Rachita Sethi
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Rachita Sethi has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Deepika Garg
GD Goenka University, Gurugram, India
2 shared publications - Amita Bhagat
Indian Institute of Technology Roorkee
1 shared publication - Amita Bhagat
Jaypee Inst Informat Technol, Dept Math, Noida, India
1 shared publication - Amrita Agrawal
GD Goenka University, Gurugram, India
1 shared publication - Avinash Kumar Shrivastava
Department of Operations Management and Quantitative Techniques, International Management Institute Kolkata, Kolkata, India
1 shared publication
Latest Publications
- 3 July 2023
- Published by Springer Nature in Soft Computing
- Vol. 27 (21) , 15595-15608
Optimum redundancy allocation using spider monkey optimization
- 3 July 2023
- Published by Springer Nature in Soft Computing
- Vol. 27 (21) , 15595-15608
Optimum redundancy allocation using spider monkey optimization
- 29 October 2020
- Published by Ram Arti Publishers in International Journal of Mathematical, Engineering and Management Sciences
- Vol. 6 (1) , 279-295
Controlled Arrival Machine Repair Problem with Working Vacation and Reattempts
This paper addresses machine repair problem (MRP) with M identical operating machines and control arrival policy. The server is unreliable, and can break down during service which is further repaired soon so as to avoid interruption with the service process. The server may go for working vacation in case all the customers are served. The transient analysis of machine repair problem has been done using numerical technique. Various performance measures have been derived. With the help of tables and graphs the numerical results have been shown. The present investigation find applications in various industrial and workshop situations like Automobile repair shop (ARS).
- 29 October 2020
- Published by Ram Arti Publishers in International Journal of Mathematical, Engineering and Management Sciences
- Vol. 6 (1) , 279-295
Controlled Arrival Machine Repair Problem with Working Vacation and Reattempts
This paper addresses machine repair problem (MRP) with M identical operating machines and control arrival policy. The server is unreliable, and can break down during service which is further repaired soon so as to avoid interruption with the service process. The server may go for working vacation in case all the customers are served. The transient analysis of machine repair problem has been done using numerical technique. Various performance measures have been derived. With the help of tables and graphs the numerical results have been shown. The present investigation find applications in various industrial and workshop situations like Automobile repair shop (ARS).
- 10 January 2019
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 2061 (1) , 020028
Performance analysis of machine repair problem with working vacation and service interruptions
The current study deals with machine repair problem with service interruptions and working vacation. The server being working vacation of random length when there are no machines to be repaired. The service process is not completely stopped during the vacation period. Instead, different repair rates are used during normal busy period and vacation state. The repair time, vacation time, failure times are assumed to be exponentially distributed. Various performance measures are calculated using Runge-Kutta method with MATLAB software.
- 10 January 2019
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 2061 (1) , 020028
Performance analysis of machine repair problem with working vacation and service interruptions
The current study deals with machine repair problem with service interruptions and working vacation. The server being working vacation of random length when there are no machines to be repaired. The service process is not completely stopped during the vacation period. Instead, different repair rates are used during normal busy period and vacation state. The repair time, vacation time, failure times are assumed to be exponentially distributed. Various performance measures are calculated using Runge-Kutta method with MATLAB software.