Natalie M. Scala
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Natalie M. Scala has a total of 32 co-authors. Here are the top co-authors by number of shared publications:
- Thais da Costa Lago Alves
San Diego State University
5 shared publications - Jayant Rajgopal
Department of Industrial Engineering University of Pittsburgh 15261 Pittsburgh PA USA
4 shared publications Kim LaScola Needy
Department of Industrial Engineering, University of Arkansas, Fayetteville, Arkansas
4 shared publications- Min Liu
Syracuse Univ
4 shared publications Vincent Schiavone
Towson University Department of Business Analytics and Technology Management
4 shared publications- Paul L. Goethals
Department of Mathematical Sciences, United States Military Academy, West Point, New York, USA
3 shared publications
Latest Publications
- 21 November 2024
- Published by Wiley in Risk Analysis
- Vol. 45 (6) , 1558-1574
An information‐theoretic analysis of security behavior intentions amongst United States poll workers
In light of recent events related to national elections in the United States, safeguarding the security and integrity of forthcoming elections stands as a critical national priority. Elections equipment in the United States constitutes critical national infrastructure, and its operation relies on poll workers, who are trusted insiders. However, those insiders may pose risks if they make mistakes with detrimental consequences or act with malice. This research analyzes a large dataset of 2213 responses obtained from a survey of poll workers and potential poll workers in 13 states. The survey includes the Security Behavior Intentions Scale, which has been previously established and validated in the security literature. We use the responses to assess poll workers’ intentions of complying with established security‐related practices. We develop a novel model using information theory to examine potential weaknesses in security behaviors and identify poll worker security practices to improve to ensure the integrity of our elections. We also recommend action items and countermeasures for states and localities based upon this empirical analysis.
- 21 November 2024
- Published by Wiley in Risk Analysis
- Vol. 45 (6) , 1558-1574
An information‐theoretic analysis of security behavior intentions amongst United States poll workers
In light of recent events related to national elections in the United States, safeguarding the security and integrity of forthcoming elections stands as a critical national priority. Elections equipment in the United States constitutes critical national infrastructure, and its operation relies on poll workers, who are trusted insiders. However, those insiders may pose risks if they make mistakes with detrimental consequences or act with malice. This research analyzes a large dataset of 2213 responses obtained from a survey of poll workers and potential poll workers in 13 states. The survey includes the Security Behavior Intentions Scale, which has been previously established and validated in the security literature. We use the responses to assess poll workers’ intentions of complying with established security‐related practices. We develop a novel model using information theory to examine potential weaknesses in security behaviors and identify poll worker security practices to improve to ensure the integrity of our elections. We also recommend action items and countermeasures for states and localities based upon this empirical analysis.
- 28 October 2024
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 32 (11) , 7399-7425
Application of the maturity model for collaborative scheduling for construction projects
Purpose: This paper introduces the weighting, analysis and validation method used in the development of the Maturity Model for Collaborative Scheduling (MMCS). The scoring and ranking process introduced by the MMCS fills a gap in the literature by supporting the selection of collaborative scheduling (CS) practices that yield more weight toward the achievement of higher maturity levels in the development and implementation of CS. The ranking process can then be used during pre/post project execution to track collaborative scheduling in practice against the model’s weighting and provide the project team with constructive feedback and actionable steps for reaching the next highest level of collaboration. Design/methodology/approach: The MMCS, which focuses on five pillars (key areas of interest for CS) and related swim lanes (specific attributes), covers a broad range of areas in the construction industry and was coded into a survey. The relative weights of pillars and swim lanes were then established using the Delphi method with the group of subject matter experts (SMEs), analyzed using multi-objective decision analysis (MODA) and validated using 241 answers to a survey with questions drawn from the MMCS, including organizations across the industry in the United States. Findings: The project scoring defines bounds for bronze, silver and gold levels of collaboration in scheduling. Project evaluations can then be used to identify areas for continuous improvement and enhanced collaboration. We offer recommendations and best practices for project improvement. Originality/value: Two original contributions resulted from this work: (1) a method to elicit weights based on a combination of Delphi, MODA and survey methods was used to develop and validate a scale with three different maturity levels to support the use and continuous improvement of CS practices and (2) a validated model was used to assess the maturity level of CS in construction projects alongside specific recommendations to move upward in terms of maturity. In practice, project leaders can use this model to assess project performance, advance the project’s maturity and guide continuous improvement efforts for enhanced collaboration.
