Shahab Shoar
Shahab Shoar has a total of 17 co-authors. Here are the top co-authors by number of shared publications:
- Nicholas Chileshe
University of South Australia
3 shared publications - Audrius Banaitis
Vilnius Gediminas Tech Univ, Fac Civil Engn, Dept Construct Management & Real Estate, Vilnius, Lithuania
2 shared publications - Farnad Nasirzadeh
Geelong Waterfront Campus, Deakin University, Victoria, Australia.
2 shared publications - Shamsi Payan
School of Architecture and Environmental Design, Iran University of Science and Technology, Tehran, Islamic Republic of Iran
2 shared publications Ahad Nazari
1 shared publication- David John Edwards
School of Engineering and the Built Environment, Birmingham City University
1 shared publication
Latest Publications
- Top Cited Papers
- 3 February 2022
- Published by Elsevier in Journal of Building Engineering
- Vol. 50
Machine learning-aided engineering services' cost overruns prediction in high-rise residential building projects: Application of random forest regression
- 3 February 2022
- Published by Elsevier in Journal of Building Engineering
- Vol. 50
Top Cited PapersMachine learning-aided engineering services' cost overruns prediction in high-rise residential building projects: Application of random forest regression
- 30 December 2021
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 30  (2) , 365-392
Modeling cost overrun in building construction projects using the interpretive structural modeling approach: a developing country perspective
Purpose: Although several studies have been conducted on the causes of cost overrun, they have mainly assumed that the causes of cost overrun are independent of each other, and few of them scrutinized the complex interrelationships between the causes. To fill the gap, this study aims to investigate the mutual interactions between the causes of cost overrun using interpretive structural modeling (ISM) and proposing strategies to tackle the causes considering their interactions.Design/methodology/approach: Critical causes of cost overrun were identified through a comprehensive literature review. In total, 22 key causes are then refined based on the opinions of relevant experts involved in the Iranian building and construction sector. Using the nominal group technique, the causes' interactions were examined and represented via the ISM diagram. The causes were also classified using “matrix cross-reference multiplication applied to a classification (MICMAC)” technique.Findings: The results showed that price fluctuation, claims, execution delay, delay in payment and change order positioned at the highest level of the obtained model can directly result in cost overrun, and corruption and poor contract management located at the base of the model are two major root causes of cost overruns. It was also concluded that more attention should be paid to the precontract phase of the project to address and prevent corruption and managerial issues deeply rooted in this stage.Originality/value: The findings of this study provide a clear understanding of how different causes of cost overrun are related to each other and can ultimately assist project managers of different parties in choosing strategies to mitigate cost overrun in building construction projects.
- 30 December 2021
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 30  (2) , 365-392
Modeling cost overrun in building construction projects using the interpretive structural modeling approach: a developing country perspective
Purpose: Although several studies have been conducted on the causes of cost overrun, they have mainly assumed that the causes of cost overrun are independent of each other, and few of them scrutinized the complex interrelationships between the causes. To fill the gap, this study aims to investigate the mutual interactions between the causes of cost overrun using interpretive structural modeling (ISM) and proposing strategies to tackle the causes considering their interactions.Design/methodology/approach: Critical causes of cost overrun were identified through a comprehensive literature review. In total, 22 key causes are then refined based on the opinions of relevant experts involved in the Iranian building and construction sector. Using the nominal group technique, the causes' interactions were examined and represented via the ISM diagram. The causes were also classified using “matrix cross-reference multiplication applied to a classification (MICMAC)” technique.Findings: The results showed that price fluctuation, claims, execution delay, delay in payment and change order positioned at the highest level of the obtained model can directly result in cost overrun, and corruption and poor contract management located at the base of the model are two major root causes of cost overruns. It was also concluded that more attention should be paid to the precontract phase of the project to address and prevent corruption and managerial issues deeply rooted in this stage.Originality/value: The findings of this study provide a clear understanding of how different causes of cost overrun are related to each other and can ultimately assist project managers of different parties in choosing strategies to mitigate cost overrun in building construction projects.
