Andi Cakravastia
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Andi Cakravastia has a total of 28 co-authors. Here are the top co-authors by number of shared publications:
- Senator Nur Bahagia
Bandung Institute of Technology
4 shared publications - T. M. A. Ari Samadhi
Bandung Institute of Technology
3 shared publications - Bermawi Priyatna Iskandar
Industrial Engineering Department, Faculty of Industrial Technology, Bandung Institute of Technology, Bandung 40132, Indonesia
2 shared publications Lucia Diawati
Department of Industrial Engineering Bandung Institute of Technology Indonesia
2 shared publicationsAbdul Hakim Halim
1 shared publication- Abdul Hakim Halim
Fakultas Teknologi Industri, Program Studi Teknik Industri, Institut Teknologi Bandung
1 shared publication
Latest Publications
- 6 June 2024
- Published by Springer Nature in Journal of Intelligent Manufacturing
- Vol. 36 (6) , 3801-3815
Unsupervised exceptional human action detection from repetition of human assembling tasks using entropy signal clustering
- 6 June 2024
- Published by Springer Nature in Journal of Intelligent Manufacturing
- Vol. 36 (6) , 3801-3815
Unsupervised exceptional human action detection from repetition of human assembling tasks using entropy signal clustering
- Open Access
- 17 September 2020
- Published by Omnia Publisher SL in Journal of Industrial Engineering and Management
- Vol. 13 (3) , 546-564
A flow shop batch scheduling and operator assignment model with time-changing effects of learning and forgetting to minimize total actual flow time
Purpose: This paper aims to investigate simultaneous problems of batch scheduling and operator assignment with time-changing effects caused by learning and forgetting. Design/methodology/approach: A number of parts will be processed in batches, each of which will be processed through a number of operations where there are alternative operators for each operation bringing different set up and processing times as operators experience different degree of learning and forgetting. A mathematical model is developed for the problems, and the decision variables are operator assignment, the number of batches, batch sizes and the schedule of the resulting batches. A proposed algorithm works by trying different number of batches, starting from one, and increasing the number of batches one by one until the objective function value does not improve anymore. Findings: We show both mathematically and numerically that the closest batch to the due date always becomes the largest batch in the schedule, and the faster operators learn, the larger the difference between the closest batch to the due date and the other batches, the lower optimal number of batches, and the lower the total actual flow time. Originality/value: Previous papers have considered the existence of alternative operators but have not considered learning and forgetting, or have considered learning and forgetting but only in a single-stage system and without considering alternative operators.
- 17 September 2020
- Published by Omnia Publisher SL in Journal of Industrial Engineering and Management
- Vol. 13 (3) , 546-564
Open AccessA flow shop batch scheduling and operator assignment model with time-changing effects of learning and forgetting to minimize total actual flow time
Purpose: This paper aims to investigate simultaneous problems of batch scheduling and operator assignment with time-changing effects caused by learning and forgetting. Design/methodology/approach: A number of parts will be processed in batches, each of which will be processed through a number of operations where there are alternative operators for each operation bringing different set up and processing times as operators experience different degree of learning and forgetting. A mathematical model is developed for the problems, and the decision variables are operator assignment, the number of batches, batch sizes and the schedule of the resulting batches. A proposed algorithm works by trying different number of batches, starting from one, and increasing the number of batches one by one until the objective function value does not improve anymore. Findings: We show both mathematically and numerically that the closest batch to the due date always becomes the largest batch in the schedule, and the faster operators learn, the larger the difference between the closest batch to the due date and the other batches, the lower optimal number of batches, and the lower the total actual flow time. Originality/value: Previous papers have considered the existence of alternative operators but have not considered learning and forgetting, or have considered learning and forgetting but only in a single-stage system and without considering alternative operators.
