Jerome Ndam Mungwe
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Jerome Ndam Mungwe has a total of 11 co-authors. Here are the top co-authors by number of shared publications:
- Emanuela Colombo
Politecnico di Milano
2 shared publications - Njimboh Henry Alombah
Department of Electrical and Electronics Engineering, College of Technology, University of Bamenda, Bambili P.O. Box 39, Cameroon
2 shared publications - Ambe Harrison
Department of Electrical and Electronics Engineering, College of Technology (COT), University of Buea, Buea, Cameroon
1 shared publication - Andrea Schievano
European Commission (Brussels, Belgium)
1 shared publication Ayeah Nestor Chonain
Department of Electrical and Electronic Engineering, National Higher Polytechnic Institute (NAHPI), The University of Bamenda, Bambili, Cameroon
1 shared publication- Derek Ajesam Asoh
Univ Bamenda, Natl Higher Polytech Inst, Dept Elect & Elect Engn, POB 39, Bambili, North West, Cameroon
1 shared publication
Latest Publications
- Open Access
- 28 March 2024
- Published by Wiley in Journal of Renewable Energy
- Vol. 2024, 1-14
Technical Evaluation of Photovoltaic Systems in the Bamenda Municipality of the North West Region of Cameroon
In the Bamenda Municipality of Cameroon households are adopting Solar Photovoltaic Systems (SPVS). The penetration of SPVS in this Municipality depends on their technical performance. The study aimed to evaluate the technical installation of SPVS within the Municipality. A field inspection and administration of a questionnaire was conducted. The field inspection evaluated the respect of technical installation norms for SPVS. The questionnaire captured data on the technical situation of the SPVS. The SPVS installed included PV and grid to power separate loads, and PV and grid to power same loads. The installed loads were a mix of AC and DC loads of capacity from 360 W to 10000 W. The load powered by the installed SPVS varied from 300 W to 7000 W. The PV array varied from 200 W to 3200 W and battery bank capacity of 100 Ah to 800 Ah. The PV arrays were mostly installed on roof tops. Only 5% of the SPVS were installed by certified personnel. More than 50% of the installed SPVS operated below designed operation time. Failures in installed systems were related to inverters (36 %) and battery banks (36 %). Most of the PV arrays were installed on rooftops at tilt angles between 20° and 50°. More than 50 % of the PV arrays were oriented to directions other than South. Protective devices were installed in only 14 % of the installed systems. Some of the SPVS were not properly dimensioned. It may be concluded that most of the installed SPVS do not respect the technical installation norms and were not dimensioned according to users’ needs. The survival and penetration of SPVS technology in the Bamenda Municipality, Cameroon, and other sub-Saharan communities requires awareness and capacity building, policies, and regulations in the design and installation of this technology.
- 28 March 2024
- Published by Wiley in Journal of Renewable Energy
- Vol. 2024, 1-14
Open AccessTechnical Evaluation of Photovoltaic Systems in the Bamenda Municipality of the North West Region of Cameroon
In the Bamenda Municipality of Cameroon households are adopting Solar Photovoltaic Systems (SPVS). The penetration of SPVS in this Municipality depends on their technical performance. The study aimed to evaluate the technical installation of SPVS within the Municipality. A field inspection and administration of a questionnaire was conducted. The field inspection evaluated the respect of technical installation norms for SPVS. The questionnaire captured data on the technical situation of the SPVS. The SPVS installed included PV and grid to power separate loads, and PV and grid to power same loads. The installed loads were a mix of AC and DC loads of capacity from 360 W to 10000 W. The load powered by the installed SPVS varied from 300 W to 7000 W. The PV array varied from 200 W to 3200 W and battery bank capacity of 100 Ah to 800 Ah. The PV arrays were mostly installed on roof tops. Only 5% of the SPVS were installed by certified personnel. More than 50% of the installed SPVS operated below designed operation time. Failures in installed systems were related to inverters (36 %) and battery banks (36 %). Most of the PV arrays were installed on rooftops at tilt angles between 20° and 50°. More than 50 % of the PV arrays were oriented to directions other than South. Protective devices were installed in only 14 % of the installed systems. Some of the SPVS were not properly dimensioned. It may be concluded that most of the installed SPVS do not respect the technical installation norms and were not dimensioned according to users’ needs. The survival and penetration of SPVS technology in the Bamenda Municipality, Cameroon, and other sub-Saharan communities requires awareness and capacity building, policies, and regulations in the design and installation of this technology.
- Open Access
- 26 October 2023
- Published by MDPI AG in Engineering Proceedings
- Vol. 56 (1) , 34
Trio-PV Monitor: A Smart IoT-Based Instrument for Continuous and Reliable Monitoring of Solar PV Installations
This paper introduces a Trio-PV monitor: a smart IoT-based instrument for the continuous and accurate monitoring of solar PV systems. The instrument is a synergistic combination of electronic hardware, desktop applications and a website. It has been conceived to provide monitoring, storage, and sharing as well as to perform statistical operations on solar energy-related data collected at any chosen site. The instrument features high flexibility, with the capacity of monitoring PV plants of up to a 90 kW rating. It is intentionally equipped with large-range weather-proof sensors, permitting monitoring and evaluation across different seasons and geographical areas. The proposed instrument targets six keys operating variables of a PV systems, namely irradiance, panel-temperature, ambient temperature, humidity, PV current and voltage. The automated design of the Trio-PV monitor allows for continuous operation for 12 h within a day. The instrument has been used to monitor simple 30 W solar PV-DC connected systems, with acquired results revealing it practical suitability and soundness. The friendly user interface of the system allows a graphical visualization of monitored parameters in real time through an installed desktop application. Finally, the IoT competence of the proposed instrument extensively allows data acquisition and the monitoring of a PV system from any location in the world. It is envisioned that the developed instrument would be a leverage package for data acquisition and the monitoring of PV system installations in developing countries and especially in Cameroon where access to information on PV systems is still highly costly and unreliable.