- 30 November 2021
- Published by Emerald Publishing in International Journal of Managing Projects in Business
- Vol. 15  (2) , 371-395
Assessment of the causes and effects of design deficiencies for large construction projects using social network analysis
Purpose: The purpose of this study is to investigate the latent interrelationships of causes and effects of design deficiencies (DDs) and to identify the most crucial ones by considering the interactions among them.Design/methodology/approach: First, through a comprehensive literature review, the most critical causes of DDs were identified. The review eventuated in a list of 22 causes and 12 effects, which were categorized into six groups. Second, through the rules of system dynamics and the interactions between the causes and effects were modeled and illustrated using causal loop diagrams (CLDs). With the aid of semi-structured interviews with 20 competent experts, the resultant CLDs were also validated. Third, the opinions of 54 experts, who were chosen from the Iranian community of clients and consultants, were solicited concerning the degree of influence which each factor (causes or effects) exerts on others. Finally, the social network analysis (SNA) approach was deployed to analyze and prioritize factors based on the gathered data from experts.Findings: SNA results indicated that factors such as “design firms' staff rework” and “design firms' loss of reputation” are the most central factors affecting DDs. The model results also identified that factors such as “schedule variance”, “workload” and “lack of quality control and supervision during the design phase” have the highest overall impact on DDs. In the end, some recommendations to address major factors and links were also put forward. Overall, more communications between the pair of stakeholder groups and continuous learning from project experiences are believed to be the main strategies.Originality/value: It is believed that this study has provided a comprehensive understanding of causal mechanisms among factors, which can assist project managers of different parties (clients, contractors and consulting firms) in taking more effective actions to ameliorate the quality of design documents.
- 30 November 2021
- Published by Emerald Publishing in International Journal of Managing Projects in Business
- Vol. 15  (2) , 371-395
Assessment of the causes and effects of design deficiencies for large construction projects using social network analysis
Purpose: The purpose of this study is to investigate the latent interrelationships of causes and effects of design deficiencies (DDs) and to identify the most crucial ones by considering the interactions among them.Design/methodology/approach: First, through a comprehensive literature review, the most critical causes of DDs were identified. The review eventuated in a list of 22 causes and 12 effects, which were categorized into six groups. Second, through the rules of system dynamics and the interactions between the causes and effects were modeled and illustrated using causal loop diagrams (CLDs). With the aid of semi-structured interviews with 20 competent experts, the resultant CLDs were also validated. Third, the opinions of 54 experts, who were chosen from the Iranian community of clients and consultants, were solicited concerning the degree of influence which each factor (causes or effects) exerts on others. Finally, the social network analysis (SNA) approach was deployed to analyze and prioritize factors based on the gathered data from experts.Findings: SNA results indicated that factors such as “design firms' staff rework” and “design firms' loss of reputation” are the most central factors affecting DDs. The model results also identified that factors such as “schedule variance”, “workload” and “lack of quality control and supervision during the design phase” have the highest overall impact on DDs. In the end, some recommendations to address major factors and links were also put forward. Overall, more communications between the pair of stakeholder groups and continuous learning from project experiences are believed to be the main strategies.Originality/value: It is believed that this study has provided a comprehensive understanding of causal mechanisms among factors, which can assist project managers of different parties (clients, contractors and consulting firms) in taking more effective actions to ameliorate the quality of design documents.
