SSSergio H. Sphaier

Sergio H. Sphaier

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Sergio H. Sphaier has a total of 9 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Uncertainty Analysis for Inclining Tests

    by Joel S. Sales, Paulo de Tarso T. Esperança, Sergio H. Sphaier, Christiane Machado

    In this paper, we addressed the qualitative consequences on uncertainty for the execution of a inclining test of a Semi-submergible platform with mooring system and risers at production site and compared the results to the ones taken from typical inclining test procedures at sheltered waters, as defined by ASTM F1321. To accomplish that, we applied Uncertainty Analysis according to ISO procedures, by evaluating propagation of uncertainties from the measurements until the final calculations. We discussed the use of measurement devices for the variables of concern and performed some numerical simulations to address the mooring system restoring effects and its implications on uncertainty analysis. We used data from two semi-subs with different displacements and found small influence on final uncertainty from the addition of mooring system and risers. At end, we discussed how new technologies on data acquisition and filtering of signals can become an important tool to help in the safety of the offshore floating production units, by facilitating the verification of the updated center of gravity of them after important interventions.

  • Comprehensive Downtime Analysis of DP-Assisted Offloading Operation of Spread Moored Platforms in Brazilian Waters

    by Diego C. Corrêa, Allan C. de Oliveira, Eduardo A. Tannuri, Sergio H. Sphaier

    Oil offloading from Spread Mooring System (SMS) FPSO is usually done by means of a dynamically positioned shuttle tanker (DPST) in tandem configuration. The ST receives the oil pumped by the FPSO from a bow or stern offloading station, and the operation may take up to 3 days. In order to minimize the risks associated with the operation, the shuttle tanker (ST) should be kept within a safety zone with respect to the FPSO, which is usually given as a minimum distance between the two ships and an aperture angle from the FPSO centerline. In order to guarantee the tanker position during the whole operation, the operation must be performed with tankers provided with DP (dynamic positioning) systems. