Moshe Eben-Chaime
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Moshe Eben-Chaime has a total of 29 co-authors. Here are the top co-authors by number of shared publications:
- Nava Pliskin
Department of Industrial Engineering and Management, Ben-Gurion University of the Negev, Beer-Sheva, Israel
3 shared publications Abraham Mehrez
2 shared publicationsAvital Bechar
2 shared publicationsB. Shneider
Department of Industrial Engineering and Management, Ben-Gurion University of the Negev, Beer Sheva, 84105, Israel
2 shared publicationsD. Gilad
Sion Ltd. Artificial Insemination Services, Hafez Haim, 79800, Israel
2 shared publications- Ilan Halachmi
The Volcani Center
2 shared publications
Latest Publications
- Open Access
- 16 July 2024
- Published by IEOM Society International
The Role of Fixed Costs in Supply Chains
Fixed costs are a fundamental component in the economy of industrial organizations, which can be a central factor to instability, as has been painfully learned during the crises of 2008-9 and COVID-19, but in normal times, too. Yet, fixed costs are totally absent in the extensive literature on the subject of pricing in supply chains management (SCM). A crucial distinction is the difference between the fixed costs which are referred to in this presentation and the ordering/set-up costs in lot sizing models of production-inventory systems. The fixed costs considered here are those of break even analyses – the cost which are associated with the establishment and the survival of production and service systems: return of capital investment plus financing costs, mortgages or rental, insurance, certain taxes, etc. Accordingly, the ordering/set-up costs are, most often, negligible compared to the fixed costs. Consequently, not lot or batch sizes of production-inventory models are considered here, but the total volume of the activity. The fixed costs may turn a profit to loss and have already done so more than once. In addition, the disregard of the fixed costs in the literature on pricing in SCM resulted in a false impression that the profit of the supplier, manufacturers in particular, is guaranteed, while in reality it is not. Therefore, the fixed costs constitute a critical issue and taking them into consideration is not only significant but compulsory. Moreover, the fixed costs add conflicts between members of supply chains. Risks and conflicts which are induced by the fixed costs in supply chains are demonstrated and discussed in this presentation. Fortunately, there is a solution: partnering by retrospective sharing of the actual outcome. This idea is also discussed in the presentation.
- 16 July 2024
- Published by IEOM Society International
Open AccessThe Role of Fixed Costs in Supply Chains
Fixed costs are a fundamental component in the economy of industrial organizations, which can be a central factor to instability, as has been painfully learned during the crises of 2008-9 and COVID-19, but in normal times, too. Yet, fixed costs are totally absent in the extensive literature on the subject of pricing in supply chains management (SCM). A crucial distinction is the difference between the fixed costs which are referred to in this presentation and the ordering/set-up costs in lot sizing models of production-inventory systems. The fixed costs considered here are those of break even analyses – the cost which are associated with the establishment and the survival of production and service systems: return of capital investment plus financing costs, mortgages or rental, insurance, certain taxes, etc. Accordingly, the ordering/set-up costs are, most often, negligible compared to the fixed costs. Consequently, not lot or batch sizes of production-inventory models are considered here, but the total volume of the activity. The fixed costs may turn a profit to loss and have already done so more than once. In addition, the disregard of the fixed costs in the literature on pricing in SCM resulted in a false impression that the profit of the supplier, manufacturers in particular, is guaranteed, while in reality it is not. Therefore, the fixed costs constitute a critical issue and taking them into consideration is not only significant but compulsory. Moreover, the fixed costs add conflicts between members of supply chains. Risks and conflicts which are induced by the fixed costs in supply chains are demonstrated and discussed in this presentation. Fortunately, there is a solution: partnering by retrospective sharing of the actual outcome. This idea is also discussed in the presentation.