- Open Access
Modeling Social Impacts of High-Rise Residential Buildings during the Post-Occupancy Phase Using DEMATEL Method: A Case Study
There are numerous risks associated with high-rise buildings, which not only affect stakeholders during the design and construction phase but also impact the occupants and the surrounding environment during the post-occupancy phase. While previous studies examined the risks of high-rise building construction, less attention has been paid to the diverse impacts of high-rise buildings on their occupants. To fill this gap, this study applied a mixed-method approach (both quantitative and qualitative) to identify and prioritize their most significant social impacts. First, the possible social impacts of these buildings were identified via a literature review. The interrelationships among the identified factors were then determined by drawing on the opinions of relevant experts. Next, through the quantitative phase, the high-rise residential buildings of District 22 of Tehran were considered as a case study, and according to the opinions of 230 chosen residents, the level of influence of factors on one another was determined. The DEMATEL approach was employed subsequently to analyze the data and identify the most important and influential factors. Finally, through the qualitative phase, in-depth interviews were conducted with residents to explain and validate the results. The most significant and influential impacts identified by this study were anti-social behavior, lack of social cohesion, and lack of social contact with neighbors. This study assists designers and policymakers to adopt strategies that could mitigate the identified impacts and improve occupants’ social wellbeing more efficiently.
Open AccessModeling Social Impacts of High-Rise Residential Buildings during the Post-Occupancy Phase Using DEMATEL Method: A Case Study
There are numerous risks associated with high-rise buildings, which not only affect stakeholders during the design and construction phase but also impact the occupants and the surrounding environment during the post-occupancy phase. While previous studies examined the risks of high-rise building construction, less attention has been paid to the diverse impacts of high-rise buildings on their occupants. To fill this gap, this study applied a mixed-method approach (both quantitative and qualitative) to identify and prioritize their most significant social impacts. First, the possible social impacts of these buildings were identified via a literature review. The interrelationships among the identified factors were then determined by drawing on the opinions of relevant experts. Next, through the quantitative phase, the high-rise residential buildings of District 22 of Tehran were considered as a case study, and according to the opinions of 230 chosen residents, the level of influence of factors on one another was determined. The DEMATEL approach was employed subsequently to analyze the data and identify the most important and influential factors. Finally, through the qualitative phase, in-depth interviews were conducted with residents to explain and validate the results. The most significant and influential impacts identified by this study were anti-social behavior, lack of social cohesion, and lack of social contact with neighbors. This study assists designers and policymakers to adopt strategies that could mitigate the identified impacts and improve occupants’ social wellbeing more efficiently.
- Open Access
- 25 August 2021
- Published by MDPI AG in Sustainability
- Vol. 13  (17) , 9578
Exploring the Causes of Design Changes in Building Construction Projects: An Interpretive Structural Modeling Approach
The purpose of this study is to investigate the mutual interactions between the causes of design changes using Interpretive Structural Modeling (ISM) and to classify the causes using the “Matrice d’Impacts Croisés Multiplication Appliquée à un Classement” MICMAC technique. This study further identifies and proposes strategies to mitigate design change occurrence and map them onto the identified connections between the causes. To achieve these goals, critical causes of design changes were identified through a comprehensive literature review; 23 key causes were then refined according to the opinions of relevant experts involved in the Iranian building construction sector. Stakeholders associated with each cause and the management areas from which causes arise were also considered. The factors “Unfamiliarity with new construction methods”, “Design errors”, “Value engineering”, “Scope uncertainty”, “Change orders”, and “Constructability ignored in the design phase”, which are highly influenced by other factors, emerged at the highest level of the ISM diagram, and “Clients’ attitudes and experience” as the main root cause of design changes at the bottom of the diagram. The MICMAC technique results showed that consultant-related causes significantly influence other causes, and policy and client-related causes have a feedback effect on the whole system. The findings of this study provide a better insight into how various causes of design changes are connected to one another and can ultimately assist project managers of different parties, even in other countries, to choose influential strategies to mitigate design changes in building construction projects.
