V.A. Kardash
Research Subjects
V.A. Kardash has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Oleksii Lozhnikov
Dnipro University of Technology
2 shared publications - B. Yu Sobko
Motronivskyi Mining Processing Plant, 30-A Molodizhna St., 51700 Vilnohirsk, Ukraine
1 shared publication - B. Yu Sobko
Dnipro University of Technology
1 shared publication - Maksym Chebanov
Dnipro University of Technology
1 shared publication - Oleksandr Denyshchenko
Dnipro University of Technology Ukraine
1 shared publication
Latest Publications
- 1 January 2021
- Published by Dnipro University of Technology in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
- No. 4,p. 23-28
Substantiating rational schedule to load trucks using draglines while mining a pit of Motronivskyi MPP
Purpose. To substantiate a rational schedule for the combined dragline-truck operation taking into consideration a coefficient of mining in the context of the pit. Methodology. Mathematical and graphical modeling was involved while determining a coefficient of mining concentration in the pit as well as feasibility analysis to select a rational procedure scheme for dragline operation. Findings. Recommendations for the selection of rational dragline operation, while truck loading in the context of Motronivsko-Annivskyi pit, have been developed taking into consideration mining concentration degree in the pit. It has been determined that bottom dragline unloading into a truck, located in the central part of bench mining width, as well as the dragline position at 0.5 A distance from the bench crest, is the most efficient plan of action for the conditions. Technological scheme to develop Motronivsko-Annivskyi pit has been proposed. Originality. Dependence of the mining concentration in the pit upon the parameters of development system elements according to different technological schemes has been derived. The dependence helps estimate development cost for overburden rocks using draglines with direct unloading into trucks. Practical value. Technological schemes for the combined dragline dump truck operation have been developed. Their use makes it possible to cut the prime cost of overburden activities. Implementation of the proposed solutions helps cut stripping cost by UAH 79.65 million a year if annual overburden volume is Qrozkryvu - Qstripping = 13.5 million m3/year.
- 1 January 2021
- Published by Dnipro University of Technology in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
- No. 4,p. 23-28
Substantiating rational schedule to load trucks using draglines while mining a pit of Motronivskyi MPP
Purpose. To substantiate a rational schedule for the combined dragline-truck operation taking into consideration a coefficient of mining in the context of the pit. Methodology. Mathematical and graphical modeling was involved while determining a coefficient of mining concentration in the pit as well as feasibility analysis to select a rational procedure scheme for dragline operation. Findings. Recommendations for the selection of rational dragline operation, while truck loading in the context of Motronivsko-Annivskyi pit, have been developed taking into consideration mining concentration degree in the pit. It has been determined that bottom dragline unloading into a truck, located in the central part of bench mining width, as well as the dragline position at 0.5 A distance from the bench crest, is the most efficient plan of action for the conditions. Technological scheme to develop Motronivsko-Annivskyi pit has been proposed. Originality. Dependence of the mining concentration in the pit upon the parameters of development system elements according to different technological schemes has been derived. The dependence helps estimate development cost for overburden rocks using draglines with direct unloading into trucks. Practical value. Technological schemes for the combined dragline dump truck operation have been developed. Their use makes it possible to cut the prime cost of overburden activities. Implementation of the proposed solutions helps cut stripping cost by UAH 79.65 million a year if annual overburden volume is Qrozkryvu - Qstripping = 13.5 million m3/year.
- 1 December 2018
- Published by Dnipro University of Technology in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
- No. 6,p. 26-32
The belt conveyor effectiveness at the rock haulage under flooded pit excavations
The belt conveyor effectiveness at the rock haulage under flooded pit excavations
- 1 December 2018
- Published by Dnipro University of Technology in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
- No. 6,p. 26-32
The belt conveyor effectiveness at the rock haulage under flooded pit excavations
The belt conveyor effectiveness at the rock haulage under flooded pit excavations