Stephanie C. Ashbolt
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Stephanie C. Ashbolt has a total of 14 co-authors. Here are the top co-authors by number of shared publications:
- B. J. C. Perera
Victoria University
3 shared publications S. Maheepala
Commonwealth Scientific Industrial and Research Organisation
2 shared publicationsB. J. C. Perera
Victoria University
1 shared publicationB. S. McIntosh
International Water Centre, PO Box 10907, Adelaide St, Brisbane, Queensland, 4000, Australia
1 shared publicationB.J.C. Perera
Institute of Sustainability and Innovation, College of Engineering and Science, Victoria University, Footscray, Australia
1 shared publicationDonghui Chen
1 shared publication
Latest Publications
- 1 April 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Water Resources Planning and Management
- Vol. 144 (4)
Multiobjective Optimization of Seasonal Operating Rules for Water Grids Using Streamflow Forecast Information
Multiobjective simulation-optimization is a useful tool for determining operating rules for water supply that are optimal for multiple management objectives and expected conditions over the planning period. Previous studies have shown the benefits of streamflow forecasts in improving optimized objective performance of reservoir operating rules. This study demonstrates a simple method for incorporating publicly available streamflow forecast information in operational planning for a water grid. Multiobjective optimization is used to find operating rules for a case study that are optimal for three management objectives—maximizing minimum system storage, minimizing operational cost, and minimizing spills from reservoirs—and for forecast inflow scenarios. These forecast-optimized rules are compared to those optimized using inflow scenarios from the historical distribution, representing operation in the absence of forecast information. The results across four seasonal (3-month) planning periods indicate that, on average, operating rules optimized using forecast streamflow information perform slightly better in terms of the management objectives than those optimized using historical inflow information. Using multiple scenarios of inflow that span the forecast distribution increases the robustness of the operating rules and reduces the risk of underperformance because of forecast inaccuracy. The results suggest that incorporating streamflow forecast information into multiobjective simulation-optimization has the potential to provide improvements in seasonal operating rules for a water grid.
- 1 April 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Water Resources Planning and Management
- Vol. 144 (4)
Multiobjective Optimization of Seasonal Operating Rules for Water Grids Using Streamflow Forecast Information
Multiobjective simulation-optimization is a useful tool for determining operating rules for water supply that are optimal for multiple management objectives and expected conditions over the planning period. Previous studies have shown the benefits of streamflow forecasts in improving optimized objective performance of reservoir operating rules. This study demonstrates a simple method for incorporating publicly available streamflow forecast information in operational planning for a water grid. Multiobjective optimization is used to find operating rules for a case study that are optimal for three management objectives—maximizing minimum system storage, minimizing operational cost, and minimizing spills from reservoirs—and for forecast inflow scenarios. These forecast-optimized rules are compared to those optimized using inflow scenarios from the historical distribution, representing operation in the absence of forecast information. The results across four seasonal (3-month) planning periods indicate that, on average, operating rules optimized using forecast streamflow information perform slightly better in terms of the management objectives than those optimized using historical inflow information. Using multiple scenarios of inflow that span the forecast distribution increases the robustness of the operating rules and reduces the risk of underperformance because of forecast inaccuracy. The results suggest that incorporating streamflow forecast information into multiobjective simulation-optimization has the potential to provide improvements in seasonal operating rules for a water grid.
- 5 December 2017
- Published by Taylor & Francis in Hydrological Sciences Journal
- Vol. 62 (16) , 2631-2654
Interpreting a Pareto set of operating options for water grids: a framework and case study
Multi-objective optimisation is being increasingly applied in water supply management to identify optimal operating options. However, a key challenge in the implementation of multi-objective optimisation is interpreting the large and multidimensional Pareto-optimal set. This paper shows how cluster, visual and post-optimisation analysis can aid the decision maker in addressing this challenge. This is demonstrated for a case study based on South East Queensland Water Grid, Australia, as part of a broader operational planning framework. Firstly, cluster analysis identifies a smaller set of representative options to aid in visual analysis. Secondly, visual analysis techniques are used to identify the trade-offs between objectives, the relationships between decision variables and objective performance, and to shortlist promising operating options. Finally, post-optimisation analysis techniques identify efficient operating options from the Pareto set, based on decision-maker preferences. Together these techniques can be used to identify a shortlist of operating options, for further consideration using multicriteria analysis.