- 25 August 2021
- Published by MDPI AG in Sustainability
- Vol. 13  (17) , 9578
Open AccessExploring the Causes of Design Changes in Building Construction Projects: An Interpretive Structural Modeling Approach
The purpose of this study is to investigate the mutual interactions between the causes of design changes using Interpretive Structural Modeling (ISM) and to classify the causes using the “Matrice d’Impacts Croisés Multiplication Appliquée à un Classement” MICMAC technique. This study further identifies and proposes strategies to mitigate design change occurrence and map them onto the identified connections between the causes. To achieve these goals, critical causes of design changes were identified through a comprehensive literature review; 23 key causes were then refined according to the opinions of relevant experts involved in the Iranian building construction sector. Stakeholders associated with each cause and the management areas from which causes arise were also considered. The factors “Unfamiliarity with new construction methods”, “Design errors”, “Value engineering”, “Scope uncertainty”, “Change orders”, and “Constructability ignored in the design phase”, which are highly influenced by other factors, emerged at the highest level of the ISM diagram, and “Clients’ attitudes and experience” as the main root cause of design changes at the bottom of the diagram. The MICMAC technique results showed that consultant-related causes significantly influence other causes, and policy and client-related causes have a feedback effect on the whole system. The findings of this study provide a better insight into how various causes of design changes are connected to one another and can ultimately assist project managers of different parties, even in other countries, to choose influential strategies to mitigate design changes in building construction projects.
- 11 August 2021
- Published by Emerald Publishing
A qualitative system dynamics approach to modeling the causes and effects of design deficiencies in construction projects
Div style="box-sizing: border-box; color: rgba(0, 0, 0, 0.87); font-family: 'Open Sans', sans-serif; font-size: 18px; margin-bottom: 1rem !important;">Purpose Poor quality of design documents and Design Deficiencies (DDs) are critical factors that can potentially cause time and cost overrun and lead to project failure. Despite the importance of this issue, few studies have been conducted to explore the underlying relations among the causes and effects of DDs, and it is not clear how they exert influence on each other. However, it is imperative to have a clear understanding of their interrelationships so as to devise intervention strategies. The purpose of this study is, therefore, to explore these causes and effects. Design/methodology/approach To this aim, a qualitative system dynamics model was provided to visualize how various factors interact with one another. The model was developed and validated by drawing on the expertise of industry-related experts. The key causes and effects of the DDs were identified through the investigation of the model. Findings It was concluded that design management of project and the composition of design teams are critical. The obtained results also showed that more attention should be paid to the enhancement of knowledge circulation and communication within design firms and increasing the awareness of managers and owners from the technical consequences of their managerial decisions. Research limitations/implications It is worth mentioning that the design process could be deeply affected by the quality, frequency and strength of relationships among the project’s parties. Early involvement of contractors, for example, can significantly contribute to enhancing design quality. This study investigates factors’ interactions in projects delivered using the traditional design-bid-build method. As relationships between the project’s parties could be different in various project delivery methods, further research is indeed needed to assess factors’ interactions in projects delivered using other methods. Originality/value It is believed that the proposed model by providing a better insight into the connections of causes and effects could aid project managers of different parties with planning the strategies to reduce DDs and mitigate their effects. </div
- 11 August 2021
- Published by Emerald Publishing
A qualitative system dynamics approach to modeling the causes and effects of design deficiencies in construction projects
