Charles John MacRobert
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Charles John MacRobert has a total of 30 co-authors. Here are the top co-authors by number of shared publications:
A. Coetzee
Impala Platinum Holdings Ltd, South Africa
1 shared publicationAlebakwe Moganetsi
Debswana Botswana
1 shared publicationAlessia Cuccurullo
1 shared publication- Ana Heitor
University of Leeds
1 shared publication Andrew Copeland
1 shared publicationBoitumelo Bohule
Debswana Botswana
1 shared publication
Latest Publications
- 4 July 2026
- Published by ABMS - Brazilian Association for Soil Mechanics and Geotechnical Engineering in Soils and Rocks
- Vol. 49 (4)
Influence of stratigraphic variability on 2D and 3D factors of safety: a numerical investigation of tailings dam embankments
Past research has focused on spatial variability or the influence of randomly distributed strength on slope stability. This research explores stratigraphic variability, specifically the influence of positional changes in the boundary between two materials of very different strengths on stability. Specifically, the boundary between drained and undrained material commonly present in upstream tailings dams. Two-dimensional (2D) and three-dimensional (3D) slope stability analyses are compared. The study showed that when a single random 2D cross-section was selected, this had an 11% probability of being unsafe (i.e., the resulting 2D factor of safety was higher than the 3D factor of safety calculated considering stratigraphic variability), while extrapolating a randomly selected 2D section to represent the entire 3D slope (i.e., ignoring stratigraphic variability) increased this risk to 46%. The reason why an extrapolated 3D slope stability analysis was unconservative is that, in many instances it failed to account for weak sides, toe, and back scarp conditions that existed when stratigraphic variability along the length of the slope was taken into consideration. These features can be overlooked when an analysis assumes homogeneity and highlights the importance of investigating conditions along the length of a slope particularly if a 3D analysis is to be performed.
- 4 July 2026
- Published by ABMS - Brazilian Association for Soil Mechanics and Geotechnical Engineering in Soils and Rocks
- Vol. 49 (4)
Influence of stratigraphic variability on 2D and 3D factors of safety: a numerical investigation of tailings dam embankments
Past research has focused on spatial variability or the influence of randomly distributed strength on slope stability. This research explores stratigraphic variability, specifically the influence of positional changes in the boundary between two materials of very different strengths on stability. Specifically, the boundary between drained and undrained material commonly present in upstream tailings dams. Two-dimensional (2D) and three-dimensional (3D) slope stability analyses are compared. The study showed that when a single random 2D cross-section was selected, this had an 11% probability of being unsafe (i.e., the resulting 2D factor of safety was higher than the 3D factor of safety calculated considering stratigraphic variability), while extrapolating a randomly selected 2D section to represent the entire 3D slope (i.e., ignoring stratigraphic variability) increased this risk to 46%. The reason why an extrapolated 3D slope stability analysis was unconservative is that, in many instances it failed to account for weak sides, toe, and back scarp conditions that existed when stratigraphic variability along the length of the slope was taken into consideration. These features can be overlooked when an analysis assumes homogeneity and highlights the importance of investigating conditions along the length of a slope particularly if a 3D analysis is to be performed.
- 24 September 2025
- Published by Emerald Publishing in Proceedings of the Institution of Civil Engineers - Forensic Engineering
Heuristics, biases, and expertise in identifying critical slip surfaces
While various algorithms are available to identify critical slip surfaces in soil slopes, practitioners often need to seed the surface search and validate identified surfaces. Identifying critical slip surfaces requires assessing competing cues related to driving and resisting moments, using heuristic reasoning and intuition. This study received 181 responses to a task asking participants to identify the most and least critical slip surfaces in three different slope stability scenarios. Most participants correctly identified one or two of the highest (mean = 1.6), and, on average, they identified one of the lowest factors of safety (mean = 1.0). Expertise measures only correlated with performance in the scenario with the highest factor of safety across the three scenarios and not the other scenarios. While this may suggest limited conceptual understanding, analysis of reasons provided by participants suggested that errors often stemmed from misapplied heuristics. For example, cohesion was sometimes overlooked, leading to incorrect identification of the lowest factor of safety; larger failing masses were sometimes incorrectly associated with lower safety in frictional materials; and masses were sometimes incorrectly assumed as driving moments rather than resisting moments when considering the point of rotation. Addressing these misconceptions could significantly enhance practitioner performance.