- 28 October 2024
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 32 (11) , 7399-7425
Application of the maturity model for collaborative scheduling for construction projects
Purpose: This paper introduces the weighting, analysis and validation method used in the development of the Maturity Model for Collaborative Scheduling (MMCS). The scoring and ranking process introduced by the MMCS fills a gap in the literature by supporting the selection of collaborative scheduling (CS) practices that yield more weight toward the achievement of higher maturity levels in the development and implementation of CS. The ranking process can then be used during pre/post project execution to track collaborative scheduling in practice against the model’s weighting and provide the project team with constructive feedback and actionable steps for reaching the next highest level of collaboration. Design/methodology/approach: The MMCS, which focuses on five pillars (key areas of interest for CS) and related swim lanes (specific attributes), covers a broad range of areas in the construction industry and was coded into a survey. The relative weights of pillars and swim lanes were then established using the Delphi method with the group of subject matter experts (SMEs), analyzed using multi-objective decision analysis (MODA) and validated using 241 answers to a survey with questions drawn from the MMCS, including organizations across the industry in the United States. Findings: The project scoring defines bounds for bronze, silver and gold levels of collaboration in scheduling. Project evaluations can then be used to identify areas for continuous improvement and enhanced collaboration. We offer recommendations and best practices for project improvement. Originality/value: Two original contributions resulted from this work: (1) a method to elicit weights based on a combination of Delphi, MODA and survey methods was used to develop and validate a scale with three different maturity levels to support the use and continuous improvement of CS practices and (2) a validated model was used to assess the maturity level of CS in construction projects alongside specific recommendations to move upward in terms of maturity. In practice, project leaders can use this model to assess project performance, advance the project’s maturity and guide continuous improvement efforts for enhanced collaboration.
- 7 June 2022
- Published by Taylor & Francis in Engineering Management Journal
- Vol. 35 (3) , 237-256
Comparative Analysis of Planning with the Critical Path Method, Last Planner System, and Location-Based Techniques in Brazil, Finland, and the United States
The Critical Path Method (CPM), the Last Planner System (LPS) and location-based methods, such as the Line of Balance (LB), are discussed extensively in the technical literature about schedules. However, no discussion exists focusing on the differences and similarities of these methods in terms of their use in different countries. Using chi-squared and Fisher’s exact tests, this research compared three countries (Brazil, Finland, and United States) and the methods to evaluate both intra- and inter-country implementation to gain additional insights about their use. Results suggest statistically significant intra- and inter-country differences regarding how these methods are used, with a specific focus on mechanics in the countries, offering important information to address their various scheduling needs. The results reflect the current state of practice; engineering and construction managers should understand different ways of understanding scheduling. Such understanding can lead to more efficient communication with collaborators and when incorporating foreign teams in projects. The study identifies the need for further scientific explanation as to why these methods are used in the manner they are intra-country as well as adaptions made in inter-country relationships.
- 7 June 2022
- Published by Taylor & Francis in Engineering Management Journal
- Vol. 35 (3) , 237-256
Comparative Analysis of Planning with the Critical Path Method, Last Planner System, and Location-Based Techniques in Brazil, Finland, and the United States
The Critical Path Method (CPM), the Last Planner System (LPS) and location-based methods, such as the Line of Balance (LB), are discussed extensively in the technical literature about schedules. However, no discussion exists focusing on the differences and similarities of these methods in terms of their use in different countries. Using chi-squared and Fisher’s exact tests, this research compared three countries (Brazil, Finland, and United States) and the methods to evaluate both intra- and inter-country implementation to gain additional insights about their use. Results suggest statistically significant intra- and inter-country differences regarding how these methods are used, with a specific focus on mechanics in the countries, offering important information to address their various scheduling needs. The results reflect the current state of practice; engineering and construction managers should understand different ways of understanding scheduling. Such understanding can lead to more efficient communication with collaborators and when incorporating foreign teams in projects. The study identifies the need for further scientific explanation as to why these methods are used in the manner they are intra-country as well as adaptions made in inter-country relationships.