Div style="box-sizing: border-box; color: rgba(0, 0, 0, 0.87); font-family: 'Open Sans', sans-serif; font-size: 18px; margin-bottom: 1rem !important;">Purpose Poor quality of design documents and Design Deficiencies (DDs) are critical factors that can potentially cause time and cost overrun and lead to project failure. Despite the importance of this issue, few studies have been conducted to explore the underlying relations among the causes and effects of DDs, and it is not clear how they exert influence on each other. However, it is imperative to have a clear understanding of their interrelationships so as to devise intervention strategies. The purpose of this study is, therefore, to explore these causes and effects. Design/methodology/approach To this aim, a qualitative system dynamics model was provided to visualize how various factors interact with one another. The model was developed and validated by drawing on the expertise of industry-related experts. The key causes and effects of the DDs were identified through the investigation of the model. Findings It was concluded that design management of project and the composition of design teams are critical. The obtained results also showed that more attention should be paid to the enhancement of knowledge circulation and communication within design firms and increasing the awareness of managers and owners from the technical consequences of their managerial decisions. Research limitations/implications It is worth mentioning that the design process could be deeply affected by the quality, frequency and strength of relationships among the project’s parties. Early involvement of contractors, for example, can significantly contribute to enhancing design quality. This study investigates factors’ interactions in projects delivered using the traditional design-bid-build method. As relationships between the project’s parties could be different in various project delivery methods, further research is indeed needed to assess factors’ interactions in projects delivered using other methods. Originality/value It is believed that the proposed model by providing a better insight into the connections of causes and effects could aid project managers of different parties with planning the strategies to reduce DDs and mitigate their effects. </div
- 3 October 2019
- Published by Emerald Publishing in Journal of Financial Management of Property and Construction
- Vol. 24  (3) , 630-654
A hybrid framework to model factors affecting construction labour productivity
Purpose: This paper aims to model different causal relations among factors interacting with labour productivity in order to recognize the most important factors influencing and influenced by it. Design/methodology/approach: Top 60 factors affecting labour productivity were determined and grouped into 5 major groups by reviewing previous research and interviewing relevant experts. The interactions of factors were modelled using system dynamics (SD) approach. The resulting causal loop diagrams obtained from SD were then applied for identifying the most crucial factors influencing and influenced by labour productivity through the decision-making trial and evaluation laboratory (DEMATEL) method. The impact of factors on each other was finally determined based on the opinions of 63 experts selected from the Iranian construction industry. Findings: The results indicated that factors such as fatigue, lack of labour motivation and lack of skill are the most influencing, and factors such as schedule delay and inflation in the cost of execution are the most influenced by labour productivity. In the end, a set of recommendations to improve construction labour productivity was also presented. Originality/value: The main contribution of the study is proposing a novel method which is capable of providing insights into how causes and effects of construction labour productivity are interrelated. Furthermore, the proposed method makes this study distinct from previous research in the light of prioritizing factors and offering recommendations according to the interrelationships among factors.
- 3 October 2019
- Published by Emerald Publishing in Journal of Financial Management of Property and Construction
- Vol. 24  (3) , 630-654
A hybrid framework to model factors affecting construction labour productivity
Purpose: This paper aims to model different causal relations among factors interacting with labour productivity in order to recognize the most important factors influencing and influenced by it. Design/methodology/approach: Top 60 factors affecting labour productivity were determined and grouped into 5 major groups by reviewing previous research and interviewing relevant experts. The interactions of factors were modelled using system dynamics (SD) approach. The resulting causal loop diagrams obtained from SD were then applied for identifying the most crucial factors influencing and influenced by labour productivity through the decision-making trial and evaluation laboratory (DEMATEL) method. The impact of factors on each other was finally determined based on the opinions of 63 experts selected from the Iranian construction industry. Findings: The results indicated that factors such as fatigue, lack of labour motivation and lack of skill are the most influencing, and factors such as schedule delay and inflation in the cost of execution are the most influenced by labour productivity. In the end, a set of recommendations to improve construction labour productivity was also presented. Originality/value: The main contribution of the study is proposing a novel method which is capable of providing insights into how causes and effects of construction labour productivity are interrelated. Furthermore, the proposed method makes this study distinct from previous research in the light of prioritizing factors and offering recommendations according to the interrelationships among factors.