- 27 October 2019
- Published by Springer Nature
- p. 355-361
Nash Game Theory Leasing Contract Model of New and Recondition Complex Equipment
- 27 October 2019
- Published by Springer Nature
- p. 355-361
Nash Game Theory Leasing Contract Model of New and Recondition Complex Equipment
- 27 October 2019
- Published by Springer Nature
- p. 24-29
Optimal Down-Time Target for Performance Based Remanufactured Lease Contract
- 27 October 2019
- Published by Springer Nature
- p. 24-29
Optimal Down-Time Target for Performance Based Remanufactured Lease Contract
- Open Access
- 24 September 2018
- Published by Omnia Publisher SL in Journal of Industrial Engineering and Management
- Vol. 11 (4) , 776-793
Coordination model in Hinterland chain of hub-and-spoke global logistics
Purpose: The purpose of this research is to develop an inter-organizational model of coordination in hinterland chain of hub-and-spoke in global logistics, where dryport works as a spoke and seaport as a hub.Design/methodology/approach: The model built will define a conceptual model in order to coordinate several actors involved in handling the flow of goods and the flow of information (documents) in exporting goods via dryport, where their activities are interdependence. Therefore the first step was to investigate an existing business process of export system via dryport. Value Stream Mapping (VSM) is used to identify bottleneck in existing system and simplify the process. The third step was benchmarking coordination in selected country that have similarity of hinterland characteristics with Indonesia (archipelago country), and exporting agricultural or animal products. After that several alternatives conceptual model of coordination will be proposed, of which the development based on inter-organizational system (IOS) approach. The model is then evaluated by experts to choose the best conceptual model of coordination that suits the real system, especially in Indonesia. The choosen model then being validated by developing simulation using agent-based approach and discrete-event simulation.Findings: The findings of this research is coordination mechanism in export process. There are two basic mechanisms in document preparation, three basic mechanisms in quarantine inspection, and three basic mechanisms in inland transportation and handling. The proposed model using a single connection and single submission to handling coordination among actors.Originality/value: The paper provide coordination of inter-organizational system among involved actors in handling physical flow of goods and flow of information (documents) in arranging exporting goods via dryport (hub-and-spoke typology). Moreover, scope of research is hinterland (outside seaport) with coordination that considering flow of information in hub-and-spoke concept was rarely done by other researchers.
- 24 September 2018
- Published by Omnia Publisher SL in Journal of Industrial Engineering and Management
- Vol. 11 (4) , 776-793
Open AccessCoordination model in Hinterland chain of hub-and-spoke global logistics
Purpose: The purpose of this research is to develop an inter-organizational model of coordination in hinterland chain of hub-and-spoke in global logistics, where dryport works as a spoke and seaport as a hub.Design/methodology/approach: The model built will define a conceptual model in order to coordinate several actors involved in handling the flow of goods and the flow of information (documents) in exporting goods via dryport, where their activities are interdependence. Therefore the first step was to investigate an existing business process of export system via dryport. Value Stream Mapping (VSM) is used to identify bottleneck in existing system and simplify the process. The third step was benchmarking coordination in selected country that have similarity of hinterland characteristics with Indonesia (archipelago country), and exporting agricultural or animal products. After that several alternatives conceptual model of coordination will be proposed, of which the development based on inter-organizational system (IOS) approach. The model is then evaluated by experts to choose the best conceptual model of coordination that suits the real system, especially in Indonesia. The choosen model then being validated by developing simulation using agent-based approach and discrete-event simulation.Findings: The findings of this research is coordination mechanism in export process. There are two basic mechanisms in document preparation, three basic mechanisms in quarantine inspection, and three basic mechanisms in inland transportation and handling. The proposed model using a single connection and single submission to handling coordination among actors.Originality/value: The paper provide coordination of inter-organizational system among involved actors in handling physical flow of goods and flow of information (documents) in arranging exporting goods via dryport (hub-and-spoke typology). Moreover, scope of research is hinterland (outside seaport) with coordination that considering flow of information in hub-and-spoke concept was rarely done by other researchers.