- 14 March 2022
- Published by Taylor & Francis in Construction Management and Economics
- Vol. 40 (7-8) , 618-637
Prioritizing collaborative scheduling practices based on their impact on project performance
Collaborative scheduling (CS) and related practices impact the performance of construction projects which can be measured by key performance indicators (KPIs). However, little is known about which of these practices are implemented and how their combined implementation might impact KPIs. The objectives of this research are to identify perceptions of CS practices that drive project performance, define CS practices used by industry that impact KPIs, and establish practices that are more commonly implemented and have a higher potential to positively impact KPIs. The research team conducted a nationwide survey in the United States and obtained 241 usable responses. Utilizing an information theory approach to measure the uncertainty of implementation and impact of each practice, the research built a set of Chow–Liu tree models to determine the most efficient sequence of actions to improve CS. Results indicate that meeting owners’ expectation throughout the life-cycle of the project from design through construction and commissioning, using the schedule to support a strong project culture, and an effective communication plan were the top CS levers for overall KPI improvement. An innovative method was developed to help construction project managers discover the value of each CS practice, the relation between CS practices, and CS practices’ influence to project KPIs so that managers can improve KPIs efficiently by prioritizing their CS practices according to their own project needs.
- 14 March 2022
- Published by Taylor & Francis in Construction Management and Economics
- Vol. 40 (7-8) , 618-637
Prioritizing collaborative scheduling practices based on their impact on project performance
Collaborative scheduling (CS) and related practices impact the performance of construction projects which can be measured by key performance indicators (KPIs). However, little is known about which of these practices are implemented and how their combined implementation might impact KPIs. The objectives of this research are to identify perceptions of CS practices that drive project performance, define CS practices used by industry that impact KPIs, and establish practices that are more commonly implemented and have a higher potential to positively impact KPIs. The research team conducted a nationwide survey in the United States and obtained 241 usable responses. Utilizing an information theory approach to measure the uncertainty of implementation and impact of each practice, the research built a set of Chow–Liu tree models to determine the most efficient sequence of actions to improve CS. Results indicate that meeting owners’ expectation throughout the life-cycle of the project from design through construction and commissioning, using the schedule to support a strong project culture, and an effective communication plan were the top CS levers for overall KPI improvement. An innovative method was developed to help construction project managers discover the value of each CS practice, the relation between CS practices, and CS practices’ influence to project KPIs so that managers can improve KPIs efficiently by prioritizing their CS practices according to their own project needs.
- 3 February 2022
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 30 (4) , 1636-1656
The gold standard: developing a maturity model to assess collaborative scheduling
Purpose: The overall contribution of this work is to provide a usable maturity model for collaborative scheduling (CS) that extends the literature, identifies inconsistencies in schedule development, and improves collaboration in the construction industry.Design/methodology/approach: Via subject matter expert elicitation and focus groups, the maturity model establishes five pillars of collaboration—scheduling significance, planners and schedulers, scheduling representation, goal alignment with owner, and communication. The maturity model is then validated through iterative feedback and chi-squared statistical analysis of data obtained from a survey. The five pillars are tied to the literature and previous work in CS.Findings: The analysis shows that current industry projects are not consistent in collaboration practice implementation, and the maturity model identifies areas for collaboration improvement. The study's contributions to the body of knowledge are (1) developing a maturity model-based approach to define and measure the current level of collaboration and (2) discovering the level of consistency in scheduling collaboration practice implementation.Practical implications: The findings provide a benchmark for self-evaluation and peer-to-peer comparison for project managers. The model is also useful for project managers to develop effective strategies for improvement on targeted dimensions and metrics.Originality/value: The construction engineering and management (CEM) literature does not contain targeted models for scheduling collaboration in the context of maturity and, broadly speaking, neither does the literature at large. The literature also lacks actionable items as presented for the maturity model for collaborative scheduling (MMCS).
