Giorgio Consigli
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Giorgio Consigli has a total of 70 co-authors. Here are the top co-authors by number of shared publications:
- Vittorio Moriggia
Department of Economics, University of Bergamo, Bergamo, Italy
6 shared publications - Zhiping Chen
School of Mathematics and Statistics, Xi’an Jiaotong University, Xi’an, People’s Republic of China
5 shared publications - Francesca Maggioni
Department of Management, Information and Production Engineering University of Bergamo Viale G. Marconi 5 24044 Dalmine Italy
4 shared publications Gaetano Iaquinta
Department of Mathematics, Statistics and Computer Science, University of Bergamo, Bergamo, Italy
4 shared publications- Jia Liu
Xi’an Jiaotong University
4 shared publications - Sebastiano Vitali
Department of Economics, University of Bergamo, Bergamo, Italy
4 shared publications
Latest Publications
- 3 November 2026
- Published by Springer Nature in TOP
- p. 1-35
A practical prioritization scheme for goal-based asset–liability management
- 3 November 2026
- Published by Springer Nature in TOP
- p. 1-35
A practical prioritization scheme for goal-based asset–liability management
- 14 September 2026
- Published by Oxford University Press (OUP) in IMA Journal of Management Mathematics
- Vol. 37 (4) , 935-943
Looking ahead in financial planning and the impact of climate variables in finance
- 14 September 2026
- Published by Oxford University Press (OUP) in IMA Journal of Management Mathematics
- Vol. 37 (4) , 935-943
Looking ahead in financial planning and the impact of climate variables in finance
- Top Cited PapersOpen Access
- 8 January 2026
- Published by Springer Nature in Annals of Operations Research
- p. 1-42
Asset liability management under sequential stochastic dominance constraints
We consider a financial intermediary managing assets and liabilities exposed to several risk sources and seeking an optimal portfolio strategy to minimise the initial capital invested and the total risk associated with investment losses and financial debt. We formulate the problem as a multistage stochastic programming (MSP) model, with a time-consistent dynamic risk measure in the objective function to control the investment risk. To ensure that the intermediary’s financial equilibrium is preserved, we introduce a funding constraint in the model by enforcing in a time-consistent manner a sequential second-order stochastic dominance (SSD) of the portfolio return distribution over the liability distribution. We demonstrate that imposing the SSD constraint at the last-but-one stage is sufficient to enforce the SSD ordering at each stage. To deal with the computational burden of associated MSP, we develop a novel decomposition scheme integrating, for the first time in the literature, time-consistent dynamic risk measures and sequential stochastic dominance constraints. The proposed methodology is computationally validated on a case study developed on a property and casualty asset-liability management problem.
- 8 January 2026
- Published by Springer Nature in Annals of Operations Research
- p. 1-42
Top Cited PapersOpen AccessAsset liability management under sequential stochastic dominance constraints
We consider a financial intermediary managing assets and liabilities exposed to several risk sources and seeking an optimal portfolio strategy to minimise the initial capital invested and the total risk associated with investment losses and financial debt. We formulate the problem as a multistage stochastic programming (MSP) model, with a time-consistent dynamic risk measure in the objective function to control the investment risk. To ensure that the intermediary’s financial equilibrium is preserved, we introduce a funding constraint in the model by enforcing in a time-consistent manner a sequential second-order stochastic dominance (SSD) of the portfolio return distribution over the liability distribution. We demonstrate that imposing the SSD constraint at the last-but-one stage is sufficient to enforce the SSD ordering at each stage. To deal with the computational burden of associated MSP, we develop a novel decomposition scheme integrating, for the first time in the literature, time-consistent dynamic risk measures and sequential stochastic dominance constraints. The proposed methodology is computationally validated on a case study developed on a property and casualty asset-liability management problem.
