Mei Huang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Mei Huang has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
- Jiuchun Jiang
School of Electrical Engineering, Beijing Jiaotong University, Beijing 100044, China
4 shared publications - Weige Zhang
National Active Distribution Network Technology Research Center (NANTEC), Beijing Jiaotong University, Beijing 100044, China
4 shared publications - Huang Wang
State Grid Ganxi Electric Power Supply Company, Xinyu 338025, China
2 shared publications - Yan Bao
School of Electrical Engineering, Beijing Jiaotong University, Beijing 100044, China
2 shared publications - Yian Yan
National Active Distribution Network Technology Research Center (NANTEC), Beijing Jiaotong University, Beijing 100044, China
2 shared publications - Le Yi Wang
Department of Electrical and Computer Engineering, Wayne State University, Detroit, MI, USA
1 shared publication
Latest Publications
- Open Access
Research on Configuration Methods of Battery Energy Storage System for Pure Electric Bus Fast Charging Station
With the pervasiveness of electric vehicles and an increased demand for fast charging, stationary high-power fast-charging is becoming more widespread, especially for the purpose of serving pure electric buses (PEBs) with large-capacity onboard batteries. This has resulted in a huge distribution capacity demand. However, the distribution capacity is limited, and in some urban areas the cost of expanding the electric network capacity is very high. In this paper, three battery energy storage system (BESS) integration methods—the AC bus, each charging pile, or DC bus—are considered for the suppression of the distribution capacity demand according to the proposed charging topologies of a PEB fast-charging station. On the basis of linear programming theory, an evaluation model was established that consider the influencing factors of the configuration: basic electricity fee, electricity cost, cost of the energy storage system, costs of transformer and converter equipment, and electric energy loss. Then, a case simulation is presented using realistic operation data, and an economic comparison of the three configurations is provided. An analysis of the impacts of each influence factor in the case study is discussed to verify the case results. The numerical results indicate that the appropriate BESS configuration can significantly reduce the distribution demand and stationary cost synchronously.
Open AccessResearch on Configuration Methods of Battery Energy Storage System for Pure Electric Bus Fast Charging Station
With the pervasiveness of electric vehicles and an increased demand for fast charging, stationary high-power fast-charging is becoming more widespread, especially for the purpose of serving pure electric buses (PEBs) with large-capacity onboard batteries. This has resulted in a huge distribution capacity demand. However, the distribution capacity is limited, and in some urban areas the cost of expanding the electric network capacity is very high. In this paper, three battery energy storage system (BESS) integration methods—the AC bus, each charging pile, or DC bus—are considered for the suppression of the distribution capacity demand according to the proposed charging topologies of a PEB fast-charging station. On the basis of linear programming theory, an evaluation model was established that consider the influencing factors of the configuration: basic electricity fee, electricity cost, cost of the energy storage system, costs of transformer and converter equipment, and electric energy loss. Then, a case simulation is presented using realistic operation data, and an economic comparison of the three configurations is provided. An analysis of the impacts of each influence factor in the case study is discussed to verify the case results. The numerical results indicate that the appropriate BESS configuration can significantly reduce the distribution demand and stationary cost synchronously.
- Open Access
- 24 July 2018
- Published by MDPI AG in Applied Sciences
- Vol. 8 (8) , 1212
Research on Power Demand Suppression Based on Charging Optimization and BESS Configuration for Fast-Charging Stations in Beijing
In order to reduce the recharging time of electric vehicles, the charging power and voltage are becoming higher, which has led to a huge distribution capacity demand and load fluctuation, especially in pure electric buses (PEBs) with large onboard batteries. Based on one actual direct current (DC) fast-charging station, a two-step strategy for the suppression of the peak charging power was developed in this paper, which combined charging optimization and a battery energy storage system (BESS) configuration. A novel charging strategy was proposed, with the PEBs fast-charging during operating hours and normal charging at night, based on a new charging topology. Then, a charging sequence optimization model was established, according to the operation characteristics analysis of the DC fast-charging station. The particle swarm optimization (PSO) algorithm is applied to optimize the charging sequence, which is disordered at present. Linear programming is used to configure the battery energy storage system in order to further decrease the peak charging power and satisfy the distribution capacity constraint. The two-step strategy was simulated by the dataset from the real station. The results show that the distribution capacity demand, charging load fluctuation, electricity cost, and size of the BESS were significantly decreased.
- 24 July 2018
- Published by MDPI AG in Applied Sciences
- Vol. 8 (8) , 1212
Open AccessResearch on Power Demand Suppression Based on Charging Optimization and BESS Configuration for Fast-Charging Stations in Beijing
In order to reduce the recharging time of electric vehicles, the charging power and voltage are becoming higher, which has led to a huge distribution capacity demand and load fluctuation, especially in pure electric buses (PEBs) with large onboard batteries. Based on one actual direct current (DC) fast-charging station, a two-step strategy for the suppression of the peak charging power was developed in this paper, which combined charging optimization and a battery energy storage system (BESS) configuration. A novel charging strategy was proposed, with the PEBs fast-charging during operating hours and normal charging at night, based on a new charging topology. Then, a charging sequence optimization model was established, according to the operation characteristics analysis of the DC fast-charging station. The particle swarm optimization (PSO) algorithm is applied to optimize the charging sequence, which is disordered at present. Linear programming is used to configure the battery energy storage system in order to further decrease the peak charging power and satisfy the distribution capacity constraint. The two-step strategy was simulated by the dataset from the real station. The results show that the distribution capacity demand, charging load fluctuation, electricity cost, and size of the BESS were significantly decreased.