- 3 February 2022
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 30 (4) , 1636-1656
The gold standard: developing a maturity model to assess collaborative scheduling
Purpose: The overall contribution of this work is to provide a usable maturity model for collaborative scheduling (CS) that extends the literature, identifies inconsistencies in schedule development, and improves collaboration in the construction industry.Design/methodology/approach: Via subject matter expert elicitation and focus groups, the maturity model establishes five pillars of collaboration—scheduling significance, planners and schedulers, scheduling representation, goal alignment with owner, and communication. The maturity model is then validated through iterative feedback and chi-squared statistical analysis of data obtained from a survey. The five pillars are tied to the literature and previous work in CS.Findings: The analysis shows that current industry projects are not consistent in collaboration practice implementation, and the maturity model identifies areas for collaboration improvement. The study's contributions to the body of knowledge are (1) developing a maturity model-based approach to define and measure the current level of collaboration and (2) discovering the level of consistency in scheduling collaboration practice implementation.Practical implications: The findings provide a benchmark for self-evaluation and peer-to-peer comparison for project managers. The model is also useful for project managers to develop effective strategies for improvement on targeted dimensions and metrics.Originality/value: The construction engineering and management (CEM) literature does not contain targeted models for scheduling collaboration in the context of maturity and, broadly speaking, neither does the literature at large. The literature also lacks actionable items as presented for the maturity model for collaborative scheduling (MMCS).
- 24 January 2022
- Published by Wiley in Risk Analysis
- Vol. 42 (10) , 2327-2343
Evaluating mail‐based security for electoral processes using attack trees
Since the reports of Russian interference in the 2016 United States General Election, the security of voting processes has received increased attention from both state and federal authorities. The declaration by the US Department of Homeland Security in January 2017 that election systems be classified as the 17th component of critical infrastructure is just the beginning of a need for more secure voting processes. More recently, the COVID‐19 pandemic and the 2020 US General Election have placed greater emphasis specifically on mail‐based voting processes for electoral systems. The objective of this research is to provide greater insight into potential threats to mail‐based voting processes. Upon identifying an attack tree as an initial structure for evaluation, new threats are postulated, and an updated tree is proposed that accounts for more recent activities. Then, using an established assessment framework, the relative likelihood of each mail‐based voting process attack scenario is identified. The results facilitate providing election officials and policymakers with greater knowledge of how mail‐based voting system vulnerabilities develop as well as specific security measures that may be most beneficial.
- 24 January 2022
- Published by Wiley in Risk Analysis
- Vol. 42 (10) , 2327-2343
Evaluating mail‐based security for electoral processes using attack trees
Since the reports of Russian interference in the 2016 United States General Election, the security of voting processes has received increased attention from both state and federal authorities. The declaration by the US Department of Homeland Security in January 2017 that election systems be classified as the 17th component of critical infrastructure is just the beginning of a need for more secure voting processes. More recently, the COVID‐19 pandemic and the 2020 US General Election have placed greater emphasis specifically on mail‐based voting processes for electoral systems. The objective of this research is to provide greater insight into potential threats to mail‐based voting processes. Upon identifying an attack tree as an initial structure for evaluation, new threats are postulated, and an updated tree is proposed that accounts for more recent activities. Then, using an established assessment framework, the relative likelihood of each mail‐based voting process attack scenario is identified. The results facilitate providing election officials and policymakers with greater knowledge of how mail‐based voting system vulnerabilities develop as well as specific security measures that may be most beneficial.
