Nahyun Kwon
Nahyun Kwon has a total of 48 co-authors. Here are the top co-authors by number of shared publications:
- Yonghan Ahn
Department of Architectural Engineering, Hanyang University-ERICA, Ansan 15588, Republic of Korea
14 shared publications - Moonseo Park
Department of Architecture and Architectural Engineering, Seoul National University, Gwanak-ro 1, Gwanak-gu, Seoul 08826, Korea
5 shared publications Yonghan Ahn
5 shared publications- Hyosoo Moon
Department of Civil, Architectural, and Environmental Engineering, North Carolina A&T State University, Greensboro, NC 27411, USA
4 shared publications - Youjin Jang
North Dakota State Univ
4 shared publications - Byeol Kim
Institute of Environmental & Energy Technology, Hanyang University-ERICA, Hanyangdaehak-ro 55, Sangnok-gu, Ansan-si 15588, Gyeonggi-do, Republic of Korea
3 shared publications
Latest Publications
- Open Access
Partial Cost Information and Empirical Contingency in Building Retrofit Cost Prediction
This study retrospectively evaluated partial cost information and empirical contingency in an archived extract of public-building retrofits. The primary reporting sample comprised 246 records, with all 250 retained for sensitivity analysis. Adding four recorded component costs reduced total-cost mean absolute percentage error (MAPE) from 23.35% to 17.30% for genetic-algorithm-weighted case-based reasoning and from 23.05% to 14.68% for Extra Trees. The primary comparison did not establish a larger improvement for Extra Trees. Predicting the remaining cost and adding the observed subtotal produced 12.72% total-cost MAPE, but remaining-cost-weighted absolute percentage error was 19.28% and remaining-cost MAPE was 29.42%. The paired target-route difference also remained uncertain. Additional nested selection across 14 family-target routes yielded 12.64% total-cost MAPE within the same archive. The historical project-level 90th-percentile (P90) allowance was 35.47%; separate training/calibration/evaluation splits achieved 76–98% coverage with empirical P90 allowances calibrated on disjoint records. For the largest-area holdout, remaining-cost weighted error reached 46.74%, and the 35.47% historical allowance covered only 62% of cases. The selected extract differed from the other records in our 419-record research archive. Field timing and project dates were unavailable. The results support an evaluation framework, not demonstrated early-stage forecasting accuracy or a transferable contingency rate.
Open AccessPartial Cost Information and Empirical Contingency in Building Retrofit Cost Prediction
This study retrospectively evaluated partial cost information and empirical contingency in an archived extract of public-building retrofits. The primary reporting sample comprised 246 records, with all 250 retained for sensitivity analysis. Adding four recorded component costs reduced total-cost mean absolute percentage error (MAPE) from 23.35% to 17.30% for genetic-algorithm-weighted case-based reasoning and from 23.05% to 14.68% for Extra Trees. The primary comparison did not establish a larger improvement for Extra Trees. Predicting the remaining cost and adding the observed subtotal produced 12.72% total-cost MAPE, but remaining-cost-weighted absolute percentage error was 19.28% and remaining-cost MAPE was 29.42%. The paired target-route difference also remained uncertain. Additional nested selection across 14 family-target routes yielded 12.64% total-cost MAPE within the same archive. The historical project-level 90th-percentile (P90) allowance was 35.47%; separate training/calibration/evaluation splits achieved 76–98% coverage with empirical P90 allowances calibrated on disjoint records. For the largest-area holdout, remaining-cost weighted error reached 46.74%, and the 35.47% historical allowance covered only 62% of cases. The selected extract differed from the other records in our 419-record research archive. Field timing and project dates were unavailable. The results support an evaluation framework, not demonstrated early-stage forecasting accuracy or a transferable contingency rate.
- Open Access
- 21 May 2026
- Published by MDPI AG in Sustainability
- Vol. 18 (10) , 5212
A Preliminary Data-Driven Competency Mapping Study for Modular Construction Designers: Exploratory Korean Validation Using Bayesian BWM and Fuzzy DEMATEL
Modular construction advances sustainability and is reshaping designer competencies, making workforce development critical to industry transition. Existing competency models rely mainly on expert interviews and Delphi methods, offering limited quantitative evidence on role-specific labor-market demands, causal relationships among competencies, or experience-based perceptual differences. This study presents a preliminary, data-driven competency-mapping study for modular construction designers by integrating BERTopic, Ward clustering, CVR, Bayesian BWM, and Fuzzy DEMATEL. Applied to 243 job postings from six countries, the text-mining stage identifies a candidate competency structure of 3 domains, 9 categories, and 36 performance statements. This candidate structure was then examined through an exploratory survey of 30 Korean respondents. The results suggest that Codes and Compliance represents the most clearly recognized high-consensus competency area within this local validation sample, whereas Modular Construction shows an indicative experience-related divergence in perceived causal position. Given the small and uneven subgroup sample and the formative state of Korea’s modular construction industry, the findings should be interpreted as preliminary evidence rather than as a validated competency framework or a confirmed expert–novice model. The study contributes a reproducible mixed-method workflow, a candidate competency map, and an illustrative maturity prototype for future validation and refinement.
