Abbas Mahde Abd
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Abbas Mahde Abd has a total of 23 co-authors. Here are the top co-authors by number of shared publications:
- Amiruddin Ismail
Affiliation Sustainable Urban Transport Research Centre (SUTRA), Department of Civil and Structural Engineering, Faculty of Engineering and Built Environment, Universiti Kebangsaan Malaysia, UKM, Bangi, Selangor, Malaysia
2 shared publications - Alaa S. Khamees
Civil Engineering Department, University of Diyala, Baqubah, Iraq
1 shared publication Alaa Sameer Khamees
MSc Candidate, Department of Civil Engineering,University of Diyala, Baquba, Iraq
1 shared publication- Ali Hussein Hameed
Highway and Airport Engineering Department, College of Engineering, University of Diyala, Baquba 32001, Iraq
1 shared publication Ameer Hilal
1 shared publication- Balqees Mohi Nsaif
Department of Civil Engineering, University of Diyala, Diyala, Iraq
1 shared publication
Latest Publications
- 1 January 2024
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 3203 (1) , 050066
Reduce energy consumption by using different alternatives in Iraqi construction project
The Building Information Modeling (BIM) technology is one of the modern technologies that have become widely used in many aspects of construction building, incl The Building Information Modeling (BIM) technology is one of the modern technologies that have become widely used in many aspects of construction building, incl
- 1 January 2024
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 3203 (1) , 050066
Reduce energy consumption by using different alternatives in Iraqi construction project
The Building Information Modeling (BIM) technology is one of the modern technologies that have become widely used in many aspects of construction building, incl The Building Information Modeling (BIM) technology is one of the modern technologies that have become widely used in many aspects of construction building, incl
- 1 January 2024
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 3203 (1) , 050025
Performance analysis and improvement requirement of infrastructure projects in Diyala governorate region
Infrastructure is an important issue related to human life and development, as it is an essential indicator of the progress of life in countries. It is worth no Infrastructure is an important issue related to human life and development, as it is an essential indicator of the progress of life in countries. It is worth no
- 1 January 2024
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 3203 (1) , 050025
Performance analysis and improvement requirement of infrastructure projects in Diyala governorate region
Infrastructure is an important issue related to human life and development, as it is an essential indicator of the progress of life in countries. It is worth no Infrastructure is an important issue related to human life and development, as it is an essential indicator of the progress of life in countries. It is worth no
- 1 January 2024
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 3203 (1) , 050023
Renovation and management of slum housing and communities: Baqubah city as a case study
One of the biggest challenges facing the Third World today is slum housing. The phenomenon of slum expansion is increasing every day, which leads to a deteriora One of the biggest challenges facing the Third World today is slum housing. The phenomenon of slum expansion is increasing every day, which leads to a deteriora
- 1 January 2024
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 3203 (1) , 050023
Renovation and management of slum housing and communities: Baqubah city as a case study
One of the biggest challenges facing the Third World today is slum housing. The phenomenon of slum expansion is increasing every day, which leads to a deteriora One of the biggest challenges facing the Third World today is slum housing. The phenomenon of slum expansion is increasing every day, which leads to a deteriora
- 23 June 2020
- Published by Springer Nature in Asian Journal of Civil Engineering
- Vol. 21 (7) , 1249-1257
Documentation of construction project using integration of BIM and GIS technique
- 23 June 2020
- Published by Springer Nature in Asian Journal of Civil Engineering
- Vol. 21 (7) , 1249-1257
Documentation of construction project using integration of BIM and GIS technique
- Open Access
- 30 March 2018
- Published by Faculty of Engineering, Chulalongkorn University in Engineering Journal
- Vol. 22 (2) , 59-81
Barriers of Adoption Building Information Modeling (BIM) in Construction Projects of Iraq
- 30 March 2018
- Published by Faculty of Engineering, Chulalongkorn University in Engineering Journal
- Vol. 22 (2) , 59-81
Open AccessBarriers of Adoption Building Information Modeling (BIM) in Construction Projects of Iraq
- Open Access
- 4 January 2018
- Published by Ital Publication in Civil Engineering Journal
- Vol. 3 (12) , 1349-1365
Testing a Measurement Model of BIM Potential Benefits in Iraqi Construction Projects
Building Information Modeling (BIM) is an integrated and comprehensive system for all that related to the construction project, which includes a set of effective policies, procedures, and computer applications that increase the performance of the project during its life cycle. The objective of this research develops a clear concept about the BIM adoption in Iraq through investigating potential benefits that can be obtained through its application in construction projects also build a measurement model for these benefits. The research methodology was based on quantitative approach which adopted by conducting a questionnaire directed to professionals in the field of construction projects in the public and private sectors supported by personal interviews with respondents either individually or in groups. Three hundred copies of the forms were distributed to the companies, firms and engineering departments of the various ministries of the state. After the data was obtained, two software (SPSS and SmartPLS) was used for analyzing the data and constructing the measurement model. The results showed of all the benefits constructed within three key components. The first is knowledge support for management in term of (costs, data, processes), the second is effective design performance and the third is effective construction performance and all these components were modeled as a measurement model.
