Yasushi Suzuki
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Yasushi Suzuki has a total of 97 co-authors. Here are the top co-authors by number of shared publications:
- Tetsuhiko Yoshimura
Faculty of Life and Environmental Sciences, Shimane University, Matsue 690-8504, Japan
4 shared publications D. Miyata
3 shared publicationsJ. Gotou
3 shared publications- Kazuhiro Aruga
Utsunomiya University
3 shared publications Keisuke Toyama
The University of Tokyo Chiba Forest, Graduate School of Agricultural and Life Sciences, The University of Tokyo
3 shared publicationsKouichi Kanzaki
Prof. Emeritus, Faculty of Agric., Kyoto Univ., Kyoto 606-01, Japan
3 shared publications
Latest Publications
- Open Access
Application of System Dynamics Simulation to Assess System Productivity of Forest Harvesting Systems: A Case Study from Japan
Most forest harvesting operations are performed using two or more forestry machines in combination; in the typical forest production system in steep terrain in Japan, there are four production processes: felling, yarding, processing, and forwarding. It is essential to evaluate the overall productivity of such combined production systems, but the calculation method that indicates the productivity has not been fully established. In this study, we built simulation models of serial, parallel, and sequential production systems by using system dynamics to evaluate their productivity regarding the combined machine productivity (CMP) and combined labor productivity (CLP) indices. Comparing the three types of forest harvesting systems in Japan, the parallel production system had the highest CMP, while the serial production system had the highest CLP; the sequential production system lay between the serial and parallel production systems in terms of CMP and CLP. The overall productivity of Japanese forest production systems was lower than that of Central Europe, where processor tower yarders (PTYs) are used. Thus, the CLP of Japanese forest production systems was improved by 12.8 to 26.5% by incorporating the concept of a PTY, and it can be further improved by eliminating the forwarding process.
Open AccessApplication of System Dynamics Simulation to Assess System Productivity of Forest Harvesting Systems: A Case Study from Japan
Most forest harvesting operations are performed using two or more forestry machines in combination; in the typical forest production system in steep terrain in Japan, there are four production processes: felling, yarding, processing, and forwarding. It is essential to evaluate the overall productivity of such combined production systems, but the calculation method that indicates the productivity has not been fully established. In this study, we built simulation models of serial, parallel, and sequential production systems by using system dynamics to evaluate their productivity regarding the combined machine productivity (CMP) and combined labor productivity (CLP) indices. Comparing the three types of forest harvesting systems in Japan, the parallel production system had the highest CMP, while the serial production system had the highest CLP; the sequential production system lay between the serial and parallel production systems in terms of CMP and CLP. The overall productivity of Japanese forest production systems was lower than that of Central Europe, where processor tower yarders (PTYs) are used. Thus, the CLP of Japanese forest production systems was improved by 12.8 to 26.5% by incorporating the concept of a PTY, and it can be further improved by eliminating the forwarding process.
- Open Access
- 10 November 2023
- Published by University of Zagreb, Faculty of Forestry and Wood Technology in Croatian journal of forest engineering
- Vol. 45 (1) , 217-236
Overview of Global Long-Distance Road Transportation of Industrial Roundwood
The aim of the study was to provide a comprehensive overview of global long-distance road transportation of industrial roundwood. The study focused on the maximum gross vehicle weight (GVW) limits allowed with different timber truck configurations, typical payloads in timber trucking, the road transportation share of the total industrial roundwood long-distance transportation volume, and the average long-distance transportation distances and costs of industrial roundwood. The study was carried out as a questionnaire survey. The questionnaire was sent to timber transportation logistics experts and research scientists in the 30 countries with the largest industrial roundwood removals in Europe, as well as selected major forestry countries in the world (Argentina, Australia, Brazil, Canada, Chile, China, Japan, New Zealand, South Africa, Türkiye, the United States of America and Uruguay) in February 2022, and closed in May 2022. A total of 31 countries took part in the survey. The survey illustrated that timber trucking was the main long-distance transportation method of industrial roundwood in almost every country surveyed. Road transportation averaged 89% of the total industrial roundwood long-distance transportation volume. Timber truck configurations of 4 to 9 axles with GVW limits of around 30 tonnes to over 70 tonnes were most commonly used. The results indicated that higher GVW limits allowed significantly higher payloads in timber trucking, with the lowest payloads at less than 25 tonnes, and the highest payloads more than 45 tonnes. The average road transportation distance with industrial roundwood was 128 km, and the average long-distance transportation cost in timber trucking was €11.1 per tonne of timber transported. In the entire survey material, there was a direct relationship between transportation distance and transportation costs and an inverse relationship between maximum GVW limits and transportation costs. Consequently, in order to reduce transportation costs, it is essential to maximise payloads (within legal limits) and minimise haul distances. Several measures to increase cost- and energy-efficiency, and to reduce greenhouse gas emissions in road transportation logistics, are discussed in the paper. On the basis of the survey, it is recommended that up-to-date statistical data and novel research studies on the long-distance transportation of industrial roundwood be conducted in some countries in the future.