- 5 March 2019
- Published by Emerald Publishing in Construction Innovation
- Vol. 19  (1) , 48-70
Quantitative assessment of risks on construction projects using fault tree analysis with hybrid uncertainties
Purpose: The purpose of this paper is to present a fault tree (FT)-based approach for quantitative risk analysis in the construction industry that can take into account both objective and subjective uncertainties. Design/methodology/approach: In this research, the identified basic events (BEs) are first categorized based on the availability of historical data into probabilistic and possibilistic. The probabilistic and possibilistic events are represented by probability distributions and fuzzy numbers, respectively. Hybrid uncertainty analysis is then performed through a combination of Monte Carlo simulation and fuzzy set theory. The probability of occurrence of the top event is finally calculated using the proposed FT-based hybrid uncertainty analysis method. Findings: The efficiency of the proposed method is demonstrated by implementing in a real steel structure project. A quantitative risk assessment is performed for weld cracks, taking into account of both types of uncertainties. An importance analysis is finally performed to evaluate the contribution of each BE to the probability of occurrence of weld cracks and adopt appropriate response strategies. Research limitations/implications: In this research, the impact of objective (aleatory) dependence between the occurrences of different BEs and subjective (epistemic) dependence between estimates of the epistemically uncertain probabilities of some BEs are not considered. Moreover, there exist limitations to the application of fuzzy set rules, which were used for aggregating experts’ opinions and ranking purposes of the BEs in the FT model. These limitations can be investigated through further research. Originality/value: It is believed that the proposed hybrid uncertainty analysis method presents a robust and powerful tool for quantitative risk analysis, as both types of uncertainties are taken into account appropriately.
- 5 March 2019
- Published by Emerald Publishing in Construction Innovation
- Vol. 19  (1) , 48-70
Quantitative assessment of risks on construction projects using fault tree analysis with hybrid uncertainties
Purpose: The purpose of this paper is to present a fault tree (FT)-based approach for quantitative risk analysis in the construction industry that can take into account both objective and subjective uncertainties. Design/methodology/approach: In this research, the identified basic events (BEs) are first categorized based on the availability of historical data into probabilistic and possibilistic. The probabilistic and possibilistic events are represented by probability distributions and fuzzy numbers, respectively. Hybrid uncertainty analysis is then performed through a combination of Monte Carlo simulation and fuzzy set theory. The probability of occurrence of the top event is finally calculated using the proposed FT-based hybrid uncertainty analysis method. Findings: The efficiency of the proposed method is demonstrated by implementing in a real steel structure project. A quantitative risk assessment is performed for weld cracks, taking into account of both types of uncertainties. An importance analysis is finally performed to evaluate the contribution of each BE to the probability of occurrence of weld cracks and adopt appropriate response strategies. Research limitations/implications: In this research, the impact of objective (aleatory) dependence between the occurrences of different BEs and subjective (epistemic) dependence between estimates of the epistemically uncertain probabilities of some BEs are not considered. Moreover, there exist limitations to the application of fuzzy set rules, which were used for aggregating experts’ opinions and ranking purposes of the BEs in the FT model. These limitations can be investigated through further research. Originality/value: It is believed that the proposed hybrid uncertainty analysis method presents a robust and powerful tool for quantitative risk analysis, as both types of uncertainties are taken into account appropriately.
- Open Access
- 22 January 2019
- Published by Vilnius Gediminas Technical University in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
- Vol. 25  (1) , 41-52
APPLICATION OF FUZZY FAULT TREE ANALYSIS TO IDENTIFY FACTORS INFLUENCING CONSTRUCTION LABOR PRODUCTIVITY: A HIGH-RISE BUILDING CASE STUDY
The aim of this research is to develop a systematic approach to identify and prioritize the most influencing factors on labor productivity in a construction project, with respect to their interrelations, and also investigate different scenarios which can affect it. In the first step, factors influencing construction labor productivity were identified through reviewing previous researches. Applying a group of experts, the most important factors were then determined using their relative importance index in the second step. In the third step, the interrelations among factors were determined through several sessions and interviewing those experts. Finally, the efficiency of the proposed methodology is proved by implementing in a real high rise building construction project. In this step, the selected factors from previous steps were used subsequently for analyzing their impact on labor productivity through fuzzy fault tree analysis. The probability of occurrence of events was determined according to the opinions of four members of the project management team who involved in that project. The most critical causes were also identified using importance analysis. It is believed that using the proposed methodology, appropriate response strategies could be adopted against the identified critical events to enhance the overall productivity of a construction project.