- 4 January 2018
- Published by Ital Publication in Civil Engineering Journal
- Vol. 3 (12) , 1349-1365
Open AccessTesting a Measurement Model of BIM Potential Benefits in Iraqi Construction Projects
Building Information Modeling (BIM) is an integrated and comprehensive system for all that related to the construction project, which includes a set of effective policies, procedures, and computer applications that increase the performance of the project during its life cycle. The objective of this research develops a clear concept about the BIM adoption in Iraq through investigating potential benefits that can be obtained through its application in construction projects also build a measurement model for these benefits. The research methodology was based on quantitative approach which adopted by conducting a questionnaire directed to professionals in the field of construction projects in the public and private sectors supported by personal interviews with respondents either individually or in groups. Three hundred copies of the forms were distributed to the companies, firms and engineering departments of the various ministries of the state. After the data was obtained, two software (SPSS and SmartPLS) was used for analyzing the data and constructing the measurement model. The results showed of all the benefits constructed within three key components. The first is knowledge support for management in term of (costs, data, processes), the second is effective design performance and the third is effective construction performance and all these components were modeled as a measurement model.
- Open Access
- 4 January 2018
- Published by Ital Publication in Civil Engineering Journal
- Vol. 3 (12) , 1247-1253
BIM as Evaluation Tool for Existing Building Energy and Quantities Takeoff
Information technology and its application have resulted in enormous development in the construction industry during the last decade. The main reason behind this evolution was the incorporation of Building Information Modeling (BIM) to be an inefficient construction approach. BIM is now globally considered to be the tool of transforming the construction process to new era. It is also considered as a good tool for the whole project lifecycle. The aim of the present study is to clarify how BIM can be used in after project construction within uncertainty and risky environment such as document losses and unrecorded change orders. Interviews with project team, project site photography, collecting the available schemes and documents were the approaches used in this work to re-build the projects models. The results obtained from this work show that the knowledge and expectations of BIM within existing building have an admirable achievements for construction industry. Furthermore, BIM approach used in this work made more progress in the implementation of BIM as a rehabilitation and renovation tool in civil projects. The conclusions from this study reflect high correlation between the quantities take off with what as-built constructed, more than the traditional approach. The glamorous lessons derived from BIM implementation for the case study is; working with a model in which all project team feel comfortable and harmonic, will ensure enough resources to make the model updated and ought to lead to a minimum conflict within the model or what traditionally called "project documents”.
- 4 January 2018
- Published by Ital Publication in Civil Engineering Journal
- Vol. 3 (12) , 1247-1253
Open AccessBIM as Evaluation Tool for Existing Building Energy and Quantities Takeoff
Information technology and its application have resulted in enormous development in the construction industry during the last decade. The main reason behind this evolution was the incorporation of Building Information Modeling (BIM) to be an inefficient construction approach. BIM is now globally considered to be the tool of transforming the construction process to new era. It is also considered as a good tool for the whole project lifecycle. The aim of the present study is to clarify how BIM can be used in after project construction within uncertainty and risky environment such as document losses and unrecorded change orders. Interviews with project team, project site photography, collecting the available schemes and documents were the approaches used in this work to re-build the projects models. The results obtained from this work show that the knowledge and expectations of BIM within existing building have an admirable achievements for construction industry. Furthermore, BIM approach used in this work made more progress in the implementation of BIM as a rehabilitation and renovation tool in civil projects. The conclusions from this study reflect high correlation between the quantities take off with what as-built constructed, more than the traditional approach. The glamorous lessons derived from BIM implementation for the case study is; working with a model in which all project team feel comfortable and harmonic, will ensure enough resources to make the model updated and ought to lead to a minimum conflict within the model or what traditionally called "project documents”.