- 10 November 2023
- Published by University of Zagreb, Faculty of Forestry and Wood Technology in Croatian journal of forest engineering
- Vol. 45 (1) , 217-236
Open AccessOverview of Global Long-Distance Road Transportation of Industrial Roundwood
The aim of the study was to provide a comprehensive overview of global long-distance road transportation of industrial roundwood. The study focused on the maximum gross vehicle weight (GVW) limits allowed with different timber truck configurations, typical payloads in timber trucking, the road transportation share of the total industrial roundwood long-distance transportation volume, and the average long-distance transportation distances and costs of industrial roundwood. The study was carried out as a questionnaire survey. The questionnaire was sent to timber transportation logistics experts and research scientists in the 30 countries with the largest industrial roundwood removals in Europe, as well as selected major forestry countries in the world (Argentina, Australia, Brazil, Canada, Chile, China, Japan, New Zealand, South Africa, Türkiye, the United States of America and Uruguay) in February 2022, and closed in May 2022. A total of 31 countries took part in the survey. The survey illustrated that timber trucking was the main long-distance transportation method of industrial roundwood in almost every country surveyed. Road transportation averaged 89% of the total industrial roundwood long-distance transportation volume. Timber truck configurations of 4 to 9 axles with GVW limits of around 30 tonnes to over 70 tonnes were most commonly used. The results indicated that higher GVW limits allowed significantly higher payloads in timber trucking, with the lowest payloads at less than 25 tonnes, and the highest payloads more than 45 tonnes. The average road transportation distance with industrial roundwood was 128 km, and the average long-distance transportation cost in timber trucking was €11.1 per tonne of timber transported. In the entire survey material, there was a direct relationship between transportation distance and transportation costs and an inverse relationship between maximum GVW limits and transportation costs. Consequently, in order to reduce transportation costs, it is essential to maximise payloads (within legal limits) and minimise haul distances. Several measures to increase cost- and energy-efficiency, and to reduce greenhouse gas emissions in road transportation logistics, are discussed in the paper. On the basis of the survey, it is recommended that up-to-date statistical data and novel research studies on the long-distance transportation of industrial roundwood be conducted in some countries in the future.
- Open Access
Assessing the Productivity of Forest Harvesting Systems Using a Combination of Forestry Machines in Steep Terrain
Despite similarly steep terrain, the productivity of forest harvesting operations in Japan is lower than in Central Europe. Harvesting systems in Japan are typically characterized by the four production processes of felling, yarding, processing, and forwarding, whereas in Central Europe they have mostly been reduced to just two through the use of a PTY (Processor Tower Yarder). This study investigated the number of production processes as a reason for the relatively lower productivity of forest harvesting in Japan using the Combined Machine Productivity (CMP) and Combined Labor Productivity (CLP) indices. The CMP and CLP were 1.81 m3/h and 0.45 m3/worker/h, respectively, for a parallel production model based on a typical Japanese forest harvesting system in Japan. The CMP and CLP values were improved to 2.51 m3/h and 0.63 m3/worker/h, respectively, when the forwarding process was removed from the model. The CMP and CLP values were further improved to 3.04 m3/h and 0.76 m3/worker/h, respectively, when yarding and processing were integrated into a single process. Reducing the number of the production processes can therefore improve the productivity of forest harvesting operations in Japan.
