Mario Plos
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Mario Plos has a total of 43 co-authors. Here are the top co-authors by number of shared publications:
- Karin Lundgren
Department of Architecture and Civil Engineering, Chalmers University of Technology, Gothenburg, Sweden
10 shared publications - Kamyab Zandi
Department of Architecture and Civil Engineering, Chalmers University of Technology, Gothenburg, Sweden
9 shared publications Kent Gylltoft
Professor, Department of Civil and Environmental Engineering, Chalmers University of Technology, Gothenburg, Sweden
7 shared publicationsHendrik Schlune
Consultant Engineer, Department of Civil and Environmental Engineering, Chalmers University of Technology, Gothenburg, Sweden
3 shared publicationsJiangpeng Shu
3 shared publicationsB. Engström
Chalmers University of Technology
2 shared publications
Latest Publications
- Open Access
- 1 July 2026
- Published by Elsevier in Journal of Building Engineering
- Vol. 129
Static membrane action in restrained RC beams: Experimental investigation, and numerical and analytical prediction
- 1 July 2026
- Published by Elsevier in Journal of Building Engineering
- Vol. 129
Open AccessStatic membrane action in restrained RC beams: Experimental investigation, and numerical and analytical prediction
- 1 December 2019
- Published by Elsevier in Engineering Structures
- Vol. 200
Assessment of a cantilever bridge deck slab using multi-level assessment strategy and decision support framework
- 1 December 2019
- Published by Elsevier in Engineering Structures
- Vol. 200
Assessment of a cantilever bridge deck slab using multi-level assessment strategy and decision support framework
- 1 July 2019
- Published by Elsevier in Engineering Structures
- Vol. 190, 345-359
Distribution of shear force: A multi-level assessment of a cantilever RC slab
- 1 July 2019
- Published by Elsevier in Engineering Structures
- Vol. 190, 345-359
Distribution of shear force: A multi-level assessment of a cantilever RC slab
- 1 June 2019
- Published by Elsevier in Engineering Structures
- Vol. 189, 272-285
Crack widths in base restrained walls subjected to restraint loading
- 1 June 2019
- Published by Elsevier in Engineering Structures
- Vol. 189, 272-285
Crack widths in base restrained walls subjected to restraint loading
- 22 January 2019
- Published by Taylor & Francis in Architectural Engineering and Design Management
- Vol. 15 (4) , 249-266
Integrated project team performance in early design stages – performance indicators influencing effectiveness in bridge design
To create multi-functional and integrated project teams, and to adopt a team perspective in the early design stages, it is recognised in the literature that a more effective process is required; one that reduces the probability of costly changes and difficulties during construction. This paper presents an evaluation of project team collaboration during early design and development of construction documents for bridges in Sweden. The purpose was to study key variables influencing the performance of integrated project teams by using importance performance analysis (IPA). A self-evaluation questionnaire addressed clients, contractors, and structural engineering consultants in the Swedish bridge construction industry. The questionnaire addressed three essential cornerstones of value-creation during the engineering design process; culture, structure and competence. These were addressed at three organisational hierarchy levels, the organisation, project, and the individual level. Our results show that increased support and resources are required at the project level for better project team performance. Results further identify that project culture needs to be developed including both collaboration and social relationships as well as project competence, especially the ability to solve mutual issues. This research offers a ‘generalised’ and prioritised view of the challenges in the Swedish bridge construction industry in terms of creating integrated project teams.
- 22 January 2019
- Published by Taylor & Francis in Architectural Engineering and Design Management
- Vol. 15 (4) , 249-266
Integrated project team performance in early design stages – performance indicators influencing effectiveness in bridge design
To create multi-functional and integrated project teams, and to adopt a team perspective in the early design stages, it is recognised in the literature that a more effective process is required; one that reduces the probability of costly changes and difficulties during construction. This paper presents an evaluation of project team collaboration during early design and development of construction documents for bridges in Sweden. The purpose was to study key variables influencing the performance of integrated project teams by using importance performance analysis (IPA). A self-evaluation questionnaire addressed clients, contractors, and structural engineering consultants in the Swedish bridge construction industry. The questionnaire addressed three essential cornerstones of value-creation during the engineering design process; culture, structure and competence. These were addressed at three organisational hierarchy levels, the organisation, project, and the individual level. Our results show that increased support and resources are required at the project level for better project team performance. Results further identify that project culture needs to be developed including both collaboration and social relationships as well as project competence, especially the ability to solve mutual issues. This research offers a ‘generalised’ and prioritised view of the challenges in the Swedish bridge construction industry in terms of creating integrated project teams.
- 1 January 2019
- Published by International Association for Bridge and Structural Engineering (IABSE)
- Vol. 115, 1100-1104
Crack widths in portal frame bridges subjected to restraint effects
Restraint stresses appear in structural parts which are prevented from adjusting their shape when subjected to e.g. shrinkage or thermal actions. If the restrained stresses are large, cracking might occur, which can affect the durability of the structure. In the case of restraint effects, the reinforcement required in a bridge to limit the crack widths can be difficult to determine, as the magnitude of the restraint stresses depend on the stiffness of the structure. If cracking occurs, the stiffness is reduced and thereby also the stresses. For this reason, in structural parts affected by restraint effects, it can be hard to estimate both the number of cracks that will appear and the resulting restraint stress that governs the crack widths.In this study, crack widths in a portal frame bridge subjected to thermal actions and shrinkage were investigated using non-linear FE analysis. A bond-slip relation was used for concrete-reinforcement interaction, as the resulting crack spacing was unknown. Corresponding analysis was performed using linear elastic material models and hand calculations of crack widths, for two different thermal load cases, and relations between the results from the different methods are presented. The result can lead to the development of a more accurate design model, which would lead to more efficient use of reinforcement.
