Keitaro Kondo
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Research Interests
Keitaro Kondo has a total of 262 co-authors. Here are the top co-authors by number of shared publications:
Chikara Konno
19 shared publications- Takeo Nishitani
Graduate School of Engineering, Nagoya University
17 shared publications Kentaro Ochiai
15 shared publicationsK. Ochiai
13 shared publicationsKosuke Takakura
11 shared publications- Frederik Arbeiter
Karlsruhe Institute of Technology
10 shared publications
Latest Publications
- 1 May 2024
- Published by IOP Publishing in Journal of Instrumentation
- Vol. 19 (05) , T05013
High beam current operation with beam diagnostics at LIPAc
The Linear International Fusion Materials Irradiation Facility Prototype Accelerator (LIPAc) is under commissioning in Rokkasho Fusion Institute in Japan and aims to accelerate 125 mA D+ at 9 MeV in Continuous Wave mode for validating the IFMIF accelerator design. To ensure a fine characterization and tuning of the machine many beam diagnostics are installed spanning from injector to the beam dump. The beam operations in 1.0 ms pulsed D+ at 5 MeV were successfully completed with a low power beam dump in 2019. Despite the challenges posed by the pandemic, the crucial transition to a new LINAC configuration was also finalized to enable operation in 1.0 ms — CW D+ at 5 MeV with the high-power beam dump. The 1st beam operation of the configuration was carried out in 2021. The experiences and challenges encountered during these beam campaigns are described in this paper.
- 1 May 2024
- Published by IOP Publishing in Journal of Instrumentation
- Vol. 19 (05) , T05013
High beam current operation with beam diagnostics at LIPAc
The Linear International Fusion Materials Irradiation Facility Prototype Accelerator (LIPAc) is under commissioning in Rokkasho Fusion Institute in Japan and aims to accelerate 125 mA D+ at 9 MeV in Continuous Wave mode for validating the IFMIF accelerator design. To ensure a fine characterization and tuning of the machine many beam diagnostics are installed spanning from injector to the beam dump. The beam operations in 1.0 ms pulsed D+ at 5 MeV were successfully completed with a low power beam dump in 2019. Despite the challenges posed by the pandemic, the crucial transition to a new LINAC configuration was also finalized to enable operation in 1.0 ms — CW D+ at 5 MeV with the high-power beam dump. The 1st beam operation of the configuration was carried out in 2021. The experiences and challenges encountered during these beam campaigns are described in this paper.
- 2 September 2021
- Published by IOP Publishing in Nuclear Fusion
- Vol. 61 (11) , 116002
Neutron production measurement in the 125 mA 5 MeV deuteron beam commissioning of Linear IFMIF Prototype Accelerator (LIPAc) RFQ
The validation of the Linear IFMIF Prototype Accelerator (LIPAc) is being conducted in Rokkasho Fusion Institute of QST, Aomori, Japan. The beam commissioning of the novel LIPAc RFQ has been progressing significantly, and the acceleration of the world highest current deuteron beam of 125 mA to 5 MeV (1 ms, 1 Hz pulsed beam) was achieved for the 1st time in July 2019. This study is devoted to evaluating the amount of beam loss during the high current acceleration phase by measuring the neutron produced by the interaction of the beam with accelerator components so as to verify the accelerator design. The foil activation method and the 3He neutron probes were utilized. It turned out that there was no significant trace of unexpected beam loss at the high energy section of the RFQ and the Medium Energy Beam Transport (MEBT) section.The measurement using the 3He neutron probes provided an evidence that the beam loss was well controlled in the RFQ cavity as designed. This study concludes that the LIPAc RFQ as well as MEBT is working well as predicted by the design calculation, and its concept is successful.