- Open Access
- 5 April 2023
- Published by Athens Institute for Education and Research ATINER in Athens Journal of Business & Economics
- Vol. 9 (2) , 221-230
Demand Models, Revenue Curves and Profit
- 5 April 2023
- Published by Athens Institute for Education and Research ATINER in Athens Journal of Business & Economics
- Vol. 9 (2) , 221-230
Open AccessDemand Models, Revenue Curves and Profit
- Open Access
- 26 July 2022
- Published by IEOM Society International
- Vol. 12 (3)
Project "Schedule Is Different" Why? and What Should Be Done About It?
The portion of projects in the industrial activity is growing. One major cause are the rapid changes of product and models which force more frequent conduct of development projects. In the short history of project management as a self stand discipline, it is well known that many projects fail to wholly meet their planned objectives. A major reason to this reality is that projects last time. Often, very long time. This results in knowledge deficiencies and high levels of uncertainties. To improve projects' performances, substantial efforts are invested in project control, which is aimed at assuring that the project meets its planned objectives within budget and no later than a specified deadline. Accordingly, schedule is a prime concern in project control. It had been observed, however, that 'schedule is different' in the sense that it is known that schedule (performance) indicators of methods for project control fail to provide good information. Here it is proposed that the cause for this shortcoming is the fundamental difference between costs and duration in projects. The duration of the project is determined by only a subset of its activities as oppose to the project's cost, which is the sum of the costs of its components. This is the notion of criticality: the critical path, or critical chain-project's duration is determined by its critical activities. A direct consequence of this distinction is that the analysis and evaluation of control data at the project level can be misleading. This issue is discussed and demonstrated. Moreover, schedule and schedule control provide foremost input to the coordination of the project's operation-the synchronization between the various resources which are required for each activity. Hence, in this aspect, too, the relevant information should be developed and provided at the activity level. In response, it is argued that project control data should be processed, analyzed and evaluated at the activity level. A framework to implement this approach is proposed and its benefits are discussed.
- 26 July 2022
- Published by IEOM Society International
- Vol. 12 (3)
Open AccessProject "Schedule Is Different" Why? and What Should Be Done About It?
The portion of projects in the industrial activity is growing. One major cause are the rapid changes of product and models which force more frequent conduct of development projects. In the short history of project management as a self stand discipline, it is well known that many projects fail to wholly meet their planned objectives. A major reason to this reality is that projects last time. Often, very long time. This results in knowledge deficiencies and high levels of uncertainties. To improve projects' performances, substantial efforts are invested in project control, which is aimed at assuring that the project meets its planned objectives within budget and no later than a specified deadline. Accordingly, schedule is a prime concern in project control. It had been observed, however, that 'schedule is different' in the sense that it is known that schedule (performance) indicators of methods for project control fail to provide good information. Here it is proposed that the cause for this shortcoming is the fundamental difference between costs and duration in projects. The duration of the project is determined by only a subset of its activities as oppose to the project's cost, which is the sum of the costs of its components. This is the notion of criticality: the critical path, or critical chain-project's duration is determined by its critical activities. A direct consequence of this distinction is that the analysis and evaluation of control data at the project level can be misleading. This issue is discussed and demonstrated. Moreover, schedule and schedule control provide foremost input to the coordination of the project's operation-the synchronization between the various resources which are required for each activity. Hence, in this aspect, too, the relevant information should be developed and provided at the activity level. In response, it is argued that project control data should be processed, analyzed and evaluated at the activity level. A framework to implement this approach is proposed and its benefits are discussed.
- 4 May 2021
- Published by Taylor & Francis in IISE Transactions
- Vol. 54 (3) , 1-22
On the relationships between the design of assembly manufacturing and inspection systems and product quality
This study is a response to the observation that little attention has been paid to the relationship between production (manufacturing) system design and product quality. In particular, only very limited work exists analyzing assembly system quality when multiple products are produced in the same system. Here, a computational scheme to estimate material, capacity and resource requirements in assembly manufacturing systems with imperfect quality is proposed. Accurate estimation of these requirements is vital to system design. The proposed scheme integrates the design of both production and inspection systems, accounts for inspection errors of both types—missing defective units and false rejection—and enables the comparison of alternative designs. In addition, the structure of the inspection system significantly affects both the volumes of material flows and the structure of the material flow network. These ramifications of imperfect quality have been overlooked thus far, but are also examined and discussed in this study.
