Bohyung Paeng
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Bohyung Paeng has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Inbeom Park
Department of Industrial Engineering and Institute for Industrial Systems Innovation, Seoul National University, 1 Gwanak-ro, Gwanak-gu, Seoul 151-744, Korea
1 shared publication - Jaeseok Huh
Department of Industrial and Information Systems Engineering, Soongsil University, Seoul 06978, Republic of Korea
1 shared publication - Jonghun Park
Seoul National University, Seoul, Republic of Korea
1 shared publication - Kwanho Kim
Department of Industrial and Systems Engineering, Dongguk University, Seoul 04620, Republic of Korea
1 shared publication - Seongmin Lim
Department of Industrial Engineering and Institute for Industrial Systems Innovation, Seoul National University, 1 Gwanak-ro, Gwanak-gu, Seoul 151-744, Korea
1 shared publication
Latest Publications
- Open Access
- 9 November 2018
- Published by MDPI AG in Sustainability
- Vol. 10 (11) , 4123
Learning to Dispatch Operations with Intentional Delay for Re-Entrant Multiple-Chip Product Assembly Lines
As the demand for small devices with embedded flash memory increases, semiconductor manufacturers have been recently focusing on producing high-capacity multiple-chip products (MCPs). Due to the frequently re-entrant lots between the die attach (DA) and wire bonding (WB) assembly stages in MCP production, increased flow time and decreased resource utilization are unavoidable. In this paper, we propose a dispatcher based on artificial neural networks, which minimizes the flow time while maintaining high utilization of resources at the same time through exploiting the possible intentional delays on DA stage. Specifically, the proposed dispatcher learns the assignment preferences between available lots and DA resources based on assembly line data generated by using a simulator, then the proposed dispatcher performs lot dispatching decisions by considering the intentional delays. The numerical experiments were performed under various configurations of the MCP assembly lines, and the results show that the proposed dispatcher outperformed the existing methods.
- 9 November 2018
- Published by MDPI AG in Sustainability
- Vol. 10 (11) , 4123
Open AccessLearning to Dispatch Operations with Intentional Delay for Re-Entrant Multiple-Chip Product Assembly Lines
As the demand for small devices with embedded flash memory increases, semiconductor manufacturers have been recently focusing on producing high-capacity multiple-chip products (MCPs). Due to the frequently re-entrant lots between the die attach (DA) and wire bonding (WB) assembly stages in MCP production, increased flow time and decreased resource utilization are unavoidable. In this paper, we propose a dispatcher based on artificial neural networks, which minimizes the flow time while maintaining high utilization of resources at the same time through exploiting the possible intentional delays on DA stage. Specifically, the proposed dispatcher learns the assignment preferences between available lots and DA resources based on assembly line data generated by using a simulator, then the proposed dispatcher performs lot dispatching decisions by considering the intentional delays. The numerical experiments were performed under various configurations of the MCP assembly lines, and the results show that the proposed dispatcher outperformed the existing methods.