- Open Access
A Bi-Level Optimization Approach to Charging Load Regulation of Electric Vehicle Fast Charging Stations Based on a Battery Energy Storage System
Fast charging stations enable the high-powered rapid recharging of electric vehicles. However, these stations also face challenges due to power fluctuations, high peak loads, and low load factors, affecting the reliable and economic operation of charging stations and distribution networks. This paper introduces a battery energy storage system (BESS) for charging load control, which is a more user-friendly approach and is more robust to perturbations. With the goals of peak-shaving, total electricity cost reduction, and minimization of variation in the state-of-charge (SOC) range, a BESS-based bi-level optimization strategy for the charging load regulation of fast charging stations is proposed in this paper. At the first level, a day-ahead optimization strategy generates the optimal planned load curve and the deviation band to be used as a reference for ensuring multiple control objectives through linear programming, and even for avoiding control failure caused by insufficient BESS energy. Based on this day-ahead optimal plan, at a second level, real-time rolling optimization converts the control process to a multistage decision-making problem. The predictive control-based real-time rolling optimization strategy in the proposed model was used to achieve the above control objectives and maintain battery life. Finally, through a horizontal comparison of two control approaches in each case study, and a longitudinal comparison of the control robustness against different degrees of load disturbances in three cases, the results indicated that the proposed control strategy was able to significantly improve the charging load characteristics, even with large disturbances. Meanwhile, the proposed approach ensures the least amount of variation in the range of battery SOC and reduces the total electricity cost, which will be of a considerable benefit to station operators.
Open AccessA Bi-Level Optimization Approach to Charging Load Regulation of Electric Vehicle Fast Charging Stations Based on a Battery Energy Storage System
Fast charging stations enable the high-powered rapid recharging of electric vehicles. However, these stations also face challenges due to power fluctuations, high peak loads, and low load factors, affecting the reliable and economic operation of charging stations and distribution networks. This paper introduces a battery energy storage system (BESS) for charging load control, which is a more user-friendly approach and is more robust to perturbations. With the goals of peak-shaving, total electricity cost reduction, and minimization of variation in the state-of-charge (SOC) range, a BESS-based bi-level optimization strategy for the charging load regulation of fast charging stations is proposed in this paper. At the first level, a day-ahead optimization strategy generates the optimal planned load curve and the deviation band to be used as a reference for ensuring multiple control objectives through linear programming, and even for avoiding control failure caused by insufficient BESS energy. Based on this day-ahead optimal plan, at a second level, real-time rolling optimization converts the control process to a multistage decision-making problem. The predictive control-based real-time rolling optimization strategy in the proposed model was used to achieve the above control objectives and maintain battery life. Finally, through a horizontal comparison of two control approaches in each case study, and a longitudinal comparison of the control robustness against different degrees of load disturbances in three cases, the results indicated that the proposed control strategy was able to significantly improve the charging load characteristics, even with large disturbances. Meanwhile, the proposed approach ensures the least amount of variation in the range of battery SOC and reduces the total electricity cost, which will be of a considerable benefit to station operators.
- Open Access
Optimal Scheduling of a Battery Energy Storage System with Electric Vehicles’ Auxiliary for a Distribution Network with Renewable Energy Integration
With global conventional energy depletion, as well as environmental pollution, utilizing renewable energy for power supply is the only way for human beings to survive. Currently, distributed generation incorporated into a distribution network has become the new trend, with the advantages of controllability, flexibility and tremendous potential. However, the fluctuation of distributed energy resources (DERs) is still the main concern for accurate deployment. Thus, a battery energy storage system (BESS) has to be involved to mitigate the bad effects of DERs’ integration. In this paper, optimal scheduling strategies for BESS operation have been proposed, to assist with consuming the renewable energy, reduce the active power loss, alleviate the voltage fluctuation and minimize the electricity cost. Besides, the electric vehicles (EVs) considered as the auxiliary technique are also introduced to attenuate the DERs’ influence. Moreover, both day-ahead and real-time operation scheduling strategies were presented under the consideration with the constraints of BESS and the EVs’ operation, and the optimization was tackled by a fuzzy mathematical method and an improved particle swarm optimization (IPSO) algorithm. Furthermore, the test system for the proposed strategies is a real distribution network with renewable energy integration. After simulation, the proposed scheduling strategies have been verified to be extremely effective for the enhancement of the distribution network characteristics.
Open AccessOptimal Scheduling of a Battery Energy Storage System with Electric Vehicles’ Auxiliary for a Distribution Network with Renewable Energy Integration
With global conventional energy depletion, as well as environmental pollution, utilizing renewable energy for power supply is the only way for human beings to survive. Currently, distributed generation incorporated into a distribution network has become the new trend, with the advantages of controllability, flexibility and tremendous potential. However, the fluctuation of distributed energy resources (DERs) is still the main concern for accurate deployment. Thus, a battery energy storage system (BESS) has to be involved to mitigate the bad effects of DERs’ integration. In this paper, optimal scheduling strategies for BESS operation have been proposed, to assist with consuming the renewable energy, reduce the active power loss, alleviate the voltage fluctuation and minimize the electricity cost. Besides, the electric vehicles (EVs) considered as the auxiliary technique are also introduced to attenuate the DERs’ influence. Moreover, both day-ahead and real-time operation scheduling strategies were presented under the consideration with the constraints of BESS and the EVs’ operation, and the optimization was tackled by a fuzzy mathematical method and an improved particle swarm optimization (IPSO) algorithm. Furthermore, the test system for the proposed strategies is a real distribution network with renewable energy integration. After simulation, the proposed scheduling strategies have been verified to be extremely effective for the enhancement of the distribution network characteristics.