- 24 September 2025
- Published by Emerald Publishing in Proceedings of the Institution of Civil Engineers - Forensic Engineering
Heuristics, biases, and expertise in identifying critical slip surfaces
While various algorithms are available to identify critical slip surfaces in soil slopes, practitioners often need to seed the surface search and validate identified surfaces. Identifying critical slip surfaces requires assessing competing cues related to driving and resisting moments, using heuristic reasoning and intuition. This study received 181 responses to a task asking participants to identify the most and least critical slip surfaces in three different slope stability scenarios. Most participants correctly identified one or two of the highest (mean = 1.6), and, on average, they identified one of the lowest factors of safety (mean = 1.0). Expertise measures only correlated with performance in the scenario with the highest factor of safety across the three scenarios and not the other scenarios. While this may suggest limited conceptual understanding, analysis of reasons provided by participants suggested that errors often stemmed from misapplied heuristics. For example, cohesion was sometimes overlooked, leading to incorrect identification of the lowest factor of safety; larger failing masses were sometimes incorrectly associated with lower safety in frictional materials; and masses were sometimes incorrectly assumed as driving moments rather than resisting moments when considering the point of rotation. Addressing these misconceptions could significantly enhance practitioner performance.
- Open Access
- 3 January 2025
- Published by ABMS - Brazilian Association for Soil Mechanics and Geotechnical Engineering in Soils and Rocks
- Vol. 48 (1)
Discussion of "Forks in the road: decisions that have shaped and will shape the teaching and practice of geotechnical engineering"
- 3 January 2025
- Published by ABMS - Brazilian Association for Soil Mechanics and Geotechnical Engineering in Soils and Rocks
- Vol. 48 (1)
Open AccessDiscussion of "Forks in the road: decisions that have shaped and will shape the teaching and practice of geotechnical engineering"
- Open Access
- 1 January 2025
- Published by Australian Centre for Geomechanics
- p. 65-74
Stacking angles for dewatered coarse diamond residues
Diamond processing results in three residue streams, commonly termed fine residue (clay–silt sized), grits (silt–sand sized) and tails (sand–gravel sized). Dewatering of the tails is typically done using screens and metallurgical moisture contents of 5–11% can often be achieved. Grits are often dewatered using dewatering screens and metallurgical moisture contents of between 17–25% can be achieved. These dewatered streams can therefore be disposed of using dry material handling techniques (e.g. conveyors, trucks and dozers). Fullscale dewatering of fines is yet to be demonstrated and disposal to tailings dams by either conventional slurry, thickened tailings or paste is common. A key design decision, particularly if co-disposal of tails and grits is under consideration, is the short-term (months) stacking angle and how this may change in the long term (years). A benchmarking exercise of several operations was undertaken to understand stacking angles. This found that grits content (which controls metallurgical moisture content), mineralogy and process water salinity were major determinants of behaviour. High smectite ores processed with low-salinity waters tended to produce flat stacking angles (≈ 8°), whereas all ores, regardless of smectite content but processed with highly saline waters, tended to produce steeper stacking angles (≈ 18 to 34°). Low-saline waters cause the smectites to swell and disperse, resulting in a mass that has a greater propensity for lava-like flow as water is held by the solids on disposal. In contrast, the highly saline waters inhibit this swelling (if smectite is present), resulting in a free-draining material which stacks steeply on disposal. However, over the long term, smectites can still swell in the presence of water, causing weathering. If sufficient free water (e.g. through codisposal) is available, moisture can accumulate and create weak layers within the deposit, altering the stacking angle.