- Open Access
- 29 September 2017
- Published by EDP Sciences in MATEC Web of Conferences
- Vol. 124, 08002
Freezing issue on stability master production scheduling for supplier network: Decision making view
MATEC Web of Conferences, open access proceedings in Materials science, Engineering and Chemistry
- 29 September 2017
- Published by EDP Sciences in MATEC Web of Conferences
- Vol. 124, 08002
Open AccessFreezing issue on stability master production scheduling for supplier network: Decision making view
MATEC Web of Conferences, open access proceedings in Materials science, Engineering and Chemistry
- 21 May 2015
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 54 (4) , 1170-1185
A batch scheduling model formheterogeneous batch processor
- 21 May 2015
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 54 (4) , 1170-1185
A batch scheduling model formheterogeneous batch processor
- Open Access
- 21 June 2012
- Published by Omnia Publisher SL in Journal of Industrial Engineering and Management
- Vol. 5 (1) , 198-228
A conceptual assessment model to identify phase of industrial cluster life cycle in Indonesia
Purpose: The purpose of this research is to develop an assessment model to identify phase of industrial cluster life cycle which comprises definition of the cycle phases, identification of assessment components, and characterization of each phase of cluster life cycle. Design/methodology/approach: This research uses the Delphi method to develop the conceptual model i.e. define phases of cluster life cycle and identify assessment components, and design typology of cluster life cycle. Findings: The proposed indicators used to assess industrial cluster phases are (i) concentration of industry, (ii) market accessibility, (iii) completeness of actors, and (iv) collaboration of stakeholders. Research limitations/implications: This study developed a conceptual model based on expert opinion in Indonesia. Given the limitations of experts in this field in Indonesia, it is necessary to develop advanced research involving more experts and if possible, to involve experts outside Indonesia. Practical implications: This paper provides an assessment conceptual model to identify phase of industrial cluster life cycle. The objective of assessing industrial cluster phases is to evaluate and improve the condition of industrial clusters and as basis for formulation policy interventions in accordance with each phase of cluster life cycle. The final results of this study are the position of each cluster on their life cycle, which reflects the condition of each industrial cluster. On a practical level, the assessment result could be used to improve the competitiveness of industrial sectors and help local and central government to formulate appropriate policy interventions. Originality/value: The paper provides an assessment conceptual model to identify phases of industrial cluster life cycle, which include definition phases, assessment components and typology of each phase of cluster life cycle based on assessment criteria. Research in this field was rarely done by the other researchers.
- 21 June 2012
- Published by Omnia Publisher SL in Journal of Industrial Engineering and Management
- Vol. 5 (1) , 198-228
Open AccessA conceptual assessment model to identify phase of industrial cluster life cycle in Indonesia
Purpose: The purpose of this research is to develop an assessment model to identify phase of industrial cluster life cycle which comprises definition of the cycle phases, identification of assessment components, and characterization of each phase of cluster life cycle. Design/methodology/approach: This research uses the Delphi method to develop the conceptual model i.e. define phases of cluster life cycle and identify assessment components, and design typology of cluster life cycle. Findings: The proposed indicators used to assess industrial cluster phases are (i) concentration of industry, (ii) market accessibility, (iii) completeness of actors, and (iv) collaboration of stakeholders. Research limitations/implications: This study developed a conceptual model based on expert opinion in Indonesia. Given the limitations of experts in this field in Indonesia, it is necessary to develop advanced research involving more experts and if possible, to involve experts outside Indonesia. Practical implications: This paper provides an assessment conceptual model to identify phase of industrial cluster life cycle. The objective of assessing industrial cluster phases is to evaluate and improve the condition of industrial clusters and as basis for formulation policy interventions in accordance with each phase of cluster life cycle. The final results of this study are the position of each cluster on their life cycle, which reflects the condition of each industrial cluster. On a practical level, the assessment result could be used to improve the competitiveness of industrial sectors and help local and central government to formulate appropriate policy interventions. Originality/value: The paper provides an assessment conceptual model to identify phases of industrial cluster life cycle, which include definition phases, assessment components and typology of each phase of cluster life cycle based on assessment criteria. Research in this field was rarely done by the other researchers.
