Woong Ko
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Woong Ko has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Jinho Kim
Electrical Engineering and Computer Science, Gwangju Institute of Science and Technology, Gwangju 61005, Republic of Korea
5 shared publications - Jaeho Lee
Research Institute for Solar and Sustainable Energies, Gwangju Institute of Science and Technology, 123 Cheomdangwagi-ro, Buk-gu, Gwangju 61005, Korea
1 shared publication - Jaehyun Lee
School of Integrated Technology, Gwangju Institute of Science and Technology, 123 Cheomdangwagi-ro, Buk-gu, Gwangju 61005, Korea
1 shared publication - Keon Baek
Chosun University
1 shared publication - Taeyoung Kim
Department of Mathematical Science Seoul National University 08826 Seoul South Korea
1 shared publication
Latest Publications
- Open Access
Optimal Scheduling of Distributed Energy Resources in Residential Building under the Demand Response Commitment Contract
This study proposes optimal day-ahead demand response (DR) participation strategies and distributed energy resource (DER) management in a residential building under an individual DR contract with a grid-system operator. First, this study introduces a DER management system in the residential building for participation to the day-ahead DR market. The distributed photovoltaic generation system (PV) and energy-storage system (ESS) are applied to reduce the electricity demand in the building and sell surplus energy on the grid. Among loads in the building, lighting (LTG) and heating, ventilation, and air conditioning (HVAC) loads are included in the DR program. In addition, it is assumed that a power management system of an electric vehicle (EV) charging station is integrated the DER management system. In order to describe stochastic behavior of EV owners, the uncertainty of EV is formulated based on their arrival and departure scenarios. For measuring the economic efficiency of the proposed model, we compare it with the DER self-consuming operation model without DR participation. The problem is solved using mixed integer linear programming to minimize the operating cost. The results in summer and winter are analyzed to evaluate the proposed algorithm’s validity. From these results, the proposed model can be confirmed as reducing operation cost compared to the reference model through optimal day-ahead DR capacity bidding and implementation.
Open AccessOptimal Scheduling of Distributed Energy Resources in Residential Building under the Demand Response Commitment Contract
This study proposes optimal day-ahead demand response (DR) participation strategies and distributed energy resource (DER) management in a residential building under an individual DR contract with a grid-system operator. First, this study introduces a DER management system in the residential building for participation to the day-ahead DR market. The distributed photovoltaic generation system (PV) and energy-storage system (ESS) are applied to reduce the electricity demand in the building and sell surplus energy on the grid. Among loads in the building, lighting (LTG) and heating, ventilation, and air conditioning (HVAC) loads are included in the DR program. In addition, it is assumed that a power management system of an electric vehicle (EV) charging station is integrated the DER management system. In order to describe stochastic behavior of EV owners, the uncertainty of EV is formulated based on their arrival and departure scenarios. For measuring the economic efficiency of the proposed model, we compare it with the DER self-consuming operation model without DR participation. The problem is solved using mixed integer linear programming to minimize the operating cost. The results in summer and winter are analyzed to evaluate the proposed algorithm’s validity. From these results, the proposed model can be confirmed as reducing operation cost compared to the reference model through optimal day-ahead DR capacity bidding and implementation.
- Open Access
- 20 April 2019
- Published by MDPI AG in Applied Sciences
- Vol. 9 (8) , 1647
The Effect of a Renewable Energy Certificate Incentive on Mitigating Wind Power Fluctuations: A Case Study of Jeju Island
As renewable energy penetration in power systems grows, adequate energy policies are needed to support the system’s operations with flexible resources and to adopt more sustainable energies. A peak-biased incentive for energy storage systems (ESS) using the Korean renewable portfolio standard could make power system operations more difficult. For the first time in the research, this study evaluates the effect of imposing a renewable energy certificate incentive in off-peak periods on mitigating wind power fluctuations. We design a coordinated model of a wind farm with an ESS to model the behavior of wind farm operators. Optimization problems are formulated as mixed integer linear programming problems to test the implementation of revenue models under Korean policy. These models are designed to consider additional incentives for discharging the ESS during off-peak periods. The effects of imposing the incentives on wind power fluctuations are evaluated using the magnitude of the renewable energy certificate (REC) multiplier.