- 4 May 2021
- Published by Taylor & Francis in IISE Transactions
- Vol. 54 (3) , 1-22
On the relationships between the design of assembly manufacturing and inspection systems and product quality
This study is a response to the observation that little attention has been paid to the relationship between production (manufacturing) system design and product quality. In particular, only very limited work exists analyzing assembly system quality when multiple products are produced in the same system. Here, a computational scheme to estimate material, capacity and resource requirements in assembly manufacturing systems with imperfect quality is proposed. Accurate estimation of these requirements is vital to system design. The proposed scheme integrates the design of both production and inspection systems, accounts for inspection errors of both types—missing defective units and false rejection—and enables the comparison of alternative designs. In addition, the structure of the inspection system significantly affects both the volumes of material flows and the structure of the material flow network. These ramifications of imperfect quality have been overlooked thus far, but are also examined and discussed in this study.
- Open Access
- 7 March 2021
- Published by IEOM Society International
- Vol. 11 (1)
On the dependency of material flows on quality and the configuration of the inspection system
- 7 March 2021
- Published by IEOM Society International
- Vol. 11 (1)
Open AccessOn the dependency of material flows on quality and the configuration of the inspection system
- 29 April 2016
- Published by Taylor & Francis in Production Planning & Control
- Vol. 27 (12) , 1027-1038
Flexible work planning of service agents with load balancing
This work emerged from the need to better plan the daily work of 29 travelling service agents, who provide 1090 services to 412 customers in 283 sites, on daily average. A handy and flexible tool was developed and is presented herein. A major contribution of this study is an explicit consideration of the multi-dimensional nature of the problem by the inclusion of workload balancing, which may stand in conflict to cost minimisation. Further, the geographical distribution of the demand is highly irregular. Therefore, two load measures are required and balanced. This required to fitting a proper planning scheme. The planning tool has been applied successfully by the commercial service provider. Improvements in the order of 20% and more were obtained in key performance measures. Moreover, cost reductions, service improvement and load balance were obtained simultaneously: the standard deviations of the service times and working day’s duration were reduced by 18 and 58%, respectively. This enables to reduce the number of agents with no significant harm in performance. Additional practical advantages of the proposed tool are also discussed and demonstrated, for example, the ability to cope with geographical distributions and the flexibility to respond to daily variations in demand.
- 29 April 2016
- Published by Taylor & Francis in Production Planning & Control
- Vol. 27 (12) , 1027-1038
Flexible work planning of service agents with load balancing
This work emerged from the need to better plan the daily work of 29 travelling service agents, who provide 1090 services to 412 customers in 283 sites, on daily average. A handy and flexible tool was developed and is presented herein. A major contribution of this study is an explicit consideration of the multi-dimensional nature of the problem by the inclusion of workload balancing, which may stand in conflict to cost minimisation. Further, the geographical distribution of the demand is highly irregular. Therefore, two load measures are required and balanced. This required to fitting a proper planning scheme. The planning tool has been applied successfully by the commercial service provider. Improvements in the order of 20% and more were obtained in key performance measures. Moreover, cost reductions, service improvement and load balance were obtained simultaneously: the standard deviations of the service times and working day’s duration were reduced by 18 and 58%, respectively. This enables to reduce the number of agents with no significant harm in performance. Additional practical advantages of the proposed tool are also discussed and demonstrated, for example, the ability to cope with geographical distributions and the flexibility to respond to daily variations in demand.