Open AccessAssessing the Productivity of Forest Harvesting Systems Using a Combination of Forestry Machines in Steep Terrain
Despite similarly steep terrain, the productivity of forest harvesting operations in Japan is lower than in Central Europe. Harvesting systems in Japan are typically characterized by the four production processes of felling, yarding, processing, and forwarding, whereas in Central Europe they have mostly been reduced to just two through the use of a PTY (Processor Tower Yarder). This study investigated the number of production processes as a reason for the relatively lower productivity of forest harvesting in Japan using the Combined Machine Productivity (CMP) and Combined Labor Productivity (CLP) indices. The CMP and CLP were 1.81 m3/h and 0.45 m3/worker/h, respectively, for a parallel production model based on a typical Japanese forest harvesting system in Japan. The CMP and CLP values were improved to 2.51 m3/h and 0.63 m3/worker/h, respectively, when the forwarding process was removed from the model. The CMP and CLP values were further improved to 3.04 m3/h and 0.76 m3/worker/h, respectively, when yarding and processing were integrated into a single process. Reducing the number of the production processes can therefore improve the productivity of forest harvesting operations in Japan.
- Open Access
Verification of Structural Strength of Spur Roads Constructed Using a Locally Developed Method for Mountainous Areas: A Case Study in Kochi University Forest, Japan
Owing to steep terrain and complicated geology, constructing spur roads with low cost and sufficient strength is crucial for sustainable forest management in Japan. The Shimanto method was developed for making narrow spur roads robust against collapse around the 2000s in the Shimanto geology belt area, where the strata were slanted because of an accretion wedge. Kochi University Forest adopted this method and constructed some routes of spur roads in the 2010s. In the present study, we assessed the performance of this method in terms of the roadbed strength and bearing capacity. Two routes were selected, namely Sites 1 and 2, constructed in 2013–2016 and 2019–2021, and tested in 2017 and 2021, respectively. The roadbed strength was measured up to a depth of 100 cm using a handy dynamic cone penetrometer with a rammer of 5 kg. The results showed that the roadbed strength of the embankment side was weaker than that of the cut slope side, although the method was supposed to compact the roadbeds equally over the road width. However, most of the roadbeds had sufficient strength; the younger ones tended to have lower strength than the older ones, and the same tendency was observed for the bearing capacity. It was suggested that the soil under the road width should be excavated more widely toward the cut slope side before compaction.
Open AccessVerification of Structural Strength of Spur Roads Constructed Using a Locally Developed Method for Mountainous Areas: A Case Study in Kochi University Forest, Japan
Owing to steep terrain and complicated geology, constructing spur roads with low cost and sufficient strength is crucial for sustainable forest management in Japan. The Shimanto method was developed for making narrow spur roads robust against collapse around the 2000s in the Shimanto geology belt area, where the strata were slanted because of an accretion wedge. Kochi University Forest adopted this method and constructed some routes of spur roads in the 2010s. In the present study, we assessed the performance of this method in terms of the roadbed strength and bearing capacity. Two routes were selected, namely Sites 1 and 2, constructed in 2013–2016 and 2019–2021, and tested in 2017 and 2021, respectively. The roadbed strength was measured up to a depth of 100 cm using a handy dynamic cone penetrometer with a rammer of 5 kg. The results showed that the roadbed strength of the embankment side was weaker than that of the cut slope side, although the method was supposed to compact the roadbeds equally over the road width. However, most of the roadbeds had sufficient strength; the younger ones tended to have lower strength than the older ones, and the same tendency was observed for the bearing capacity. It was suggested that the soil under the road width should be excavated more widely toward the cut slope side before compaction.