- 22 January 2019
- Published by Vilnius Gediminas Technical University in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
- Vol. 25  (1) , 41-52
Open AccessAPPLICATION OF FUZZY FAULT TREE ANALYSIS TO IDENTIFY FACTORS INFLUENCING CONSTRUCTION LABOR PRODUCTIVITY: A HIGH-RISE BUILDING CASE STUDY
The aim of this research is to develop a systematic approach to identify and prioritize the most influencing factors on labor productivity in a construction project, with respect to their interrelations, and also investigate different scenarios which can affect it. In the first step, factors influencing construction labor productivity were identified through reviewing previous researches. Applying a group of experts, the most important factors were then determined using their relative importance index in the second step. In the third step, the interrelations among factors were determined through several sessions and interviewing those experts. Finally, the efficiency of the proposed methodology is proved by implementing in a real high rise building construction project. In this step, the selected factors from previous steps were used subsequently for analyzing their impact on labor productivity through fuzzy fault tree analysis. The probability of occurrence of events was determined according to the opinions of four members of the project management team who involved in that project. The most critical causes were also identified using importance analysis. It is believed that using the proposed methodology, appropriate response strategies could be adopted against the identified critical events to enhance the overall productivity of a construction project.
- 14 March 2018
- Published by SCI AND TECH UNIVERSAL INC in Scientia Iranica
- Vol. 26  (3) , 1763-1777
An Optimization Framework for Risk Response Actions Selection Using Hybrid ACO and FTOPSIS
This paper presents a framework for solving risk response action selection problem by considering: (1) the impact of risk events on the project objectives, (2) the interactions between risk events and (3) management criteria and preferences. For these purposes, a framework is developed by combining an optimization-based model and a Multi Criteria Decision Making (MCDM) approach. First, in the optimization-based model, Ant Colony Optimization (ACO) is used to find the best combination of response actions which have more effects on time, cost and quality. Also, in this model, to overcome the imprecision situation resulting from lack of knowledge or insufficient data, risk parameters are determined using the fuzzy set theory. Moreover, the Design Structure Matrix (DSM) is used to capture the effect of interactions between risk events. Second, the Fuzzy Technique for Order Preference by Similarity to Ideal Solution (FTOPSIS) method is used to analyze the obtained solutions by ACO, based on the other management criteria. Finally, the efficiency of the proposed framework is examined by its implementation in a real building construction project. Discussions through the case study show that using the proposed framework decision makers can evaluate more aspects of response actions.
- 14 March 2018
- Published by SCI AND TECH UNIVERSAL INC in Scientia Iranica
- Vol. 26  (3) , 1763-1777
An Optimization Framework for Risk Response Actions Selection Using Hybrid ACO and FTOPSIS
This paper presents a framework for solving risk response action selection problem by considering: (1) the impact of risk events on the project objectives, (2) the interactions between risk events and (3) management criteria and preferences. For these purposes, a framework is developed by combining an optimization-based model and a Multi Criteria Decision Making (MCDM) approach. First, in the optimization-based model, Ant Colony Optimization (ACO) is used to find the best combination of response actions which have more effects on time, cost and quality. Also, in this model, to overcome the imprecision situation resulting from lack of knowledge or insufficient data, risk parameters are determined using the fuzzy set theory. Moreover, the Design Structure Matrix (DSM) is used to capture the effect of interactions between risk events. Second, the Fuzzy Technique for Order Preference by Similarity to Ideal Solution (FTOPSIS) method is used to analyze the obtained solutions by ACO, based on the other management criteria. Finally, the efficiency of the proposed framework is examined by its implementation in a real building construction project. Discussions through the case study show that using the proposed framework decision makers can evaluate more aspects of response actions.