- 21 May 2026
- Published by MDPI AG in Sustainability
- Vol. 18 (10) , 5212
Open AccessA Preliminary Data-Driven Competency Mapping Study for Modular Construction Designers: Exploratory Korean Validation Using Bayesian BWM and Fuzzy DEMATEL
Modular construction advances sustainability and is reshaping designer competencies, making workforce development critical to industry transition. Existing competency models rely mainly on expert interviews and Delphi methods, offering limited quantitative evidence on role-specific labor-market demands, causal relationships among competencies, or experience-based perceptual differences. This study presents a preliminary, data-driven competency-mapping study for modular construction designers by integrating BERTopic, Ward clustering, CVR, Bayesian BWM, and Fuzzy DEMATEL. Applied to 243 job postings from six countries, the text-mining stage identifies a candidate competency structure of 3 domains, 9 categories, and 36 performance statements. This candidate structure was then examined through an exploratory survey of 30 Korean respondents. The results suggest that Codes and Compliance represents the most clearly recognized high-consensus competency area within this local validation sample, whereas Modular Construction shows an indicative experience-related divergence in perceived causal position. Given the small and uneven subgroup sample and the formative state of Korea’s modular construction industry, the findings should be interpreted as preliminary evidence rather than as a validated competency framework or a confirmed expert–novice model. The study contributes a reproducible mixed-method workflow, a candidate competency map, and an illustrative maturity prototype for future validation and refinement.
- Open Access
- 4 February 2026
- Published by Elsevier in Results in Engineering
- Vol. 29
Physics-regularized deep learning framework for floor impact sound prediction in residential buildings: A civil engineering approach
- 4 February 2026
- Published by Elsevier in Results in Engineering
- Vol. 29
Open AccessPhysics-regularized deep learning framework for floor impact sound prediction in residential buildings: A civil engineering approach
- Top Cited PapersOpen Access
- 4 August 2025
- Published by MDPI AG in Sustainability
- Vol. 17 (15) , 7072
TOPSIS and AHP-Based Multi-Criteria Decision-Making Approach for Evaluating Redevelopment in Old Residential Projects
This research aims to identify and prioritize key planning elements for the redevelopment of such housing complexes by incorporating perspectives from both experts (supply-side) and residents (demand-side). To achieve this, a hybrid multi-criteria decision-making framework was developed by integrating the Analytic Hierarchy Process (AHP) and the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS). A total of 25 planning elements were identified through Focus Group Interviews and organized into five domains: legal and institutional reforms, project feasibility, residential conditions, social integration, and complex design. The AHP was used to assess the relative importance of each element based on responses from 30 experts and 130 residents. The analysis revealed a clear divergence in priorities: experts emphasized feasibility and regulatory considerations, while residents prioritized livability and spatial quality. Subsequently, the TOPSIS method was applied to evaluate four real-world redevelopment cases. From the supply-side perspective, Seoul A District received the highest score (0.58), whereas from the demand-side perspective, Gyeonggi D District ranked highest (0.69), illustrating the differing priorities of stakeholders. Overall, Gyeonggi D District emerged as the most favorable option in the combined evaluation. This research contributes a structured and inclusive decision-making framework for the regeneration of public housing. By explicitly comparing and quantifying the contrasting preferences of key stakeholders, it underscores the critical need to balance technical feasibility with resident-centered values in future redevelopment initiatives.
- 4 August 2025
- Published by MDPI AG in Sustainability
- Vol. 17 (15) , 7072
Top Cited PapersOpen AccessTOPSIS and AHP-Based Multi-Criteria Decision-Making Approach for Evaluating Redevelopment in Old Residential Projects
This research aims to identify and prioritize key planning elements for the redevelopment of such housing complexes by incorporating perspectives from both experts (supply-side) and residents (demand-side). To achieve this, a hybrid multi-criteria decision-making framework was developed by integrating the Analytic Hierarchy Process (AHP) and the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS). A total of 25 planning elements were identified through Focus Group Interviews and organized into five domains: legal and institutional reforms, project feasibility, residential conditions, social integration, and complex design. The AHP was used to assess the relative importance of each element based on responses from 30 experts and 130 residents. The analysis revealed a clear divergence in priorities: experts emphasized feasibility and regulatory considerations, while residents prioritized livability and spatial quality. Subsequently, the TOPSIS method was applied to evaluate four real-world redevelopment cases. From the supply-side perspective, Seoul A District received the highest score (0.58), whereas from the demand-side perspective, Gyeonggi D District ranked highest (0.69), illustrating the differing priorities of stakeholders. Overall, Gyeonggi D District emerged as the most favorable option in the combined evaluation. This research contributes a structured and inclusive decision-making framework for the regeneration of public housing. By explicitly comparing and quantifying the contrasting preferences of key stakeholders, it underscores the critical need to balance technical feasibility with resident-centered values in future redevelopment initiatives.
