GJGodfaurd Adjaie John

Godfaurd Adjaie John

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Godfaurd Adjaie John has a total of 11 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    A conceptual framework for measuring productivity and performance in Industry 5.0: A built environment perspective

    by Godfaurd A John, Kasun Gomis, Kelechi Bukola Babatunde

    The construction industry in most countries is an early indicator of the nation’s economic health. When things are buoyant and the construction market is booming, it indicates the state of the viability of the country’s economic position. The model used in measuring productivity since WWII (e.g., labour productivity, GDP per capita, multifactor productivity) does not seem suitable for the emerging industry 5.0 (I5.0), considering the prevailing factors within the Built Environment (BE). These metrics are optimised over the years to provide detailed and comprehensive insights into productivity trends and drivers, which lacks necessary attributes to measure productivity and performance in the context of I5.0 and the emerging future world. This paper employs a Scientometric analysis to understand the prevailing factors within the identified body of knowledge of measuring productivity in the BE. This is fed into the Cobb-Douglas function to develop a conceptual framework that redefines productivity measurement for the emerging I5.0 within the BE context. Through these methods, we identify key criteria for measuring productivity holistically, considering the intertwined effects of technological innovation, the UN’s Sustainable Development Goals (SDGs), and circular economic (CE) principles on construction industry performance. Our findings underscore the limitations of conventional metrics when applied to I5.0, highlighting the need for new units of analysis to facilitate meaningful improvements. This research proposes an extended productivity measure matrix that aligns with sustainable development, human-centric systems, and resilience-building initiatives, offering a pathway for more effective monitoring and enhancing productivity in the built environment.

  • BIM and project planning integration for on-site safety induction

    by Abdulkadir A. Ganah, Godfaurd A. John

    Purpose: The section of the research presented in this paper aims to review and explore health and safety (H&S) issues on construction sites. It has the sole intention of using better computer visualisation to meet the needs of site practitioners in understanding such H&S problems. Design/methodology/approach: The methodology follows a traditional literature review approach to understand the development of building information modelling (BIM) technology up to its current status. A questionnaire survey was conducted to gather information on the embedding of H&S planning by site practitioners within the BIM environment. Findings: BIM has the potential to be used in H&S planning procedures, particularly in those related to tasks on construction sites. A framework for an integrated visual tool is developed for better H&S practice on site. It may be used actively by all practitioners, starting with site induction and addresses, inter alia, personal hazard perception. Research limitations/implications: This paper provides a foundation for developing a tool that helps construction personnel explore potential H&S risks on site before construction begins. By introducing a framework for integrating BIM and project planning, a prototype can be developed to demonstrate the application of the proposed framework. Originality/value: The research presented in this paper introduces BIM usage during the construction stage as a tool that supports a H&S toolbox. The paper proposes the useful framework for better H&S practice on site that can be used actively by all practitioners. The intention is to find a way forward in addressing “real” H&S site issues that may not be easily understood by practitioners without the full aid of visualisation scenarios.


  • Sustainable human capacity development in the African built environment

    by Gloria Unoma Ene, Jack Steven Goulding, Godfaurd Adjaie John

    Purpose: A growing recognition that human capital is a more critical factor than physical capital in wealth creation has led to the drive for individuals, organisations, industries and societies to become knowledge producing entities. Africa’s growing population, high rate of urbanisation and demand for sustainable infrastructure development have highlighted the need for human capacity development (HCD). However, studies indicate that the supply systems for learning which African construction organisations rely on are weak and immature generating wide spread reports of skills shortages, skills mismatches, skill deficiencies and concomitant high unemployment. This paper forms the prologue in a wider research aimed at developing a workforce capability optimising model for construction firms and the purpose of this paper is to review literature relating to HCD to highlight needs and to explore the applicability of emerging workforce development (WD) approaches in project-based construction workplaces. Design/methodology/approach: Literature review, limited to peer reviewed academic publications in English from 2000 to 2016. Findings: Much of the literature reviewed focus on educational aspects and consequently basic entry skills into the construction workforce. Workplace learning (WL), though acknowledged, is not given much attention. However, life-long learning, WL and self-directed learning have taken on greater significance because of the transient nature of knowledge in the Knowledge Age. WD practices of construction firms in Africa range from non-existent to average particularly at intermediate skills levels. Originality/value: The paper makes a case for improved WD systems applicable to the African construction workplace and introduces elements of a proposed capability optimising framework that supports sustained effective learning environments and learners. Significantly, the model will incorporate HCD for intermediate skills and learning at the project level of the organisation.


  • Achieving Level 2 BIM by 2016 in the UK

    by A. A Ganah, G. A John

    The growth and advantage of Building Information Modeling (BIM) has recently gained momentum in the expanding needs of the construction industry, one that varies across disciplines. The UK government is the largest public stakeholder client that has realized the benefits and advantages of BIM when used in procuring projects. The usage and adoption of BIM in all UK government-procured projects with a Level 2 BIM status will be mandatory by 2016. Will this target be achievable by 2016? This study investigates that possibility. A critical review of the BIM literature and the evidence based on the government target of 2016 was carried out. At the current stage, it appears that Level 2 adoption is achievable by 2016 for large construction firms. However, the technology needs to be properly tailored to meet SMEs variables if the Level 2 status is to be achieved for the entire industry.


  • Contextual prerequisites for the application of ILS principles to the building services industry

    by G.A. John, D.J. Clements‐Croome, V. Fairey, H.M. Loy

    Purpose: This paper proposes assessing the context within which integrated logistic support (ILS) can be implemented for whole life performance of building services systems.Design/methodology/approach: The use of ILS within a through‐life business model (TLBM) is a better framework to achieve a well‐designed, constructed and managed product. However, for ILS to be implemented in a TLBM for building services systems, the practices, tools and techniques need certain contextual prerequisites tailored to suit the construction industry. These contextual prerequisites are discussed.Findings: The case studies conducted reinforced the contextual importance of prime contracting, partnering and team collaboration for the application of ILS techniques. The lack of data was a major hindrance to the full realisation of ILS techniques within the case studies.Originality/value: The paper concludes with the recognition of the value of these contextual prerequisites for the use of ILS techniques within the building industry.


  • Sustainable building solutions: a review of lessons from the natural world

    by Godfaurd John, Derek Clements-Croome, George Jeronimidis