- 1 April 2020
- Published by Taylor & Francis in Engineering Management Journal
- Vol. 32 (3) , 166-185
Schedules and Schedulers: A Study in the U.S. Construction Industry
This research examines how the construction industry addresses the roles of schedulers and schedules, with the goal of improving current practices. We use a mixed-mode approach of qualitative and quantitative data regarding the use of schedules and the role of schedulers in construction. Through influence diagrams and statistical analyses, we discover seven themes in the data and identify corresponding industry challenges related to each theme. Themes include the dynamic nature of schedules, changes in schedule level of detail throughout the life cycle, differences between planning and scheduling, and the evolving roles of schedulers. Based on in-depth discussions with a focus group and examining a large cross section of professionals in a nationwide survey, we propose recommendations to increase collaboration when developing schedules and to improve the roles of schedulers.
- 1 April 2020
- Published by Taylor & Francis in Engineering Management Journal
- Vol. 32 (3) , 166-185
Schedules and Schedulers: A Study in the U.S. Construction Industry
This research examines how the construction industry addresses the roles of schedulers and schedules, with the goal of improving current practices. We use a mixed-mode approach of qualitative and quantitative data regarding the use of schedules and the role of schedulers in construction. Through influence diagrams and statistical analyses, we discover seven themes in the data and identify corresponding industry challenges related to each theme. Themes include the dynamic nature of schedules, changes in schedule level of detail throughout the life cycle, differences between planning and scheduling, and the evolving roles of schedulers. Based on in-depth discussions with a focus group and examining a large cross section of professionals in a nationwide survey, we propose recommendations to increase collaboration when developing schedules and to improve the roles of schedulers.
- 1 December 2019
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 145 (12)
Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques
In construction, the most relevant systems used for project management (PM) and project production management (PPM) in the planning and control phases are critical path method (CPM), last planner system (LPS), and location-based techniques (LB). Studies have addressed these systems, mostly in isolated fashions. This study aims to compare and contrast their use in terms of PM and PPM and clarify industry benefits in order to eliminate potential misunderstandings about their use. A survey was administered to construction professionals in Brazil, China, Finland, and the United States. No single system addresses all needs of PM and PPM. CPM is the dominant system when considering the following characteristics: primary industry types, type of organization, size of organization, professional position within the organization, and area of work. Contributions to knowledge include that CPM is a contract requirement with perceived benefits associated with critical path analysis; LB and LPS have perceived benefits regarding continuous flow and use of resources, treatment of interferences, and improving production control. All systems were found to have a similar level of benefits for management of contracts, delay and change, and evaluation of the root causes of delays. The industry can benefit from aligning project scheduling methods with project needs.
- 1 December 2019
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 145 (12)
Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques
In construction, the most relevant systems used for project management (PM) and project production management (PPM) in the planning and control phases are critical path method (CPM), last planner system (LPS), and location-based techniques (LB). Studies have addressed these systems, mostly in isolated fashions. This study aims to compare and contrast their use in terms of PM and PPM and clarify industry benefits in order to eliminate potential misunderstandings about their use. A survey was administered to construction professionals in Brazil, China, Finland, and the United States. No single system addresses all needs of PM and PPM. CPM is the dominant system when considering the following characteristics: primary industry types, type of organization, size of organization, professional position within the organization, and area of work. Contributions to knowledge include that CPM is a contract requirement with perceived benefits associated with critical path analysis; LB and LPS have perceived benefits regarding continuous flow and use of resources, treatment of interferences, and improving production control. All systems were found to have a similar level of benefits for management of contracts, delay and change, and evaluation of the root causes of delays. The industry can benefit from aligning project scheduling methods with project needs.
