IGIan B. Gomes

Ian B. Gomes

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Ian B. Gomes has a total of 4 co-authors. Here are the top co-authors by number of shared publications:

  • Antonio Carlos Marques Alvim

    Programa de Engenharia Nuclear, COPPE, Universidade Federal do Rio de Janeiro, Av. Horácio Macedo 2030, Sala G-206, Cidade Universitária, Ilha do Fundão, 21941-972 Rio de Janeiro, RJ, BRAZIL

    1 shared publication
  • M. A. Talarico

    COPPE, Federal University of Rio de Janeiro, Graduate Program of Nuclear Engineering, Av. Horácio Macedo 2030, Bloco G, Sala 206, Rio de Janeiro, RJ 21941-914, Brazil

    1 shared publication
  • P. F. Frutuoso e Melo

    Programa de Engenharia Nuclear, COPPE, Universidade Federal do Rio de Janeiro, Av. Horácio Macedo 2030, Sala G-206, Cidade Universitária, Ilha do Fundão, 21941-972 Rio de Janeiro, RJ, BRAZIL

    1 shared publication
  • Pedro L. Cruz Saldanha

    CGRC/DRS, Comissão Nacional de Energia Nuclear, 22290-901, Brazil

    1 shared publication

Latest Publications

  • Comparison of Two Methods for Obtaining the Variabilities in a FRAM Model of a Combined Nuclear Facility Project

    by M. A. Talarico, P. F. F. Frutuoso e Melo, I. B. Gomes

    This study presents a method for inferring the potential variabilities that need to be computed in a model developed using the Functional Resonance Analysis Method (FRAM) by means of adapting a questionnaire used in the Resilience Analysis Grid method. The proposed method, called in this study the indirect method, is compared to the technique prescribed in FRAM to acquire variabilities for each system’s functions in the specific case of a FRAM model for obtaining a nuclear-powered submarine and its land support facility, hereinafter called the Combined Nuclear Facility (CNF). It should be noted that this model encompasses the design, the nuclear licensing process, and the construction of the CNF and aims to help to point out weaknesses in nuclear safety. The results show that 55.17% of the variability data obtained from both methods was identical (by exploratory data analysis), and a chi-square test of independence, conducted between method type and variability category, displayed that there was not a statistically significant association between method type and variability category. Thus, the null hypothesis cannot be rejected, and variability category and method type are independent of each other. Additionally, a qualitative comparison of a FRAM instantiation is presented using variabilities from the two methods, which resulted in small differences that apparently do not affect the overall result of the FRAM analysis. Therefore, it is concluded that the indirect method used to obtain information on the variability of functions of the model for obtaining the CNF is adequate.


  • Open Access

    A Methodology for Optimizing the Management of Spent Fuel of Nuclear Power Plants Using Dry Storage Casks

    by Ian B. Gomes, Pedro L. Cruz Saldanha, Antonio Carlos M. Alvim

    The management of spent nuclear fuel assemblies of nuclear reactors is a priority subject among member states of the International Atomic Energy Agency. For the majority of these countries, the destination of such fuel assemblies is a decision that is yet to be made and the “wait-and-see” policy is thus adopted by them. In this case, the irradiated fuel is stored in on-site spent fuel pools until the power plant is decommissioned or, when there is no more racking space in the pool, they are stored in intermediate storage facilities, which can be another pool or dry storage systems, until the final decision is made. The objective of this study is to propose a methodology that, using optimization algorithms, determines the ideal time for removal of the fuel assemblies from the spent fuel pool and to place them into dry casks for intermediate storage. In this scenario, the methodology allows for the optimal dimensioning of the designed spent fuel pools and the casks’ characteristics, thus reducing the final costs for purchasing new Nuclear Power Plants (NPP), as the size and safety features of the pool could be reduced and dry casks, that would be needed anyway after the decommissioning of the plant, could be purchased with optimal costs. To demonstrate the steps involved in the proposed methodology, an example is given, one which uses the Monte Carlo N-Particle code (MCNP) to calculate the shielding requirements for a simplified model of a concrete dry cask. From the given example, it is possible to see that, using real-life data, the proposed methodology can become a valuable tool to help making nuclear energy a more attractive choice costwise.