- Top Cited Papers
- 1 January 2018
- Published by Elsevier in Advances in Engineering Software
- Vol. 115, 112-125
Predicting compressive strength of lightweight foamed concrete using extreme learning machine model
- 1 January 2018
- Published by Elsevier in Advances in Engineering Software
- Vol. 115, 112-125
Top Cited PapersPredicting compressive strength of lightweight foamed concrete using extreme learning machine model
- Open Access
- 1 June 2017
- Published by Elsevier in Case Studies in Construction Materials
- Vol. 6, 8-15
Modelling the strength of lightweight foamed concrete using support vector machine (SVM)
- 1 June 2017
- Published by Elsevier in Case Studies in Construction Materials
- Vol. 6, 8-15
Open AccessModelling the strength of lightweight foamed concrete using support vector machine (SVM)
- Open Access
- 1 January 2017
- Published by Taylor & Francis in Cogent Engineering
- Vol. 4 (1)
As built case studies for BIM as conflicts detection and documentation tool
As built documentation provide critical information that is needed during and afterward the construction. This process serve as a foundation upon which all changes, modifications or otherwise, made during the construction so that it can quickly obtain information about any design change. After construction, it serve as ready information source about what was actually built. Conflicts of the design documents with as built is crucial aspect of construction projects in order to prevent excessive cost of delays and work correction during operation and maintenance or renovation phases. Traditional documentation method sometime fails to serve in managing the development, rehabilitation and renovation of existing buildings. The lack of appropriate documents, change orders and as built-drawing for existing buildings are very common. These obstacles can be solved by the collaboration of all stakeholders at different phases of the project life cycle to insert, extract, update or amend related information. Since Building Information Modelling (BIM) has the potential to create a single model that offers visualization, clash detection, construction phases, and materials and testing together, this research will utilize the ability of BIM through case studies to address the conflicts detection through the project life-cycle. The results illustrates the main conflicts that had detected between the existing buildings and the available construction documents. The results of the two case studies prove that BIM model was very correlated to as built in term of quantities take off (coefficient was 95.8 and 99.8%) and in the final shop drawing. Also, the root mean square error was very little for BIM model (RMSE was 7.17 and 6.65) compared with traditional process for the quantities estimation compared with traditional process (RMSE was 43.75 and 47.33). These indications refer to high accuracy of BIM as a powerful tool for the re-documentation of existing building and their conflicts detection.
- 1 January 2017
- Published by Taylor & Francis in Cogent Engineering
- Vol. 4 (1)
Open AccessAs built case studies for BIM as conflicts detection and documentation tool
As built documentation provide critical information that is needed during and afterward the construction. This process serve as a foundation upon which all changes, modifications or otherwise, made during the construction so that it can quickly obtain information about any design change. After construction, it serve as ready information source about what was actually built. Conflicts of the design documents with as built is crucial aspect of construction projects in order to prevent excessive cost of delays and work correction during operation and maintenance or renovation phases. Traditional documentation method sometime fails to serve in managing the development, rehabilitation and renovation of existing buildings. The lack of appropriate documents, change orders and as built-drawing for existing buildings are very common. These obstacles can be solved by the collaboration of all stakeholders at different phases of the project life cycle to insert, extract, update or amend related information. Since Building Information Modelling (BIM) has the potential to create a single model that offers visualization, clash detection, construction phases, and materials and testing together, this research will utilize the ability of BIM through case studies to address the conflicts detection through the project life-cycle. The results illustrates the main conflicts that had detected between the existing buildings and the available construction documents. The results of the two case studies prove that BIM model was very correlated to as built in term of quantities take off (coefficient was 95.8 and 99.8%) and in the final shop drawing. Also, the root mean square error was very little for BIM model (RMSE was 7.17 and 6.65) compared with traditional process for the quantities estimation compared with traditional process (RMSE was 43.75 and 47.33). These indications refer to high accuracy of BIM as a powerful tool for the re-documentation of existing building and their conflicts detection.