Hamed Zamani Sabzi
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Hamed Zamani Sabzi has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
James Phillip King
Department of Civil Engineering, New Mexico State University, MSC 3CE, PO Box 30001, Las Cruces, NM, USA, 88003
2 shared publicationsCharlotte C. Gard
1 shared publication- J. Phillip King
Associate Department Head, Dept. of Civil Engineering, New Mexico State Univ., MSC 3CE, P.O. Box 30001, Las Cruces, NM 88003-0083; Urban Water Engineering Research Center, Stanford Univ., Stanford, CA 94305
1 shared publication Shalamu Abudu
Texas AgriLife Research & Extension Center at El Paso, Texas A&M University System, 1380 A&M Circle, El Paso, TX 79927, USA
1 shared publication- Shalamu Abudu
East Bay Municipal Utilities District, CA, USA
1 shared publication
Latest Publications
- Open Access
- 1 January 2016
- Published by Elsevier in Operations Research Perspectives
- Vol. 3, 92-117
Statistical and analytical comparison of multi-criteria decision-making techniques under fuzzy environment
- 1 January 2016
- Published by Elsevier in Operations Research Perspectives
- Vol. 3, 92-117
Open AccessStatistical and analytical comparison of multi-criteria decision-making techniques under fuzzy environment
- 29 July 2015
- Published by American Society of Civil Engineers (ASCE)
- p. 91-100
Optimal Management of Watershed under Uncertainty: A Case Study in Diez Lagos Flood Catchment Area, Southern New Mexico
In water resource projects, most of the constraints and objectives for the decision-making process are not deterministic and cannot be specified precisely; these criteria therefore introduce various levels of uncertainty that cause different levels of risk. By quantifying different sources of uncertainty, however, risks related with watershed management can be minimized. Such quantification of existing uncertainties can be accomplished through both probability theory and fuzzy sets. The case study in this research involves the application of a fuzzy optimization method to the management of a watershed to the west of the Mesilla Valley in southern New Mexico. In this watershed, flood runoff goes to a flood-controlling pond system that simultaneously protects the downstream residential areas and creates opportunities for local direct water uses, such as riparian restoration, water delivery to downstream areas, and aquifer recharge. By considering the uncertainty involved in most water resource projects, the fuzzy optimization method in this case study was able to recommend an optimal management approach for the multi-objective flood-controlling pond system under consideration, an approach that is extendable to other similar cases.
- 29 July 2015
- Published by American Society of Civil Engineers (ASCE)
- p. 91-100
Optimal Management of Watershed under Uncertainty: A Case Study in Diez Lagos Flood Catchment Area, Southern New Mexico
In water resource projects, most of the constraints and objectives for the decision-making process are not deterministic and cannot be specified precisely; these criteria therefore introduce various levels of uncertainty that cause different levels of risk. By quantifying different sources of uncertainty, however, risks related with watershed management can be minimized. Such quantification of existing uncertainties can be accomplished through both probability theory and fuzzy sets. The case study in this research involves the application of a fuzzy optimization method to the management of a watershed to the west of the Mesilla Valley in southern New Mexico. In this watershed, flood runoff goes to a flood-controlling pond system that simultaneously protects the downstream residential areas and creates opportunities for local direct water uses, such as riparian restoration, water delivery to downstream areas, and aquifer recharge. By considering the uncertainty involved in most water resource projects, the fuzzy optimization method in this case study was able to recommend an optimal management approach for the multi-objective flood-controlling pond system under consideration, an approach that is extendable to other similar cases.