define capacity expansion decisions using a two-stage stochastic programming model that aims at minimizing the sum of investment, decommissioning and fixed costs and the expected value of operational costs. To be computationally tractable most of the existing expansion planning models employ a low level of temporal and technical detail. However, this approach is no more an appropriate approximation for power systems analysis, since it does not allow to accurately study all the challenges related to integrating high shares of intermittent energy sources, underestimating the need for flexible resources and the expected costs. To provide more accurate expansion plans for power systems with large penetration of renewables, in our analysis, we consider a high level of temporal detail and we include unit commitment constraints on a plant-by-plant level into the expansion planning framework. To maintain the problem computationally tractable, we use representative days and we implement a multi-cut Benders decomposition algorithm, decomposing the original problem both by year and by scenario. Results obtained with our methodology in the Italian energy system under a 21-year planning horizon show how the proposed model can offer professional guidance and support in strategic decisions to the different actors involved in electricity transmission and generation.
- 21 October 2020
- Published by Springer Nature in Energy Systems
- Vol. 14 (3) , 663-705
Open AccessA two-stage stochastic MILP model for generation and transmission expansion planning with high shares of renewables
This paper is concerned with the generation and transmission expansion planning of large-scale energy systems with high penetration of renewable energy sources. Since expansion plans are usually provided for a long-term planning horizon, the system conditions are generally uncertain at the time the expansion plans are decided. In this work, we focus on the uncertainty of thermal power plants production costs, because of the important role they play in the generation and transmission expansion planning by affecting the merit order of thermal plants and the economic viability of renewable generation. To deal with this long-term uncertainty, we consider different scenarios and we define capacity expansion decisions using a two-stage stochastic programming model that aims at minimizing the sum of investment, decommissioning and fixed costs and the expected value of operational costs. To be computationally tractable most of the existing expansion planning models employ a low level of temporal and technical detail. However, this approach is no more an appropriate approximation for power systems analysis, since it does not allow to accurately study all the challenges related to integrating high shares of intermittent energy sources, underestimating the need for flexible resources and the expected costs. To provide more accurate expansion plans for power systems with large penetration of renewables, in our analysis, we consider a high level of temporal detail and we include unit commitment constraints on a plant-by-plant level into the expansion planning framework. To maintain the problem computationally tractable, we use representative days and we implement a multi-cut Benders decomposition algorithm, decomposing the original problem both by year and by scenario. Results obtained with our methodology in the Italian energy system under a 21-year planning horizon show how the proposed model can offer professional guidance and support in strategic decisions to the different actors involved in electricity transmission and generation.
- 1 September 2016
- Published by Elsevier in Solar Energy
- Vol. 134, 327-338
Post-processing techniques and principal component analysis for regional wind power and solar irradiance forecasting
- 1 September 2016
- Published by Elsevier in Solar Energy
- Vol. 134, 327-338
Post-processing techniques and principal component analysis for regional wind power and solar irradiance forecasting
- 1 January 2016
- Published by Elsevier in Energy Economics
- Vol. 53, 203-211
A time consistent risk averse three-stage stochastic mixed integer optimization model for power generation capacity expansion
- 1 January 2016
- Published by Elsevier in Energy Economics
- Vol. 53, 203-211
A time consistent risk averse three-stage stochastic mixed integer optimization model for power generation capacity expansion
- 13 November 2015
- Published by Taylor & Francis in Optimization Methods and Software
- Vol. 31 (2) , 305-327
Two-stage stochastic mixed integer optimization models for power generation capacity expansion with risk measures
We present two-stage stochastic risk averse optimization models for the power generation mix capacity expansion planning in the long run under uncertainty. Uncertainty is described by a set of possible scenarios in the second stage and uncertain parameters are the unit production costs of the existing power plants as well as those of the candidate plants of new technologies among which to choose, the market electricity price, the price of green certificates and the emission permits and the potential market share of the producer. The problem is expressed as a two-stage stochastic integer optimization model subject to technical constraints, market opportunities and budget constraints. First stage variables represent the number of new power plants for each candidate technology to be added to the existing generation mix every year of the planning horizon. Second stage variables are the continuous operation variables of all power plants in the generation mix along the time horizon. We solve the problem of the maximization of the net present value of the expected profits along the time horizon using both a risk neutral approach and different risk averse strategies (conditional value at risk, shortfall probability, expected shortage and first- and second-order stochastic dominance), under different hypotheses of the available budget, analysing the impact of each risk averse strategy on the expected profit. Results show that risk control strongly reduces the possibility of reaching unwanted scenarios as well as providing consistent solutions under different strategies.
- 13 November 2015
- Published by Taylor & Francis in Optimization Methods and Software
- Vol. 31 (2) , 305-327
Two-stage stochastic mixed integer optimization models for power generation capacity expansion with risk measures
We present two-stage stochastic risk averse optimization models for the power generation mix capacity expansion planning in the long run under uncertainty. Uncertainty is described by a set of possible scenarios in the second stage and uncertain parameters are the unit production costs of the existing power plants as well as those of the candidate plants of new technologies among which to choose, the market electricity price, the price of green certificates and the emission permits and the potential market share of the producer. The problem is expressed as a two-stage stochastic integer optimization model subject to technical constraints, market opportunities and budget constraints. First stage variables represent the number of new power plants for each candidate technology to be added to the existing generation mix every year of the planning horizon. Second stage variables are the continuous operation variables of all power plants in the generation mix along the time horizon. We solve the problem of the maximization of the net present value of the expected profits along the time horizon using both a risk neutral approach and different risk averse strategies (conditional value at risk, shortfall probability, expected shortage and first- and second-order stochastic dominance), under different hypotheses of the available budget, analysing the impact of each risk averse strategy on the expected profit. Results show that risk control strongly reduces the possibility of reaching unwanted scenarios as well as providing consistent solutions under different strategies.