Xu Zhang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Xu Zhang has a total of 47 co-authors. Here are the top co-authors by number of shared publications:
Youjun Xu
6 shared publications- Chengping Zhang
Key Laboratory of Urban Underground Engineering of the Education Ministry, Beijing Jiaotong University, Beijing, China
4 shared publications - Jun He
Shenzhen Metro Group Co., Ltd., Shenzhen 518026, China
3 shared publications - Bo Min
Key Laboratory of Urban Underground Engineering of Ministry of Education, Beijing Jiaotong University, Beijing 100044, China
2 shared publications Hao Qu
2 shared publicationsHongxu Fu
2 shared publications
Latest Publications
- Open Access
Research on Mechanical Characteristics of Portal Frame Anti-Uplift Structure
The complexity of the loading mode and action mechanism is demonstrated in the portal frame anti-uplift structure. The stress evolution process of the portal frame structure during the excavation of the upper foundation pit is revealed through in situ structural stress tests and numerical modeling analysis reflecting the small strain characteristics of stratum. The stress distribution of uplift piles and anti-floating plates is analyzed, with the axial force of piles and the development law of bending moment in plates being specifically examined. It is emphasized that the load of the uplift pile is generated by friction between the pile and soil caused by stratum floating, which is predominantly produced during the excavation of the upper block and the unloading of the surcharge. The pile 11# is observed to be under tension in the middle and compressed at both ends, with the extreme value of tensile stress of these 24 piles being located at 0.15 times the pile length below the top of the middle pile. The main loads of the anti-floating plate are identified as backfilling, foundation buoyancy, and lateral soil pressure. The lower part of the two pile spans is subjected to tension, while the upper part is under compression, with the bending moment extremes being located on the side where the frame is first formed. A significant increase in stiffness is exhibited by the frame structure after its formation, and the influence from the excavation of other blocks is markedly reduced. The most adverse condition is determined to occur during the integral removal of the upper surcharge. The reference value of these research results is confirmed for clarifying the stress mechanism of anti-uplift portal frame structures and optimizing key technical parameters in structural design and construction.
Open AccessResearch on Mechanical Characteristics of Portal Frame Anti-Uplift Structure
The complexity of the loading mode and action mechanism is demonstrated in the portal frame anti-uplift structure. The stress evolution process of the portal frame structure during the excavation of the upper foundation pit is revealed through in situ structural stress tests and numerical modeling analysis reflecting the small strain characteristics of stratum. The stress distribution of uplift piles and anti-floating plates is analyzed, with the axial force of piles and the development law of bending moment in plates being specifically examined. It is emphasized that the load of the uplift pile is generated by friction between the pile and soil caused by stratum floating, which is predominantly produced during the excavation of the upper block and the unloading of the surcharge. The pile 11# is observed to be under tension in the middle and compressed at both ends, with the extreme value of tensile stress of these 24 piles being located at 0.15 times the pile length below the top of the middle pile. The main loads of the anti-floating plate are identified as backfilling, foundation buoyancy, and lateral soil pressure. The lower part of the two pile spans is subjected to tension, while the upper part is under compression, with the bending moment extremes being located on the side where the frame is first formed. A significant increase in stiffness is exhibited by the frame structure after its formation, and the influence from the excavation of other blocks is markedly reduced. The most adverse condition is determined to occur during the integral removal of the upper surcharge. The reference value of these research results is confirmed for clarifying the stress mechanism of anti-uplift portal frame structures and optimizing key technical parameters in structural design and construction.
- Open Access
Upper Shallow Foundation Pit Engineering: Utilization and Evaluation of Portal Frame Anti-Heave Structures
The excavation of upper shallow foundation pits may cause the uneven deformation of existing tunnels buried below a shallow depth. Improper control measures may lead to a series of diseases, such as local cracking or breakage of the tunnel lining, which threaten the safety of tunnel operations. Regarding the safety of the existing tunnel affected by the construction of the foundation pit, cases of the application of portal frame anti-heave structures in upper foundation pit projects of existing tunnels in Shenzhen have been documented, and the main influencing factors have been analyzed and summarized. Taking the Qianhai Ring Water Corridor Project as an example, numerical orthogonal experiments were conducted to analyze the deformation response patterns in the depth of existing tunnels and the effectiveness of control measures in the upper shallow of foundation pit engineering. The roles of portal frame anti-heave structures are analyzed in detail using measured data. Studies indicate that the deformation of the existing tunnels mainly occurs during the top and immediately adjacent block excavation stages, and stabilizes after the uplift-resisting piles and anti-floating slabs form an effective frame structure. The portal frame anti-heave structures, combined with measures such as block excavation, jet grouting interlocking reinforcement, backfilling, and surcharge loading, have extremely strong deformation control capabilities. However, the construction costs are relatively high, leaving room for optimization.