- 1 January 2025
- Published by Australian Centre for Geomechanics
- p. 65-74
Open AccessStacking angles for dewatered coarse diamond residues
Diamond processing results in three residue streams, commonly termed fine residue (clay–silt sized), grits (silt–sand sized) and tails (sand–gravel sized). Dewatering of the tails is typically done using screens and metallurgical moisture contents of 5–11% can often be achieved. Grits are often dewatered using dewatering screens and metallurgical moisture contents of between 17–25% can be achieved. These dewatered streams can therefore be disposed of using dry material handling techniques (e.g. conveyors, trucks and dozers). Fullscale dewatering of fines is yet to be demonstrated and disposal to tailings dams by either conventional slurry, thickened tailings or paste is common. A key design decision, particularly if co-disposal of tails and grits is under consideration, is the short-term (months) stacking angle and how this may change in the long term (years). A benchmarking exercise of several operations was undertaken to understand stacking angles. This found that grits content (which controls metallurgical moisture content), mineralogy and process water salinity were major determinants of behaviour. High smectite ores processed with low-salinity waters tended to produce flat stacking angles (≈ 8°), whereas all ores, regardless of smectite content but processed with highly saline waters, tended to produce steeper stacking angles (≈ 18 to 34°). Low-saline waters cause the smectites to swell and disperse, resulting in a mass that has a greater propensity for lava-like flow as water is held by the solids on disposal. In contrast, the highly saline waters inhibit this swelling (if smectite is present), resulting in a free-draining material which stacks steeply on disposal. However, over the long term, smectites can still swell in the presence of water, causing weathering. If sufficient free water (e.g. through codisposal) is available, moisture can accumulate and create weak layers within the deposit, altering the stacking angle.
- 1 October 2024
- Published by American Society of Civil Engineers (ASCE) in Journal of Civil Engineering Education
- Vol. 150 (4)
Creative Oedometer Practical for Undergraduate Geotechnical Engineering Education
- 1 October 2024
- Published by American Society of Civil Engineers (ASCE) in Journal of Civil Engineering Education
- Vol. 150 (4)
Creative Oedometer Practical for Undergraduate Geotechnical Engineering Education
- Open Access
- 29 January 2024
- Published by ABMS - Brazilian Association for Soil Mechanics and Geotechnical Engineering in Soils and Rocks
- Vol. 47 (2)
Helping students classify and frame capstone geotechnical design courses
- 29 January 2024
- Published by ABMS - Brazilian Association for Soil Mechanics and Geotechnical Engineering in Soils and Rocks
- Vol. 47 (2)
Open AccessHelping students classify and frame capstone geotechnical design courses
- 1 October 2023
- Published by Emerald Publishing in Proceedings of the Institution of Civil Engineers - Forensic Engineering
- Vol. 176 (4) , 134-141
Confidence and performance in different engineering tasks
To explore how different tasks inform decisions, geotechnicians were invited to predict the stability of a failed tailings dam. Participants included students, contractors and experienced consultants. The first task involved noting down stability concerns and making a stability prediction. Participants then prepared sketches, suggested material parameters and updated their predictions. The third task involved suggesting strength parameters for a limit equilibrium model, critiquing the model and making a final stability prediction. A 30 min time limit increased the chance of human error. Accurately assessing the failure mode at the note and sketch sections did not translate into correct predictions, despite high confidence in these tasks, particularly from experienced participants. The majority (80%) of final stability predictions were highly correlated with the analytical computer model, despite low confidence in this model, particularly from experienced participants. While this trend in confidence is perhaps expected, most participants, including experienced participants, failed to identify that failure was imminent and were confident in their final predictions. This was largely because many suggested drained strength parameters, rather than undrained strength parameters appropriate for the problem. This highlights the importance of intuitive tasks such as note taking and sketching to understand problems before building analytical models.