- 5 December 2017
- Published by Taylor & Francis in Hydrological Sciences Journal
- Vol. 62 (16) , 2631-2654
Interpreting a Pareto set of operating options for water grids: a framework and case study
Multi-objective optimisation is being increasingly applied in water supply management to identify optimal operating options. However, a key challenge in the implementation of multi-objective optimisation is interpreting the large and multidimensional Pareto-optimal set. This paper shows how cluster, visual and post-optimisation analysis can aid the decision maker in addressing this challenge. This is demonstrated for a case study based on South East Queensland Water Grid, Australia, as part of a broader operational planning framework. Firstly, cluster analysis identifies a smaller set of representative options to aid in visual analysis. Secondly, visual analysis techniques are used to identify the trade-offs between objectives, the relationships between decision variables and objective performance, and to shortlist promising operating options. Finally, post-optimisation analysis techniques identify efficient operating options from the Pareto set, based on decision-maker preferences. Together these techniques can be used to identify a shortlist of operating options, for further consideration using multicriteria analysis.
- 1 August 2017
- Published by American Society of Civil Engineers (ASCE) in Journal of Water Resources Planning and Management
- Vol. 143 (8)
Multicriteria Analysis to Select an Optimal Operating Option for a Water Grid
Water supply systems are diversifying and expanding in response to climate pressures and population growth. However, these water grids present challenges for the water supply manager in identifying optimal operating options for the short term. This study demonstrates the final step in a framework to address these challenges, multicriteria analysis, using a case study based on the South East Queensland water grid. A shortlist of nine water grid operating options have been identified, which are optimal in terms of minimizing total operational cost, maximizing water security, and minimizing spills from reservoirs, over a 5-year period. This study assesses the performance of each of these nine operating options against a wider set of 18 criteria reflecting cost, supply reliability, environmental flow, water quality, reservoir spill, and water security concerns. The weighted summation multicriteria analysis technique is used to combine and rank performance of the nine operating options against the 18 criteria. An operating option is selected that performs best on average across the 18 criteria and four scenarios of preference weights. This operating option comprises a set of operating rules that can form the basis of a short-term optimal annual operating plan.
- 1 August 2017
- Published by American Society of Civil Engineers (ASCE) in Journal of Water Resources Planning and Management
- Vol. 143 (8)
Multicriteria Analysis to Select an Optimal Operating Option for a Water Grid
Water supply systems are diversifying and expanding in response to climate pressures and population growth. However, these water grids present challenges for the water supply manager in identifying optimal operating options for the short term. This study demonstrates the final step in a framework to address these challenges, multicriteria analysis, using a case study based on the South East Queensland water grid. A shortlist of nine water grid operating options have been identified, which are optimal in terms of minimizing total operational cost, maximizing water security, and minimizing spills from reservoirs, over a 5-year period. This study assesses the performance of each of these nine operating options against a wider set of 18 criteria reflecting cost, supply reliability, environmental flow, water quality, reservoir spill, and water security concerns. The weighted summation multicriteria analysis technique is used to combine and rank performance of the nine operating options against the 18 criteria. An operating option is selected that performs best on average across the 18 criteria and four scenarios of preference weights. This operating option comprises a set of operating rules that can form the basis of a short-term optimal annual operating plan.
- 1 October 2016
- Published by American Society of Civil Engineers (ASCE) in Journal of Water Resources Planning and Management
- Vol. 142 (10)
Using Multiobjective Optimization to Find Optimal Operating Rules for Short-Term Planning of Water Grids
Water grids are emerging as a means to address water scarcity in urban areas. These water grids are more complex than traditional supply systems, bringing new challenges to water-grid management. This paper seeks to address these challenges by demonstrating the capability of multiobjective optimization to aid in short-term operational planning for water grids. A framework for applying multiobjective optimization to short-term operational planning is demonstrated for a case study based on the South East Queensland Water Grid in Australia. The aim of the case study application is to find short-term (1 year) operating rules that maximize water security, minimize operational cost, and minimize spills from reservoirs. The results of the optimization process are a number of operating options, comprising sets of operating rules that perform optimally in terms of the objectives. The range of operating rules and objective performance found in the optimization process allows the decision-maker to explore th...
- 1 October 2016
- Published by American Society of Civil Engineers (ASCE) in Journal of Water Resources Planning and Management
- Vol. 142 (10)
Using Multiobjective Optimization to Find Optimal Operating Rules for Short-Term Planning of Water Grids
Water grids are emerging as a means to address water scarcity in urban areas. These water grids are more complex than traditional supply systems, bringing new challenges to water-grid management. This paper seeks to address these challenges by demonstrating the capability of multiobjective optimization to aid in short-term operational planning for water grids. A framework for applying multiobjective optimization to short-term operational planning is demonstrated for a case study based on the South East Queensland Water Grid in Australia. The aim of the case study application is to find short-term (1 year) operating rules that maximize water security, minimize operational cost, and minimize spills from reservoirs. The results of the optimization process are a number of operating options, comprising sets of operating rules that perform optimally in terms of the objectives. The range of operating rules and objective performance found in the optimization process allows the decision-maker to explore th...