- 2 September 2021
- Published by IOP Publishing in Nuclear Fusion
- Vol. 61 (11) , 116002
Neutron production measurement in the 125 mA 5 MeV deuteron beam commissioning of Linear IFMIF Prototype Accelerator (LIPAc) RFQ
The validation of the Linear IFMIF Prototype Accelerator (LIPAc) is being conducted in Rokkasho Fusion Institute of QST, Aomori, Japan. The beam commissioning of the novel LIPAc RFQ has been progressing significantly, and the acceleration of the world highest current deuteron beam of 125 mA to 5 MeV (1 ms, 1 Hz pulsed beam) was achieved for the 1st time in July 2019. This study is devoted to evaluating the amount of beam loss during the high current acceleration phase by measuring the neutron produced by the interaction of the beam with accelerator components so as to verify the accelerator design. The foil activation method and the 3He neutron probes were utilized. It turned out that there was no significant trace of unexpected beam loss at the high energy section of the RFQ and the Medium Energy Beam Transport (MEBT) section.The measurement using the 3He neutron probes provided an evidence that the beam loss was well controlled in the RFQ cavity as designed. This study concludes that the LIPAc RFQ as well as MEBT is working well as predicted by the design calculation, and its concept is successful.
- 1 April 2020
- Published by Elsevier in Fusion Engineering and Design
- Vol. 153
Validation of the Linear IFMIF Prototype Accelerator (LIPAc) in Rokkasho
- 1 April 2020
- Published by Elsevier in Fusion Engineering and Design
- Vol. 153
Validation of the Linear IFMIF Prototype Accelerator (LIPAc) in Rokkasho
- 25 December 2018
- Published by Elsevier in Fusion Engineering and Design
- Vol. 146, 293-298
Radiation shielding requirements for the full power operation of the linear IFMIF prototype accelerator (LIPAc) at Rokkasho
- 25 December 2018
- Published by Elsevier in Fusion Engineering and Design
- Vol. 146, 293-298
Radiation shielding requirements for the full power operation of the linear IFMIF prototype accelerator (LIPAc) at Rokkasho
- 1 November 2018
- Published by Elsevier in Fusion Engineering and Design
- Vol. 136, 1300-1305
Beam diagnostics of an ECR ion source on LIPAc injector for prototype IFMIF beam accelerator
- 1 November 2018
- Published by Elsevier in Fusion Engineering and Design
- Vol. 136, 1300-1305
Beam diagnostics of an ECR ion source on LIPAc injector for prototype IFMIF beam accelerator
- 1 November 2018
- Published by Elsevier in Fusion Engineering and Design
- Vol. 136, 252-257
Radiation safety study for the beam commissioning of IFMIF/EVEDA LIPAc RFQ in Rokkasho
- 1 November 2018
- Published by Elsevier in Fusion Engineering and Design
- Vol. 136, 252-257
Radiation safety study for the beam commissioning of IFMIF/EVEDA LIPAc RFQ in Rokkasho
- Open Access
- 1 May 2018
- Published by Elsevier in Nuclear Materials and Energy
- Vol. 15, 195-202
Linear IFMIF Prototype Accelerator (LIPAc): Installation activities for Phase-B beam commissioning in Rokkasho
- 1 May 2018
- Published by Elsevier in Nuclear Materials and Energy
- Vol. 15, 195-202
Open AccessLinear IFMIF Prototype Accelerator (LIPAc): Installation activities for Phase-B beam commissioning in Rokkasho
- 1 October 2015
- Published by Elsevier in Fusion Engineering and Design
- Vol. 98-99, 1998-2002
Shielding performances analysis for the IFMIF test facility based on high-fidelity Monte Carlo neutronic calculations
- 1 October 2015
- Published by Elsevier in Fusion Engineering and Design
- Vol. 98-99, 1998-2002
Shielding performances analysis for the IFMIF test facility based on high-fidelity Monte Carlo neutronic calculations
- 1 October 2014
- Published by Elsevier in Fusion Engineering and Design
- Vol. 89 (7-8) , 1758-1763
Neutronic analysis for the IFMIF EVEDA reference test cell and test facility
- 1 October 2014
- Published by Elsevier in Fusion Engineering and Design
- Vol. 89 (7-8) , 1758-1763
Neutronic analysis for the IFMIF EVEDA reference test cell and test facility