- 20 April 2019
- Published by MDPI AG in Applied Sciences
- Vol. 9 (8) , 1647
Open AccessThe Effect of a Renewable Energy Certificate Incentive on Mitigating Wind Power Fluctuations: A Case Study of Jeju Island
As renewable energy penetration in power systems grows, adequate energy policies are needed to support the system’s operations with flexible resources and to adopt more sustainable energies. A peak-biased incentive for energy storage systems (ESS) using the Korean renewable portfolio standard could make power system operations more difficult. For the first time in the research, this study evaluates the effect of imposing a renewable energy certificate incentive in off-peak periods on mitigating wind power fluctuations. We design a coordinated model of a wind farm with an ESS to model the behavior of wind farm operators. Optimization problems are formulated as mixed integer linear programming problems to test the implementation of revenue models under Korean policy. These models are designed to consider additional incentives for discharging the ESS during off-peak periods. The effects of imposing the incentives on wind power fluctuations are evaluated using the magnitude of the renewable energy certificate (REC) multiplier.
- Open Access
- 24 March 2019
- Published by MDPI AG in Applied Sciences
- Vol. 9 (6) , 1231
Day-Ahead Electric Load Forecasting for the Residential Building with a Small-Size Dataset Based on a Self-Organizing Map and a Stacking Ensemble Learning Method
Electric load forecasting for buildings is important as it assists building managers or system operators to plan energy usage and strategize accordingly. Recent increases in the adoption of advanced metering infrastructure (AMI) have made building electrical consumption data available, and this has increased the feasibility of data-driven load forecasting. Self-organizing map (SOM) has been successfully utilized to cluster a dataset into subsets containing similar data points. These subsets are then used to train the forecasting models to improve forecasting accuracy. However, some buildings may have insufficient data since newly installed monitoring devices such as AMI have no choice but to collect a limited amount of data. Using a clustering technique on small datasets could lead to overfitting when using forecasting models following an SOM network to be trained with clusters. This results in a relatively high generalization error. In this study, we propose to address this problem by employing the stacking ensemble learning method (SELM) that is well-known for its generalization ability. An experimental study was conducted using the electricity consumption data of an actual institutional building and meteorological data. Our proposed model outperformed other baseline models, which means it successfully mitigates the effect of overfitting.
- 24 March 2019
- Published by MDPI AG in Applied Sciences
- Vol. 9 (6) , 1231
Open AccessDay-Ahead Electric Load Forecasting for the Residential Building with a Small-Size Dataset Based on a Self-Organizing Map and a Stacking Ensemble Learning Method
Electric load forecasting for buildings is important as it assists building managers or system operators to plan energy usage and strategize accordingly. Recent increases in the adoption of advanced metering infrastructure (AMI) have made building electrical consumption data available, and this has increased the feasibility of data-driven load forecasting. Self-organizing map (SOM) has been successfully utilized to cluster a dataset into subsets containing similar data points. These subsets are then used to train the forecasting models to improve forecasting accuracy. However, some buildings may have insufficient data since newly installed monitoring devices such as AMI have no choice but to collect a limited amount of data. Using a clustering technique on small datasets could lead to overfitting when using forecasting models following an SOM network to be trained with clusters. This results in a relatively high generalization error. In this study, we propose to address this problem by employing the stacking ensemble learning method (SELM) that is well-known for its generalization ability. An experimental study was conducted using the electricity consumption data of an actual institutional building and meteorological data. Our proposed model outperformed other baseline models, which means it successfully mitigates the effect of overfitting.