- 1 October 2023
- Published by Emerald Publishing in Proceedings of the Institution of Civil Engineers - Forensic Engineering
- Vol. 176 (4) , 134-141
Confidence and performance in different engineering tasks
To explore how different tasks inform decisions, geotechnicians were invited to predict the stability of a failed tailings dam. Participants included students, contractors and experienced consultants. The first task involved noting down stability concerns and making a stability prediction. Participants then prepared sketches, suggested material parameters and updated their predictions. The third task involved suggesting strength parameters for a limit equilibrium model, critiquing the model and making a final stability prediction. A 30 min time limit increased the chance of human error. Accurately assessing the failure mode at the note and sketch sections did not translate into correct predictions, despite high confidence in these tasks, particularly from experienced participants. The majority (80%) of final stability predictions were highly correlated with the analytical computer model, despite low confidence in this model, particularly from experienced participants. While this trend in confidence is perhaps expected, most participants, including experienced participants, failed to identify that failure was imminent and were confident in their final predictions. This was largely because many suggested drained strength parameters, rather than undrained strength parameters appropriate for the problem. This highlights the importance of intuitive tasks such as note taking and sketching to understand problems before building analytical models.
- 1 April 2023
- Published by Emerald Publishing in Proceedings of the Institution of Civil Engineers - Forensic Engineering
- Vol. 176 (2) , 54-61
Design reviewing: are experts better and does slowing down improve performance?
Design reviewing is an important aspect of engineering design. Designs certified by a professional engineer require some form of external check. This external check can range from a quick intuitive assessment of a proposed solution to a reassessment of the problem using alternative methods. This research explored intuitive review assessments for two typical geotechnical designs. The results suggest that those with requisite experience (even seemingly little experience) can make correct assessments even after spending as few as 4 min reviewing a carefully presented solution. Forcing participants to state reasons for a decision (and thereby slowing them down) only served to improve predictions by novices attempting an unfamiliar problem. While such quick intuitive reviews appeared adequate for assessing the problems presented here, some experts still made erroneous decisions even after stating reasons for a decision. Design reviews are an important step in design and should never be taken lightly.
- 1 April 2023
- Published by Emerald Publishing in Proceedings of the Institution of Civil Engineers - Forensic Engineering
- Vol. 176 (2) , 54-61
Design reviewing: are experts better and does slowing down improve performance?
Design reviewing is an important aspect of engineering design. Designs certified by a professional engineer require some form of external check. This external check can range from a quick intuitive assessment of a proposed solution to a reassessment of the problem using alternative methods. This research explored intuitive review assessments for two typical geotechnical designs. The results suggest that those with requisite experience (even seemingly little experience) can make correct assessments even after spending as few as 4 min reviewing a carefully presented solution. Forcing participants to state reasons for a decision (and thereby slowing them down) only served to improve predictions by novices attempting an unfamiliar problem. While such quick intuitive reviews appeared adequate for assessing the problems presented here, some experts still made erroneous decisions even after stating reasons for a decision. Design reviews are an important step in design and should never be taken lightly.
- Open Access
- 23 March 2023
- Published by Academy of Science of South Africa in Journal of the South African Institution of Civil Engineering
- Vol. 65 (1) , 2-6
Establishing competent ground conditions with the DPSH
His research focuses include improving geotechnical design thinking by considering case studies, analysis of failures, and participant observation. He also provides specialised consulting for characterisation and modelling of geomaterials for global stability and seepage assessments. His emphasis on practice enables him to confidently teach the professional art of engineering.
- 23 March 2023
- Published by Academy of Science of South Africa in Journal of the South African Institution of Civil Engineering
- Vol. 65 (1) , 2-6
Open AccessEstablishing competent ground conditions with the DPSH
His research focuses include improving geotechnical design thinking by considering case studies, analysis of failures, and participant observation. He also provides specialised consulting for characterisation and modelling of geomaterials for global stability and seepage assessments. His emphasis on practice enables him to confidently teach the professional art of engineering.