- 26 April 2014
- Published by Springer Nature in Water Resources Management
- Vol. 28 (8) , 2367-2380
A Framework for Short-term Operational Planning for Water Grids
- 26 April 2014
- Published by Springer Nature in Water Resources Management
- Vol. 28 (8) , 2367-2380
A Framework for Short-term Operational Planning for Water Grids
- 1 January 2013
- Published by IWA Publishing in Water Science & Technology
- Vol. 67 (2) , 446-451
Can stormwater harvesting restore pre-development flows in urban catchments in South East Queensland?
Increases in the impervious area due to urbanisation have been shown to have negative impacts on the physical and ecological condition of streams, primarily through increased volume and frequency of runoff. The harvesting and detention of runoff has a potential to decrease this impact. This paper describes the effects of urbanisation on catchment flow and of stormwater harvesting on reducing those adverse impacts on a stream in South East Queensland (SEQ), Australia. A largely undeveloped catchment located southeast of Brisbane city was calibrated and validated using the Stormwater Management Model (SWMM). This model was used to investigate the effect of a range of future increases in urbanisation (represented by impervious area) on stream hydrology as well as the potential of stormwater harvesting to return the catchments to predevelopment flow conditions. Stormwater harvesting was modelled according to flow frequency measures specified in current SEQ development guidelines. These guidelines stipulate the capture of the first 10 mm of runoff from impervious areas of 0–40% and the first 15 mm from impervious areas of 40% or greater for urban developments. We found that increases in the impervious area resulted in increases in the mean, frequency and duration of high flows, and an increase in the mean rate of rise and fall for storm events in the catchment. However, the predevelopment (non-urbanised) flow distribution was very flashy in comparison with all urbanised scenarios; i.e. it had the quickest response to rainfall indicated by a high rate of rise to and fall from peak flow volume, followed by a return to zero flow conditions. Capturing the runoff according to the development guidelines resulted in a reduction in flow towards the flow distribution of a lower impervious area, however this was insufficient to meet predevelopment conditions. This suggests a stronger influence of impervious areas in this catchment on the volume of runoff than flow frequency measures are able to ameliorate.
- 1 January 2013
- Published by IWA Publishing in Water Science & Technology
- Vol. 67 (2) , 446-451
Can stormwater harvesting restore pre-development flows in urban catchments in South East Queensland?
Increases in the impervious area due to urbanisation have been shown to have negative impacts on the physical and ecological condition of streams, primarily through increased volume and frequency of runoff. The harvesting and detention of runoff has a potential to decrease this impact. This paper describes the effects of urbanisation on catchment flow and of stormwater harvesting on reducing those adverse impacts on a stream in South East Queensland (SEQ), Australia. A largely undeveloped catchment located southeast of Brisbane city was calibrated and validated using the Stormwater Management Model (SWMM). This model was used to investigate the effect of a range of future increases in urbanisation (represented by impervious area) on stream hydrology as well as the potential of stormwater harvesting to return the catchments to predevelopment flow conditions. Stormwater harvesting was modelled according to flow frequency measures specified in current SEQ development guidelines. These guidelines stipulate the capture of the first 10 mm of runoff from impervious areas of 0–40% and the first 15 mm from impervious areas of 40% or greater for urban developments. We found that increases in the impervious area resulted in increases in the mean, frequency and duration of high flows, and an increase in the mean rate of rise and fall for storm events in the catchment. However, the predevelopment (non-urbanised) flow distribution was very flashy in comparison with all urbanised scenarios; i.e. it had the quickest response to rainfall indicated by a high rate of rise to and fall from peak flow volume, followed by a return to zero flow conditions. Capturing the runoff according to the development guidelines resulted in a reduction in flow towards the flow distribution of a lower impervious area, however this was insufficient to meet predevelopment conditions. This suggests a stronger influence of impervious areas in this catchment on the volume of runoff than flow frequency measures are able to ameliorate.
- 1 October 2009
- Published by Elsevier in Journal of Environmental Management
- Vol. 91 (1) , 222-226
Potential for rainwater use in high-rise buildings in Australian cities
- 1 October 2009
- Published by Elsevier in Journal of Environmental Management
- Vol. 91 (1) , 222-226
Potential for rainwater use in high-rise buildings in Australian cities