- Open Access
- 1 December 2021
- Published by The Japanese Forest Society in Journal of the Japanese Forest Society
- Vol. 103 (6) , 449-454
Development of a Geographic Information System-Based Method to Select Areas for Simultaneous Cutting of Coniferous and Broadleaved Stands
木質バイオマス発電用材の供給を目的として既報で構築した架線集材による針・広葉樹林の同時伐採モデルをGIS(地理情報システム)に適用し,地理空間上でこの方式の適地を特定する手法の開発を,高知市土佐山地区を対象として試みた。手順は,1)架線架設に適した一定以上の面積の谷形状の区域を表す集水域ポリゴンにより対象地域の林分を区分し,2)トラック運材を考慮し幅員3 mの道路に隣接する集水域ポリゴンを抽出した。その後,当該モデルの集材面積を超える集水域ポリゴンのみに分析対象を絞り込み,3)さらに保安林などの伐採制限や樹種・樹齢を考慮して残った集水域ポリゴンのha当たりの収益性を分析した。その結果,4)対象地域で再造林費を賄う以上の収益性が確認された林分1,908 haからの建築用材および燃材としての木質資源の供給可能量は,建築用材153千 m3,燃材154千 tと推算された。
- 1 December 2021
- Published by The Japanese Forest Society in Journal of the Japanese Forest Society
- Vol. 103 (6) , 449-454
Open AccessDevelopment of a Geographic Information System-Based Method to Select Areas for Simultaneous Cutting of Coniferous and Broadleaved Stands
木質バイオマス発電用材の供給を目的として既報で構築した架線集材による針・広葉樹林の同時伐採モデルをGIS(地理情報システム)に適用し,地理空間上でこの方式の適地を特定する手法の開発を,高知市土佐山地区を対象として試みた。手順は,1)架線架設に適した一定以上の面積の谷形状の区域を表す集水域ポリゴンにより対象地域の林分を区分し,2)トラック運材を考慮し幅員3 mの道路に隣接する集水域ポリゴンを抽出した。その後,当該モデルの集材面積を超える集水域ポリゴンのみに分析対象を絞り込み,3)さらに保安林などの伐採制限や樹種・樹齢を考慮して残った集水域ポリゴンのha当たりの収益性を分析した。その結果,4)対象地域で再造林費を賄う以上の収益性が確認された林分1,908 haからの建築用材および燃材としての木質資源の供給可能量は,建築用材153千 m3,燃材154千 tと推算された。
- Open Access
- 19 July 2019
- Published by University of Zagreb, Faculty of Forestry and Wood Technology in Croatian journal of forest engineering
- Vol. 40 (2) , 365-375
Assessment of Broad-Leaved Forest Stand Management
There are many broad-leaved forests in Japan that were formerly managed for charcoal production, which have been abandoned for decades. Appropriate thinning can revitalize these forests if the cost balance of the management is positive. Two critical elements are the construction of spur roads to facilitate mechanized harvesting operations and management planning that considers stand properties such as the growing stock, species, and tree size distribution. We surveyed three abandoned former broad-leaved coppice stands; one coastal, one cool temperate and one warm temperate. The stock in all three stands exceeded 300 m3 ha-1, two- to three-fold the official forest registry data estimates. The dominant species in terms of tree numbers are Castanopsis sieboldii, Pieris japonica, and Quercus glauca. Medium-sized trees involve those well suited for firewood, i.e., Quercus acuta, Quercus glauca, Quercus serrata, etc. Each plot contained a few large trees that potentially have a high market value, e.g., Cinnamomum camphora, Zelkova serrata, Abies firma, etc. The average income from harvested trees was estimated to be 10200 JPY (Japanese Yen) m-3, whereas the thinning costs would be 3200 to 5400 JPY m-3, with the additional spur road construction costs. The management cost balance of a broad-leaved stand in a 60 year rotation was evaluated with both Net Present Value (NPV) (for interest rates of 1, 2, 3, and 4%) and Internal Rate of Return (IRR). This balance was compared with that of a typical plantation stand of Japanese cedar (Cryptomeria japonica) and of a fast-growing plantation stand of Chinese fir (Cunninghamia lanceolata). The estimated NPVs were largest for the fast-growing plantation stand, second largest for the typical plantation stand, and lowest for the broad-leaved stand with a NPV interest rate of 1 + %. However, the IRR of the broad-leaved stand was the highest, followed by that of the fast-growing plantation stand, while the IRR of the typical plantation stand was the lowest. This order was the same for NPVs assuming higher interest rates. 1 JPY=0.0086 € on April 29, 2019.