- 23 March 2016
- Published by Wiley in Quality and Reliability Engineering International
- Vol. 32 (8) , 2995-2997
Unnoticed Effects of Inspection Errors and a Quality Paradox
- 23 March 2016
- Published by Wiley in Quality and Reliability Engineering International
- Vol. 32 (8) , 2995-2997
Unnoticed Effects of Inspection Errors and a Quality Paradox
- 1 July 2015
- Published by Elsevier in Journal of Manufacturing Systems
- Vol. 36, 1-6
Mutual effects of defective components in assemblies
- 1 July 2015
- Published by Elsevier in Journal of Manufacturing Systems
- Vol. 36, 1-6
Mutual effects of defective components in assemblies
- Open Access
- 1 January 2015
- Published by Elsevier in Procedia CIRP
- Vol. 36, 48-52
Using Process Design to Overcome Undesirable Consequences of Increased Product Complexity
- 1 January 2015
- Published by Elsevier in Procedia CIRP
- Vol. 36, 48-52
Open AccessUsing Process Design to Overcome Undesirable Consequences of Increased Product Complexity
- 13 January 2014
- Published by Emerald Publishing in International Journal of Productivity and Performance Management
- Vol. 63 (2) , 194-208
Hand-held computers to increase accuracy and productivity in agricultural work study
Purpose: – Labor is the largest single cost contributor in agriculture. Accurate estimation of labor requirements is, thus, a key to cost reduction. Work measurement is the professional discipline for this type of estimations, in the industrial engineering domain. Horticulture, however, lays a substantial barrier to work and, thus, to work measurement. Till harvesting, its products – fruits/flowers, are in fixed positions, and for all tasks the workers have to arrive at the plant. The purpose of this paper is to develop, test and analyze a system to perform horticultural work study in agricultural environments in order to accurately estimate the required amount of labor for each activity and to improve productivity. Design/methodology/approach: – In this paper, the development of an advanced system for work study on a hand-held computer (HHC) platform for horticultural work measurement is presented and an experimental study was conducted. The methodology consists of characteristics of the system platform including hardware, interface and software, development of a dedicated measuring software, a controlled experiment in agricultural environment and a statistical analysis. Findings: – The study shows that a single surveyor who uses traditional tools is subject to measurement errors, which can be reduced only with the assistance of a second surveyor. The study further shows that the HHC platform enables to avoid this second surveyor – a single surveyor who uses the HHC platform performs as accurate as two surveyors who use traditional tools. Of course, being computers, the HHC platform maintains the advantage of error free data transfer, in practically negligible time. Originality/value: – This paper presents a unique approach to perform work study in agricultural environment and contributes to minimize the errors accumulated in the process and the manpower required to perform the measurements.
- 13 January 2014
- Published by Emerald Publishing in International Journal of Productivity and Performance Management
- Vol. 63 (2) , 194-208
Hand-held computers to increase accuracy and productivity in agricultural work study
Purpose: – Labor is the largest single cost contributor in agriculture. Accurate estimation of labor requirements is, thus, a key to cost reduction. Work measurement is the professional discipline for this type of estimations, in the industrial engineering domain. Horticulture, however, lays a substantial barrier to work and, thus, to work measurement. Till harvesting, its products – fruits/flowers, are in fixed positions, and for all tasks the workers have to arrive at the plant. The purpose of this paper is to develop, test and analyze a system to perform horticultural work study in agricultural environments in order to accurately estimate the required amount of labor for each activity and to improve productivity. Design/methodology/approach: – In this paper, the development of an advanced system for work study on a hand-held computer (HHC) platform for horticultural work measurement is presented and an experimental study was conducted. The methodology consists of characteristics of the system platform including hardware, interface and software, development of a dedicated measuring software, a controlled experiment in agricultural environment and a statistical analysis. Findings: – The study shows that a single surveyor who uses traditional tools is subject to measurement errors, which can be reduced only with the assistance of a second surveyor. The study further shows that the HHC platform enables to avoid this second surveyor – a single surveyor who uses the HHC platform performs as accurate as two surveyors who use traditional tools. Of course, being computers, the HHC platform maintains the advantage of error free data transfer, in practically negligible time. Originality/value: – This paper presents a unique approach to perform work study in agricultural environment and contributes to minimize the errors accumulated in the process and the manpower required to perform the measurements.