- Open Access
Deriving the Importance of Defects in Multi-Unit Residential Buildings Using the Analytic Hierarchy Process Method
Defects in apartment buildings significantly impact the convenience and safety of residents, and their prevalence has been steadily increasing. This study prioritizes the key defects in apartment buildings to enhance quality management. The primary causes of defects were identified by focusing on frequently occurring issues such as tile installation, flooring, wallpaper, PL windows, and kitchen furniture. A literature review was conducted to analyze the main types of defects, and expert focus group interviews were held to investigate the causes of defects and potential countermeasures. Following this, the analytic hierarchy process was employed to assess the relative importance of these defects and establish their prioritization. The findings indicated that structural issues and material-related factors, particularly flooring and window installation, were the primary causes. Based on these insights, this study proposes a strategic approach to improving quality management in apartment buildings. This research serves as a valuable reference for developers, contractors, and policymakers in defect prevention and management.
Open AccessDeriving the Importance of Defects in Multi-Unit Residential Buildings Using the Analytic Hierarchy Process Method
Defects in apartment buildings significantly impact the convenience and safety of residents, and their prevalence has been steadily increasing. This study prioritizes the key defects in apartment buildings to enhance quality management. The primary causes of defects were identified by focusing on frequently occurring issues such as tile installation, flooring, wallpaper, PL windows, and kitchen furniture. A literature review was conducted to analyze the main types of defects, and expert focus group interviews were held to investigate the causes of defects and potential countermeasures. Following this, the analytic hierarchy process was employed to assess the relative importance of these defects and establish their prioritization. The findings indicated that structural issues and material-related factors, particularly flooring and window installation, were the primary causes. Based on these insights, this study proposes a strategic approach to improving quality management in apartment buildings. This research serves as a valuable reference for developers, contractors, and policymakers in defect prevention and management.
- Open Access
- 25 May 2024
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 28 (8) , 3057-3073
Construction Safety Innovation and Barriers in Different Company Types and Sizes: A Survey in Vietnam
- 25 May 2024
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 28 (8) , 3057-3073
Open AccessConstruction Safety Innovation and Barriers in Different Company Types and Sizes: A Survey in Vietnam
- Open Access
Risk Evaluation of Radioactive Concrete Structure Decommissioning in Nuclear Power Plants Using Fuzzy-AHP
Over 50% of nuclear power plants (NPPs) worldwide have operated for over three decades, leading to a surge in decommissioning projects. This study addresses the gap in current guidelines by analyzing risks in nuclear decommissioning. Using the fuzzy-AHP technique, tasks within dismantling radioactive concrete structures are prioritized. Findings reveal structural and human-related risks across five main cutting tasks. Collision emerges as a significant concern, particularly during wire saw installation and concrete block hoisting hole creation. Subcategory risk priorities highlight variations in risk across tasks, with jamming, falling, and falling objects identified as top concerns during wire saw transportation. This study emphasizes the importance of comprehensive risk assessment in enhancing safety during decommissioning. It underscores the need to consider both physical risks and risks to personnel throughout the process. By prioritizing safety, stakeholders can ensure worker safety and operational efficiency while minimizing hazards. This research contributes to standardized safety protocols for nuclear decommissioning worldwide, aligning with sustainable energy practices. The outcomes offer practical insights for safety manual development and decision-making processes. This study represents progress in ensuring safety during nuclear decommissioning, paving the way for further refinement of safety protocols and guidelines tailored to decommissioning sites.
Open AccessRisk Evaluation of Radioactive Concrete Structure Decommissioning in Nuclear Power Plants Using Fuzzy-AHP
Over 50% of nuclear power plants (NPPs) worldwide have operated for over three decades, leading to a surge in decommissioning projects. This study addresses the gap in current guidelines by analyzing risks in nuclear decommissioning. Using the fuzzy-AHP technique, tasks within dismantling radioactive concrete structures are prioritized. Findings reveal structural and human-related risks across five main cutting tasks. Collision emerges as a significant concern, particularly during wire saw installation and concrete block hoisting hole creation. Subcategory risk priorities highlight variations in risk across tasks, with jamming, falling, and falling objects identified as top concerns during wire saw transportation. This study emphasizes the importance of comprehensive risk assessment in enhancing safety during decommissioning. It underscores the need to consider both physical risks and risks to personnel throughout the process. By prioritizing safety, stakeholders can ensure worker safety and operational efficiency while minimizing hazards. This research contributes to standardized safety protocols for nuclear decommissioning worldwide, aligning with sustainable energy practices. The outcomes offer practical insights for safety manual development and decision-making processes. This study represents progress in ensuring safety during nuclear decommissioning, paving the way for further refinement of safety protocols and guidelines tailored to decommissioning sites.