- 19 July 2019
- Published by University of Zagreb, Faculty of Forestry and Wood Technology in Croatian journal of forest engineering
- Vol. 40 (2) , 365-375
Open AccessAssessment of Broad-Leaved Forest Stand Management
There are many broad-leaved forests in Japan that were formerly managed for charcoal production, which have been abandoned for decades. Appropriate thinning can revitalize these forests if the cost balance of the management is positive. Two critical elements are the construction of spur roads to facilitate mechanized harvesting operations and management planning that considers stand properties such as the growing stock, species, and tree size distribution. We surveyed three abandoned former broad-leaved coppice stands; one coastal, one cool temperate and one warm temperate. The stock in all three stands exceeded 300 m3 ha-1, two- to three-fold the official forest registry data estimates. The dominant species in terms of tree numbers are Castanopsis sieboldii, Pieris japonica, and Quercus glauca. Medium-sized trees involve those well suited for firewood, i.e., Quercus acuta, Quercus glauca, Quercus serrata, etc. Each plot contained a few large trees that potentially have a high market value, e.g., Cinnamomum camphora, Zelkova serrata, Abies firma, etc. The average income from harvested trees was estimated to be 10200 JPY (Japanese Yen) m-3, whereas the thinning costs would be 3200 to 5400 JPY m-3, with the additional spur road construction costs. The management cost balance of a broad-leaved stand in a 60 year rotation was evaluated with both Net Present Value (NPV) (for interest rates of 1, 2, 3, and 4%) and Internal Rate of Return (IRR). This balance was compared with that of a typical plantation stand of Japanese cedar (Cryptomeria japonica) and of a fast-growing plantation stand of Chinese fir (Cunninghamia lanceolata). The estimated NPVs were largest for the fast-growing plantation stand, second largest for the typical plantation stand, and lowest for the broad-leaved stand with a NPV interest rate of 1 + %. However, the IRR of the broad-leaved stand was the highest, followed by that of the fast-growing plantation stand, while the IRR of the typical plantation stand was the lowest. This order was the same for NPVs assuming higher interest rates. 1 JPY=0.0086 € on April 29, 2019.
- 19 July 2019
- Published by Taylor & Francis in International Journal of Forest Engineering
- Vol. 30 (3) , 174
Introduction for IJFE special issue “productivity and safety of final cutting on mountain forests”
Forest operations in mountain forests need to apply production systems which are adapted to specific local conditions and existing infrastructure while minimizing negative externalities to the envi...
- 19 July 2019
- Published by Taylor & Francis in International Journal of Forest Engineering
- Vol. 30 (3) , 174
Introduction for IJFE special issue “productivity and safety of final cutting on mountain forests”
Forest operations in mountain forests need to apply production systems which are adapted to specific local conditions and existing infrastructure while minimizing negative externalities to the envi...
- 14 February 2019
- Published by Taylor & Francis in International Journal of Forest Engineering
- Vol. 30 (3) , 195-202
Productivity of a harvesting operation for a small clear-cut block by direct grappling using a processor in the Kochi University Forest
A case study was analyzed on productivity of clear cutting conducted by novel logging machines in the Kochi University Forest. A small block (0.15 ha in average) has been clear-cut annually to prepare a practice planting site for the Forest Science Course students. Until 2015, harvesting operations were performed by a small-scale system, such as a winch-mounted mini-forwarder. However, in 2016 an updated system was introduced with a processor head equipped on a base machine of 0.25 m3 bucket size-class and a forwarder with a 3 t loading capacity. A series of operations was conducted with this new system in November 2016, including cutting, logging, processing, bucking, and forwarding. The total productivity was evaluated at over 4 m3/person-day, a significant increase over the former system, at 2 m3/person-day. A critical factor in productivity was extraction by the processor, which was affected by the angle of felled trees relative to a strip road.