- 1 January 2019
- Published by International Association for Bridge and Structural Engineering (IABSE)
- Vol. 115, 1100-1104
Crack widths in portal frame bridges subjected to restraint effects
Restraint stresses appear in structural parts which are prevented from adjusting their shape when subjected to e.g. shrinkage or thermal actions. If the restrained stresses are large, cracking might occur, which can affect the durability of the structure. In the case of restraint effects, the reinforcement required in a bridge to limit the crack widths can be difficult to determine, as the magnitude of the restraint stresses depend on the stiffness of the structure. If cracking occurs, the stiffness is reduced and thereby also the stresses. For this reason, in structural parts affected by restraint effects, it can be hard to estimate both the number of cracks that will appear and the resulting restraint stress that governs the crack widths.In this study, crack widths in a portal frame bridge subjected to thermal actions and shrinkage were investigated using non-linear FE analysis. A bond-slip relation was used for concrete-reinforcement interaction, as the resulting crack spacing was unknown. Corresponding analysis was performed using linear elastic material models and hand calculations of crack widths, for two different thermal load cases, and relations between the results from the different methods are presented. The result can lead to the development of a more accurate design model, which would lead to more efficient use of reinforcement.
- 11 October 2018
- Published by Taylor & Francis in Structure and Infrastructure Engineering
- Vol. 15 (1) , 27-53
A multi-level strategy for successively improved structural analysis of existing concrete bridges: examination using a prestressed concrete bridge tested to failure
This paper describes a multi-level strategy with increased complexity through four levels of structural analysis of concrete bridges. The concept was developed to provide a procedure that supports enhanced assessments with better understanding of the structure and more precise predictions of the load-carrying capacity. In order to demonstrate and examine the multi-level strategy, a continuous multi-span prestressed concrete girder bridge, tested until shear failure, was investigated. Calculations of the load-carrying capacity at the initial level of the multi-level strategy consistently resulted in underestimated capacities, with the predicted load ranging from 25% to 78% of the tested failure load, depending on the local resistance model applied. The initial assessment was also associated with issues of localising the shear failure accurately and, consequently, refined structural analysis at an enhanced level was recommended. Enhanced assessment using nonlinear finite element (FE) analysis precisely reproduced the behaviour observed in the experimental test, capturing the actual failure mechanism and the load-carrying capacity with less than 4% deviation to the test. Thus, the enhanced level of assessment, using the proposed multi-level strategy, can be considered to be accurate, but the study also shows the importance of using guidelines for nonlinear FE analysis and bridge-specific information.
- 11 October 2018
- Published by Taylor & Francis in Structure and Infrastructure Engineering
- Vol. 15 (1) , 27-53
A multi-level strategy for successively improved structural analysis of existing concrete bridges: examination using a prestressed concrete bridge tested to failure
This paper describes a multi-level strategy with increased complexity through four levels of structural analysis of concrete bridges. The concept was developed to provide a procedure that supports enhanced assessments with better understanding of the structure and more precise predictions of the load-carrying capacity. In order to demonstrate and examine the multi-level strategy, a continuous multi-span prestressed concrete girder bridge, tested until shear failure, was investigated. Calculations of the load-carrying capacity at the initial level of the multi-level strategy consistently resulted in underestimated capacities, with the predicted load ranging from 25% to 78% of the tested failure load, depending on the local resistance model applied. The initial assessment was also associated with issues of localising the shear failure accurately and, consequently, refined structural analysis at an enhanced level was recommended. Enhanced assessment using nonlinear finite element (FE) analysis precisely reproduced the behaviour observed in the experimental test, capturing the actual failure mechanism and the load-carrying capacity with less than 4% deviation to the test. Thus, the enhanced level of assessment, using the proposed multi-level strategy, can be considered to be accurate, but the study also shows the importance of using guidelines for nonlinear FE analysis and bridge-specific information.
- 17 November 2016
- Published by Taylor & Francis
- p. 421
Numerical prediction of punching behavior of RC slabs using 3D nonlinear FE analysis
- 17 November 2016
- Published by Taylor & Francis
- p. 421
Numerical prediction of punching behavior of RC slabs using 3D nonlinear FE analysis
- 1 October 2016
- Published by Elsevier in Engineering Structures
- Vol. 125, 15-25
Prediction of punching behaviour of RC slabs using continuum non-linear FE analysis
- 1 October 2016
- Published by Elsevier in Engineering Structures
- Vol. 125, 15-25
Prediction of punching behaviour of RC slabs using continuum non-linear FE analysis
- 1 September 2016
- Published by Elsevier in Engineering Structures
- Vol. 122, 72-82
Spalling in concrete subjected to shock wave blast
- 1 September 2016
- Published by Elsevier in Engineering Structures
- Vol. 122, 72-82
Spalling in concrete subjected to shock wave blast