Open AccessUpper Shallow Foundation Pit Engineering: Utilization and Evaluation of Portal Frame Anti-Heave Structures
The excavation of upper shallow foundation pits may cause the uneven deformation of existing tunnels buried below a shallow depth. Improper control measures may lead to a series of diseases, such as local cracking or breakage of the tunnel lining, which threaten the safety of tunnel operations. Regarding the safety of the existing tunnel affected by the construction of the foundation pit, cases of the application of portal frame anti-heave structures in upper foundation pit projects of existing tunnels in Shenzhen have been documented, and the main influencing factors have been analyzed and summarized. Taking the Qianhai Ring Water Corridor Project as an example, numerical orthogonal experiments were conducted to analyze the deformation response patterns in the depth of existing tunnels and the effectiveness of control measures in the upper shallow of foundation pit engineering. The roles of portal frame anti-heave structures are analyzed in detail using measured data. Studies indicate that the deformation of the existing tunnels mainly occurs during the top and immediately adjacent block excavation stages, and stabilizes after the uplift-resisting piles and anti-floating slabs form an effective frame structure. The portal frame anti-heave structures, combined with measures such as block excavation, jet grouting interlocking reinforcement, backfilling, and surcharge loading, have extremely strong deformation control capabilities. However, the construction costs are relatively high, leaving room for optimization.
- Open Access
Bending Performance of F-Type Socket Joints for Rectangular Pipe Jacking Tunnels with Longitudinal Connectors
Joints are the weakest part of rectangular pipe jacking tunnels, and the structural form of the joint is closely related to its bending resistance. In this work, the F-type socket joint of a rectangular pipe jacking tunnel is selected as the object of study. The bending mechanical properties of the joints connected by steel screws and those connected by bent bolts are compared via a three-point bending test. The results show that the two longitudinal connection joints have similar bending stiffnesses. Compared with the bent bolt connection joint, the steel screw connection joint has better toughness, and the load at which the joint enters the plastic stage and the bearing capacity are increased by 0.47 times and 1.02 times, respectively. The failure modes of the joints connected by steel screw connections and those connected by bent bolts are crushing of the concrete of the top plate and cracking of the concrete above the screw holes, respectively. When a bent bolt connection is used, the reinforcement at the screw hole should be locally strengthened, or ultrahigh-performance concrete (UHPC) should be used at the screw hole to improve the load-bearing capacity of the joint.
Open AccessBending Performance of F-Type Socket Joints for Rectangular Pipe Jacking Tunnels with Longitudinal Connectors
Joints are the weakest part of rectangular pipe jacking tunnels, and the structural form of the joint is closely related to its bending resistance. In this work, the F-type socket joint of a rectangular pipe jacking tunnel is selected as the object of study. The bending mechanical properties of the joints connected by steel screws and those connected by bent bolts are compared via a three-point bending test. The results show that the two longitudinal connection joints have similar bending stiffnesses. Compared with the bent bolt connection joint, the steel screw connection joint has better toughness, and the load at which the joint enters the plastic stage and the bearing capacity are increased by 0.47 times and 1.02 times, respectively. The failure modes of the joints connected by steel screw connections and those connected by bent bolts are crushing of the concrete of the top plate and cracking of the concrete above the screw holes, respectively. When a bent bolt connection is used, the reinforcement at the screw hole should be locally strengthened, or ultrahigh-performance concrete (UHPC) should be used at the screw hole to improve the load-bearing capacity of the joint.