- Open Access
- 16 October 2025
- Published by Springer Nature in Annals of Operations Research
- Vol. 366 (1) , 239-280
Guaranteed funds’ replication by reinforcement learning
- 16 October 2025
- Published by Springer Nature in Annals of Operations Research
- Vol. 366 (1) , 239-280
Open AccessGuaranteed funds’ replication by reinforcement learning
- Open Access
Asset liability management under sequential stochastic dominance constraints
We consider a financial intermediary managing assets and liabilities exposed to several risk sources and seeking an optimal portfolio strategy to minimise the initial capital invested and the total risk associated with investment losses and financial debt. We formulate the problem as a multistage stochastic programming model, with a time-consistent dynamic risk measure in the objective function to control the investment risk. To ensure that the intermediary's financial equilibrium is preserved, we introduce a funding constraint in the model by enforcing in a time-consistent manner a sequential second-order stochastic dominance (SSD) of the portfolio return distribution over the liability distribution. We demonstrate that imposing the SSD constraint at the last-but-one stage is sufficient to enforce the SSD ordering at each stage. To deal with the computational burden of associated MSP, we develop a novel decomposition scheme integrating, for the first time in the literature, time-consistent dynamic risk measures and sequential stochastic dominance constraints. The proposed methodology is computationally validated on a case study developed on a property and casualty ALM problem.
Open AccessAsset liability management under sequential stochastic dominance constraints
We consider a financial intermediary managing assets and liabilities exposed to several risk sources and seeking an optimal portfolio strategy to minimise the initial capital invested and the total risk associated with investment losses and financial debt. We formulate the problem as a multistage stochastic programming model, with a time-consistent dynamic risk measure in the objective function to control the investment risk. To ensure that the intermediary's financial equilibrium is preserved, we introduce a funding constraint in the model by enforcing in a time-consistent manner a sequential second-order stochastic dominance (SSD) of the portfolio return distribution over the liability distribution. We demonstrate that imposing the SSD constraint at the last-but-one stage is sufficient to enforce the SSD ordering at each stage. To deal with the computational burden of associated MSP, we develop a novel decomposition scheme integrating, for the first time in the literature, time-consistent dynamic risk measures and sequential stochastic dominance constraints. The proposed methodology is computationally validated on a case study developed on a property and casualty ALM problem.
- 26 March 2025
- Published by Taylor & Francis in Quantitative Finance
- Vol. 25 (4) , 543-575
Multiperiod interval-based stochastic dominance with application to dynamic portfolios
- 26 March 2025
- Published by Taylor & Francis in Quantitative Finance
- Vol. 25 (4) , 543-575
Multiperiod interval-based stochastic dominance with application to dynamic portfolios
- Open Access
- 27 May 2024
- Published by Elsevier in Engineering Applications of Artificial Intelligence
- Vol. 133
Optimal dynamic fixed-mix portfolios based on reinforcement learning with second order stochastic dominance
- 27 May 2024
- Published by Elsevier in Engineering Applications of Artificial Intelligence
- Vol. 133
Open AccessOptimal dynamic fixed-mix portfolios based on reinforcement learning with second order stochastic dominance
- 17 April 2024
- Published by Springer Nature in Annals of Operations Research
- p. 1-39
Multi-period portfolio selection with interval-based conditional value-at-risk
- 17 April 2024
- Published by Springer Nature in Annals of Operations Research
- p. 1-39
Multi-period portfolio selection with interval-based conditional value-at-risk
- 14 January 2024
- Published by Oxford University Press (OUP) in IMA Journal of Management Mathematics
- Vol. 35 (3) , 345-377
The cost of delay as risk measure in target-based multi-period portfolio selection models
Increasingly in recent years the fund management industry has evolved towards so-called goal-based investing paradigms, under which investors are assumed to base their portfolio strategies on pre-specified targets to be attained in the future. A similar decision model is common in the wealth management and the life insurance industries where targets may be associated with long term investment horizons and retirement planning problems. Based on this evidence, we propose in this article a novel risk measure explicitly focusing on the financial cost that may be associated with a delay in reaching those targets. We show that the definition of this risk measure is both rather natural and effective to capture investors’ risk preferences. A dynamic portfolio selection model is developed to assess the effectiveness of the risk measure from financial and risk control perspectives. The introduced risk measure has good properties and it is related to the Value-at-Risk (VaR) with a given confidence level. Under sufficiently general statistical assumptions, we derive a closed form solution to a mean-risk formulation of the portfolio problem in which the cost of delay is taken as risk measure. Finally, a set of numerical tests validate the proposed portfolio selection model and show a set of comparative results with respect to a classical dynamic mean-variance model.