- 1 January 2012
- Published by The Institute for Research and Community Services (LPPM) ITB in ITB Journal of Engineering Science
- Vol. 44 (2) , 128-148
A Buffer Stock Model to Ensure Price Stabilization and Availability of Seasonal Staple Foods under Free Trade Considerations
The price volatility and scarcity have been became a great problem in the distribution system of seasonal staple food produced by agro industry. It has salient supply disparity during the harvest and planting season. This condition could cause disadvantages to the stakeholders such as producer, wholesaler, consumer, and government. This paper proposes a buffer stock model under free trade considerations to substitute quantitative restrictions and tariffs by indirect market intervention instrument. The instrument was developed through buffer stock scheme in accordance with warehouse receipt system (WRS) and collateral management system. The public service institution for staple food buffer stock (BLUPP) is proposed as wholesaler’s competitor with main responsibility to ensure price stabilization and availability of staple food. Multi criteria decision making is formulated as single objective a mixed integer non linear programming (MINLP). The result shows that the proposed model can be applied to solve the distribution problem and can give more promising outcome than its counterpart, the direct market intervention instrument
- 1 January 2012
- Published by The Institute for Research and Community Services (LPPM) ITB in ITB Journal of Engineering Science
- Vol. 44 (2) , 128-148
A Buffer Stock Model to Ensure Price Stabilization and Availability of Seasonal Staple Foods under Free Trade Considerations
The price volatility and scarcity have been became a great problem in the distribution system of seasonal staple food produced by agro industry. It has salient supply disparity during the harvest and planting season. This condition could cause disadvantages to the stakeholders such as producer, wholesaler, consumer, and government. This paper proposes a buffer stock model under free trade considerations to substitute quantitative restrictions and tariffs by indirect market intervention instrument. The instrument was developed through buffer stock scheme in accordance with warehouse receipt system (WRS) and collateral management system. The public service institution for staple food buffer stock (BLUPP) is proposed as wholesaler’s competitor with main responsibility to ensure price stabilization and availability of staple food. Multi criteria decision making is formulated as single objective a mixed integer non linear programming (MINLP). The result shows that the proposed model can be applied to solve the distribution problem and can give more promising outcome than its counterpart, the direct market intervention instrument
- 1 June 2011
- Published by Korean Institute of Industrial Engineers in Industrial Engineering & Management Systems
- Vol. 10 (2) , 97-103
Quantifying the Technology Level of Production System for Technology Transfer
Quantifying the Technology Level of Production System for Technology Transfer Technology Transfer;Technology Level;Learning Curve;S-curve;Case Study; This paper develops a technology level quantification (TLQ) model by utilizing a learning curve. Original learning curve shows the relationship between cumulative number of units and the required time for the unit. On the other hand, in our developed model, the technology level, such as speed of production and quality of the produced items, is expressed as a function of not cumulative number of units but time, for increasing generality. Furthermore, for expressing each learning that consists of conceptual learning and operational learning, S-curve is utilized in our developed model. By fitting the S-curve and/or decomposing into some activities, our TQL model can be applied to approximate organizational and complicated process. Some variations in time and levels, parameters of our developed model are shown. By using the parameters, the procedure to identify our developed model is proposed. Also, the influential factors for the parameters of our developed model are discussed with classifying the factors into technoware, infoware, humanware, and orgaware. The expected technology level is utilized for expecting the capacity of production system, and the expected capacity can be utilized in predicting various changes in the organization and deciding managerial decision about TT. A case study in manufacturing industry shows the effectiveness of the developed model.
- 1 June 2011
- Published by Korean Institute of Industrial Engineers in Industrial Engineering & Management Systems
- Vol. 10 (2) , 97-103
Quantifying the Technology Level of Production System for Technology Transfer
Quantifying the Technology Level of Production System for Technology Transfer Technology Transfer;Technology Level;Learning Curve;S-curve;Case Study; This paper develops a technology level quantification (TLQ) model by utilizing a learning curve. Original learning curve shows the relationship between cumulative number of units and the required time for the unit. On the other hand, in our developed model, the technology level, such as speed of production and quality of the produced items, is expressed as a function of not cumulative number of units but time, for increasing generality. Furthermore, for expressing each learning that consists of conceptual learning and operational learning, S-curve is utilized in our developed model. By fitting the S-curve and/or decomposing into some activities, our TQL model can be applied to approximate organizational and complicated process. Some variations in time and levels, parameters of our developed model are shown. By using the parameters, the procedure to identify our developed model is proposed. Also, the influential factors for the parameters of our developed model are discussed with classifying the factors into technoware, infoware, humanware, and orgaware. The expected technology level is utilized for expecting the capacity of production system, and the expected capacity can be utilized in predicting various changes in the organization and deciding managerial decision about TT. A case study in manufacturing industry shows the effectiveness of the developed model.