- Open Access
- 29 March 2019
- Published by Wiley in Risk Analysis
- Vol. 39 (10) , 2119-2126
Risk and the Five Hard Problems of Cybersecurity
This perspectives article addresses risk in cyber defense and identifies opportunities to incorporate risk analysis principles into the cybersecurity field. The Science of Security (SoS) initiative at the National Security Agency seeks to further and promote interdisciplinary research in cybersecurity. SoS organizes its research into the Five Hard Problems (5HP): (1) scalability and composability; (2) policy‐governed secure collaboration; (3) security‐metrics–driven evaluation, design, development, and deployment; (4) resilient architectures; and (5) understanding and accounting for human behavior. However, a vast majority of the research sponsored by SoS does not consider risk and when it does so, only implicitly. Therefore, we identify opportunities for risk analysis in each hard problem and propose approaches to address these objectives. Such collaborations between risk and cybersecurity researchers will enable growth and insight in both fields, as risk analysts may apply existing methodology in a new realm, while the cybersecurity community benefits from accepted practices for describing, quantifying, working with, and mitigating risk.
- 29 March 2019
- Published by Wiley in Risk Analysis
- Vol. 39 (10) , 2119-2126
Open AccessRisk and the Five Hard Problems of Cybersecurity
This perspectives article addresses risk in cyber defense and identifies opportunities to incorporate risk analysis principles into the cybersecurity field. The Science of Security (SoS) initiative at the National Security Agency seeks to further and promote interdisciplinary research in cybersecurity. SoS organizes its research into the Five Hard Problems (5HP): (1) scalability and composability; (2) policy‐governed secure collaboration; (3) security‐metrics–driven evaluation, design, development, and deployment; (4) resilient architectures; and (5) understanding and accounting for human behavior. However, a vast majority of the research sponsored by SoS does not consider risk and when it does so, only implicitly. Therefore, we identify opportunities for risk analysis in each hard problem and propose approaches to address these objectives. Such collaborations between risk and cybersecurity researchers will enable growth and insight in both fields, as risk analysts may apply existing methodology in a new realm, while the cybersecurity community benefits from accepted practices for describing, quantifying, working with, and mitigating risk.
- Open Access
- 1 September 2018
- Published by Institute for Operations Research and the Management Sciences (INFORMS) in INFORMS Transactions on Education
- Vol. 19 (1)
Motivation and Analytics: Comparing Business and Engineering Students
Data analytics is a foundational topic for engineering as well as business students given its importance in subsequent coursework and curriculum. Many common, interdisciplinary analytical topics exist between the engineering and business fields; undergraduate students may approach learning those topics in various ways depending on program or major. This research examines differences in performance on analytics between engineering and business students that may be explained by differences in motivation and attitude. We use a survey and a lecture on trendlines with a common homework assignment to compare the two groups of students. Instructors of an engineering and a business course that incorporate analytics gave the same lecture on the use of spreadsheets to analyze trendline data, assigned the same individual homework assignment, and administered an end-of-module survey. The survey was built from the established MUSIC® Model of Academic Motivation. Analysis of the student data will address differences in motivation and how the program or major impacts student perception of analytical problem solving and contributes to performance on related assignments. We discuss quantitative and qualitative differences between engineering and business majors, concluding with a discussion of future work and some strategies for educators to use when teaching analytics.
- 1 September 2018
- Published by Institute for Operations Research and the Management Sciences (INFORMS) in INFORMS Transactions on Education
- Vol. 19 (1)
Open AccessMotivation and Analytics: Comparing Business and Engineering Students
Data analytics is a foundational topic for engineering as well as business students given its importance in subsequent coursework and curriculum. Many common, interdisciplinary analytical topics exist between the engineering and business fields; undergraduate students may approach learning those topics in various ways depending on program or major. This research examines differences in performance on analytics between engineering and business students that may be explained by differences in motivation and attitude. We use a survey and a lecture on trendlines with a common homework assignment to compare the two groups of students. Instructors of an engineering and a business course that incorporate analytics gave the same lecture on the use of spreadsheets to analyze trendline data, assigned the same individual homework assignment, and administered an end-of-module survey. The survey was built from the established MUSIC® Model of Academic Motivation. Analysis of the student data will address differences in motivation and how the program or major impacts student perception of analytical problem solving and contributes to performance on related assignments. We discuss quantitative and qualitative differences between engineering and business majors, concluding with a discussion of future work and some strategies for educators to use when teaching analytics.