- 14 January 2024
- Published by Oxford University Press (OUP) in IMA Journal of Management Mathematics
- Vol. 35 (3) , 345-377
The cost of delay as risk measure in target-based multi-period portfolio selection models
Increasingly in recent years the fund management industry has evolved towards so-called goal-based investing paradigms, under which investors are assumed to base their portfolio strategies on pre-specified targets to be attained in the future. A similar decision model is common in the wealth management and the life insurance industries where targets may be associated with long term investment horizons and retirement planning problems. Based on this evidence, we propose in this article a novel risk measure explicitly focusing on the financial cost that may be associated with a delay in reaching those targets. We show that the definition of this risk measure is both rather natural and effective to capture investors’ risk preferences. A dynamic portfolio selection model is developed to assess the effectiveness of the risk measure from financial and risk control perspectives. The introduced risk measure has good properties and it is related to the Value-at-Risk (VaR) with a given confidence level. Under sufficiently general statistical assumptions, we derive a closed form solution to a mean-risk formulation of the portfolio problem in which the cost of delay is taken as risk measure. Finally, a set of numerical tests validate the proposed portfolio selection model and show a set of comparative results with respect to a classical dynamic mean-variance model.
- 11 July 2022
- Published by Taylor & Francis in Quantitative Finance
- Vol. 22 (9) , 1759-1784
Optimal long-term Tier 1 employee pension management with an application to Chinese urban areas
We formulate a stochastic optimization problem from the perspective of an investment committee responsible for Tier 1 social security pension policies and whose decisions are bound to have relevant economic and social consequences. The adopted modelling approach combines canonical multistage stochastic programming (MSP) with dynamic stochastic control (DSC): the first applies to the short-medium term, the second to the long-term. Through the combined framework, we are able to span a long planning horizon without jeopardizing the accuracy of scenario tree based medium-term planning. We apply this methodology to the Chinese pension system, which relies on two large reference areas for rural and urban populations. In this article, we concentrate on the ever-growing urban public pension system, which is facing significant challenges due to a declining workforce and a rapidly ageing population. This welfare area, originally conceived as a pay-as-you-go (PAYG) system, has undergone several recent reforms to enhance its long-term sustainability and reduce the interventions of the central government required to improve its funding condition. Among those relevant in our setting, is the reduction of policy constraints that until 2015 severely limited the possibility to invest in assets other than traditional, locally traded, long-term fixed income securities. We propose an optimization model in which the decisions of the investment management aim at significantly reducing central government interventions as a last resort liquidity provider and progressively improving the system funding condition. A rich set of computational and economic evidence is presented to validate the methodology and clarify its potential benefits to pension system efficiency.
- 11 July 2022
- Published by Taylor & Francis in Quantitative Finance
- Vol. 22 (9) , 1759-1784
Optimal long-term Tier 1 employee pension management with an application to Chinese urban areas
We formulate a stochastic optimization problem from the perspective of an investment committee responsible for Tier 1 social security pension policies and whose decisions are bound to have relevant economic and social consequences. The adopted modelling approach combines canonical multistage stochastic programming (MSP) with dynamic stochastic control (DSC): the first applies to the short-medium term, the second to the long-term. Through the combined framework, we are able to span a long planning horizon without jeopardizing the accuracy of scenario tree based medium-term planning. We apply this methodology to the Chinese pension system, which relies on two large reference areas for rural and urban populations. In this article, we concentrate on the ever-growing urban public pension system, which is facing significant challenges due to a declining workforce and a rapidly ageing population. This welfare area, originally conceived as a pay-as-you-go (PAYG) system, has undergone several recent reforms to enhance its long-term sustainability and reduce the interventions of the central government required to improve its funding condition. Among those relevant in our setting, is the reduction of policy constraints that until 2015 severely limited the possibility to invest in assets other than traditional, locally traded, long-term fixed income securities. We propose an optimization model in which the decisions of the investment management aim at significantly reducing central government interventions as a last resort liquidity provider and progressively improving the system funding condition. A rich set of computational and economic evidence is presented to validate the methodology and clarify its potential benefits to pension system efficiency.