- Open Access
- 25 September 2024
- Published by Elsevier in Alexandria Engineering Journal
- Vol. 108, 863-877
Performance of an operational shield tunnel due to construction of a large cross-sectional straight-walled arch tunnel above-crossing
- 25 September 2024
- Published by Elsevier in Alexandria Engineering Journal
- Vol. 108, 863-877
Open AccessPerformance of an operational shield tunnel due to construction of a large cross-sectional straight-walled arch tunnel above-crossing
- 17 August 2024
- Published by Elsevier in Applied Mathematical Modelling
- Vol. 136
Mathematical modelling for strata deformation caused by rectangular pipe jacking construction in composite layered ground
- 17 August 2024
- Published by Elsevier in Applied Mathematical Modelling
- Vol. 136
Mathematical modelling for strata deformation caused by rectangular pipe jacking construction in composite layered ground
- 22 February 2024
- Published by Elsevier in Engineering Failure Analysis
- Vol. 160
Investigating the damage to masonry buildings during shield tunneling: A case study in Hohhot Metro
- 22 February 2024
- Published by Elsevier in Engineering Failure Analysis
- Vol. 160
Investigating the damage to masonry buildings during shield tunneling: A case study in Hohhot Metro
- 5 January 2024
- Published by Taylor & Francis in Journal of the Chinese Institute of Engineers
- Vol. 47 (2) , 192-203
Subway station construction parallelly below existing double-cell tunnel without clearance
- 5 January 2024
- Published by Taylor & Francis in Journal of the Chinese Institute of Engineers
- Vol. 47 (2) , 192-203
Subway station construction parallelly below existing double-cell tunnel without clearance
- Open Access
- 11 December 2023
- Published by Wiley in Deep Underground Science and Engineering
- Vol. 3 (4) , 481-496
Case study of performance assessment of overlapping shield tunnels with a small curve radius
Due to the network planning of subways and their surrounding structures, increasingly more overlapping shields with a small curve radius have been constructed. A newly constructed upper tunnel partly overlaps a lower one, leading to the extremely complex uplift of the lower tunnel caused by the construction of a new tunnel. Based on the shield‐driven project that runs from the Qinghe Xiaoyingqiao Station to the Qinghe Station in Beijing, which adopts the reinforcement measures of interlayer soil grouting and steel supports on site, in this study, the uplift pattern of the lower tunnel and the stress characteristics of steel supports were investigated through numerical simulations and on‐site monitoring. The study results show that among all tunnel segments, the first segment of the shield witnesses a maximum uplift displacement that increases with the horizontal space between tunnels. On using either interlayer soil grouting or steel‐ring bracing reinforcement, the uplift of the tunnel lining exceeds the control value; by contrast, when these two measures are jointly applied, the uplift of the tunnel lining does not exceed a maximum value of 4.87 mm, which can satisfy the requirements of deformation control. Under these two joint measures, the soil strength between two stacked shield tunnels can be enhanced and the uplift deformation can be restricted with the interlayer soil grouting. Also, the segmental deformation and overall stability of the existing tunnel can be controlled with the temporary steel supports. The deformation of circumferential supports and segments is closely related to each other, and the segmental uplift is controlled by H‐shaped steel supports. With the increase in the horizontal space between twin shields, the effect of the construction would gradually weaken, accompanied by a gradual reduction of the stresses of steel supports. These findings provide a valuable reference for the engineering design and safe construction of overlapping shield tunnels with a small curve radius.
- 11 December 2023
- Published by Wiley in Deep Underground Science and Engineering
- Vol. 3 (4) , 481-496
Open AccessCase study of performance assessment of overlapping shield tunnels with a small curve radius
Due to the network planning of subways and their surrounding structures, increasingly more overlapping shields with a small curve radius have been constructed. A newly constructed upper tunnel partly overlaps a lower one, leading to the extremely complex uplift of the lower tunnel caused by the construction of a new tunnel. Based on the shield‐driven project that runs from the Qinghe Xiaoyingqiao Station to the Qinghe Station in Beijing, which adopts the reinforcement measures of interlayer soil grouting and steel supports on site, in this study, the uplift pattern of the lower tunnel and the stress characteristics of steel supports were investigated through numerical simulations and on‐site monitoring. The study results show that among all tunnel segments, the first segment of the shield witnesses a maximum uplift displacement that increases with the horizontal space between tunnels. On using either interlayer soil grouting or steel‐ring bracing reinforcement, the uplift of the tunnel lining exceeds the control value; by contrast, when these two measures are jointly applied, the uplift of the tunnel lining does not exceed a maximum value of 4.87 mm, which can satisfy the requirements of deformation control. Under these two joint measures, the soil strength between two stacked shield tunnels can be enhanced and the uplift deformation can be restricted with the interlayer soil grouting. Also, the segmental deformation and overall stability of the existing tunnel can be controlled with the temporary steel supports. The deformation of circumferential supports and segments is closely related to each other, and the segmental uplift is controlled by H‐shaped steel supports. With the increase in the horizontal space between twin shields, the effect of the construction would gradually weaken, accompanied by a gradual reduction of the stresses of steel supports. These findings provide a valuable reference for the engineering design and safe construction of overlapping shield tunnels with a small curve radius.