- 26 October 2023
- Published by MDPI AG in Engineering Proceedings
- Vol. 56 (1) , 34
Open AccessTrio-PV Monitor: A Smart IoT-Based Instrument for Continuous and Reliable Monitoring of Solar PV Installations
This paper introduces a Trio-PV monitor: a smart IoT-based instrument for the continuous and accurate monitoring of solar PV systems. The instrument is a synergistic combination of electronic hardware, desktop applications and a website. It has been conceived to provide monitoring, storage, and sharing as well as to perform statistical operations on solar energy-related data collected at any chosen site. The instrument features high flexibility, with the capacity of monitoring PV plants of up to a 90 kW rating. It is intentionally equipped with large-range weather-proof sensors, permitting monitoring and evaluation across different seasons and geographical areas. The proposed instrument targets six keys operating variables of a PV systems, namely irradiance, panel-temperature, ambient temperature, humidity, PV current and voltage. The automated design of the Trio-PV monitor allows for continuous operation for 12 h within a day. The instrument has been used to monitor simple 30 W solar PV-DC connected systems, with acquired results revealing it practical suitability and soundness. The friendly user interface of the system allows a graphical visualization of monitored parameters in real time through an installed desktop application. Finally, the IoT competence of the proposed instrument extensively allows data acquisition and the monitoring of a PV system from any location in the world. It is envisioned that the developed instrument would be a leverage package for data acquisition and the monitoring of PV system installations in developing countries and especially in Cameroon where access to information on PV systems is still highly costly and unreliable.
- 1 December 2016
- Published by Elsevier in Biomass and Bioenergy
- Vol. 95, 35-44
The fixed dome digester: An appropriate design for the context of Sub-Sahara Africa?
- 1 December 2016
- Published by Elsevier in Biomass and Bioenergy
- Vol. 95, 35-44
The fixed dome digester: An appropriate design for the context of Sub-Sahara Africa?
- Open Access
- 1 January 2016
- Published by American Institute of Mathematical Sciences (AIMS) in AIMS Energy
- Vol. 4 (1) , 190-205
Community pico and micro hydropower for rural electrification: experiences from the mountain regions of Cameroon
Less than 15% of rural areas of Cameroon have access to grid electricity. Only 53% of the population has access to grid electricity. Notwithstanding, Cameroon has a huge hydropower potential which could be harnessed. Mini grids, powered by pico and micro hydropower plants, are a relatively new rural electrification strategy in Cameroon. Several of such mini grids have been realized in the mountain regions of the country. Some of these systems have been more successful than others. This paper aims to share the experiences of community-based pico and micro hydropower schemes for rural electrification in Cameroon. The paper provides insight to the challenges that three of such mini grid systems powered by pico and micro hydropower plants had encountered and it attempts to identify issues related to their performances. The study was based on personal experience, field visits, participant observations, interviews and focus group discussions with key members of the beneficiary communities and documentations from the local NGO which implemented the schemes. Key findings of this study relate to the description of the main aspects about: planning of a robust system design, organizational aspects, like social cohesion at all levels of scheme management, community leadership and ownership of the system and involvement of the beneficiaries at all stages of the project cycle. These aspects were particularly addressed within the context of rural communities in Cameroon.
- 1 January 2016
- Published by American Institute of Mathematical Sciences (AIMS) in AIMS Energy
- Vol. 4 (1) , 190-205
Open AccessCommunity pico and micro hydropower for rural electrification: experiences from the mountain regions of Cameroon
Less than 15% of rural areas of Cameroon have access to grid electricity. Only 53% of the population has access to grid electricity. Notwithstanding, Cameroon has a huge hydropower potential which could be harnessed. Mini grids, powered by pico and micro hydropower plants, are a relatively new rural electrification strategy in Cameroon. Several of such mini grids have been realized in the mountain regions of the country. Some of these systems have been more successful than others. This paper aims to share the experiences of community-based pico and micro hydropower schemes for rural electrification in Cameroon. The paper provides insight to the challenges that three of such mini grid systems powered by pico and micro hydropower plants had encountered and it attempts to identify issues related to their performances. The study was based on personal experience, field visits, participant observations, interviews and focus group discussions with key members of the beneficiary communities and documentations from the local NGO which implemented the schemes. Key findings of this study relate to the description of the main aspects about: planning of a robust system design, organizational aspects, like social cohesion at all levels of scheme management, community leadership and ownership of the system and involvement of the beneficiaries at all stages of the project cycle. These aspects were particularly addressed within the context of rural communities in Cameroon.