- Open Access
Generation Expansion Planning Model for Integrated Energy System Considering Feasible Operation Region and Generation Efficiency of Combined Heat and Power
Integrated energy systems can provide a more efficient supply than individual systems by using resources such as cogeneration. To foster efficient management of these systems, the flexible operation of cogeneration resources should be considered for the generation expansion planning model to satisfy the varying demand of energy including heat and electricity, which are interdependent and present different seasonal characteristics. We propose an optimization model of the generation expansion planning for an integrated energy system considering the feasible operation region and efficiency of a combined heat and power (CHP) resource. The proposed model is formulated as a mixed integer linear programming problem to minimize the sum of the annualized cost of the integrated energy system. Then, we set linear constraints of energy resources and describe linearized constraints of a feasible operation region and a generation efficiency of the CHP resource for application to the problem. The effectiveness of the proposed optimization problem is verified through a case study comparing with results of a conventional optimization model that uses constant heat-to-power ratio and generation efficiency of the CHP resource. Furthermore, we evaluate planning schedules and total generation efficiency profiles of the CHP resource for the compared optimization models.
Open AccessGeneration Expansion Planning Model for Integrated Energy System Considering Feasible Operation Region and Generation Efficiency of Combined Heat and Power
Integrated energy systems can provide a more efficient supply than individual systems by using resources such as cogeneration. To foster efficient management of these systems, the flexible operation of cogeneration resources should be considered for the generation expansion planning model to satisfy the varying demand of energy including heat and electricity, which are interdependent and present different seasonal characteristics. We propose an optimization model of the generation expansion planning for an integrated energy system considering the feasible operation region and efficiency of a combined heat and power (CHP) resource. The proposed model is formulated as a mixed integer linear programming problem to minimize the sum of the annualized cost of the integrated energy system. Then, we set linear constraints of energy resources and describe linearized constraints of a feasible operation region and a generation efficiency of the CHP resource for application to the problem. The effectiveness of the proposed optimization problem is verified through a case study comparing with results of a conventional optimization model that uses constant heat-to-power ratio and generation efficiency of the CHP resource. Furthermore, we evaluate planning schedules and total generation efficiency profiles of the CHP resource for the compared optimization models.
- Open Access
- 8 January 2019
- Published by MDPI AG in Applied Sciences
- Vol. 9 (1) , 204
Analysis and Impact Evaluation of Missing Data Imputation in Day-ahead PV Generation Forecasting
Over the past decade, PV power plants have increasingly contributed to power generation. However, PV power generation widely varies due to environmental factors; thus, the accurate forecasting of PV generation becomes essential. Meanwhile, weather data for environmental factors include many missing values; for example, when we estimated the missing values in the precipitation data of the Korea Meteorological Agency, they amounted to ~16% from 2015–2016, and further, 19% of the weather data were missing for 2017. Such missing values deteriorate the PV power generation prediction performance, and they need to be eliminated by filling in other values. Here, we explore the impact of missing data imputation methods that can be used to replace these missing values. We apply four missing data imputation methods to the training data and test data of the prediction model based on support vector regression. When the k-nearest neighbors method is applied to the test data, the prediction performance yields results closest to those for the original data with no missing values, and the prediction model’s performance is stable even when the missing data rate increases. Therefore, we conclude that the most appropriate missing data imputation for application to PV forecasting is the KNN method.
- 8 January 2019
- Published by MDPI AG in Applied Sciences
- Vol. 9 (1) , 204
Open AccessAnalysis and Impact Evaluation of Missing Data Imputation in Day-ahead PV Generation Forecasting
Over the past decade, PV power plants have increasingly contributed to power generation. However, PV power generation widely varies due to environmental factors; thus, the accurate forecasting of PV generation becomes essential. Meanwhile, weather data for environmental factors include many missing values; for example, when we estimated the missing values in the precipitation data of the Korea Meteorological Agency, they amounted to ~16% from 2015–2016, and further, 19% of the weather data were missing for 2017. Such missing values deteriorate the PV power generation prediction performance, and they need to be eliminated by filling in other values. Here, we explore the impact of missing data imputation methods that can be used to replace these missing values. We apply four missing data imputation methods to the training data and test data of the prediction model based on support vector regression. When the k-nearest neighbors method is applied to the test data, the prediction performance yields results closest to those for the original data with no missing values, and the prediction model’s performance is stable even when the missing data rate increases. Therefore, we conclude that the most appropriate missing data imputation for application to PV forecasting is the KNN method.