- 14 February 2019
- Published by Taylor & Francis in International Journal of Forest Engineering
- Vol. 30 (3) , 195-202
Productivity of a harvesting operation for a small clear-cut block by direct grappling using a processor in the Kochi University Forest
A case study was analyzed on productivity of clear cutting conducted by novel logging machines in the Kochi University Forest. A small block (0.15 ha in average) has been clear-cut annually to prepare a practice planting site for the Forest Science Course students. Until 2015, harvesting operations were performed by a small-scale system, such as a winch-mounted mini-forwarder. However, in 2016 an updated system was introduced with a processor head equipped on a base machine of 0.25 m3 bucket size-class and a forwarder with a 3 t loading capacity. A series of operations was conducted with this new system in November 2016, including cutting, logging, processing, bucking, and forwarding. The total productivity was evaluated at over 4 m3/person-day, a significant increase over the former system, at 2 m3/person-day. A critical factor in productivity was extraction by the processor, which was affected by the angle of felled trees relative to a strip road.
- 1 October 2018
- Published by The Japanese Forest Society in Journal of the Japanese Forest Society
- Vol. 100 (5) , 178-181
Surface Soil Movements in a Plantation Forest of Chinese Fir
- 1 October 2018
- Published by The Japanese Forest Society in Journal of the Japanese Forest Society
- Vol. 100 (5) , 178-181
Surface Soil Movements in a Plantation Forest of Chinese Fir
- 1 January 2017
- Published by The Japanese Forest Society in Journal of the Japanese Forest Society
- Vol. 99 (6) , 266-271
Estimating the Long-term Availability of Unused Materials for Woody Biomass Power Generation in Tochigi Prefecture, Japan
本研究では,栃木県スギ・ヒノキ林分において,木質バイオマス発電のための未利用材供給ポテンシャルと利用可能量を推計し,既存の発電施設への長期的な燃料供給の可能性について検証するとともに,新規発電施設の適地を検討した。その結果,供給ポテンシャルは用材 1,003,745 m3/年,未利用材394,042 t/年と推計され,利用可能量は用材430,561 m3/年,未利用材169,125 t /年と推計された。森林所有者への返却金を考慮した利用可能量を試算した結果,用材102,835 m3/年,未利用材40,110 t /年と減少したが,既存の発電施設が消費する未利用材は35,000 t /年であるため,返却金を考慮した場合でも既存の発電施設における長期的な燃料材需要は賄えることが示唆された。さらに,返却金を考慮した余剰の未利用材利用可能量から,栃木県内の2市で小規模ガス化発電施設の導入可能性が示唆された。
- 1 January 2017
- Published by The Japanese Forest Society in Journal of the Japanese Forest Society
- Vol. 99 (6) , 266-271
Estimating the Long-term Availability of Unused Materials for Woody Biomass Power Generation in Tochigi Prefecture, Japan
本研究では,栃木県スギ・ヒノキ林分において,木質バイオマス発電のための未利用材供給ポテンシャルと利用可能量を推計し,既存の発電施設への長期的な燃料供給の可能性について検証するとともに,新規発電施設の適地を検討した。その結果,供給ポテンシャルは用材 1,003,745 m3/年,未利用材394,042 t/年と推計され,利用可能量は用材430,561 m3/年,未利用材169,125 t /年と推計された。森林所有者への返却金を考慮した利用可能量を試算した結果,用材102,835 m3/年,未利用材40,110 t /年と減少したが,既存の発電施設が消費する未利用材は35,000 t /年であるため,返却金を考慮した場合でも既存の発電施設における長期的な燃料材需要は賄えることが示唆された。さらに,返却金を考慮した余剰の未利用材利用可能量から,栃木県内の2市で小規模ガス化発電施設の導入可能性が示唆された。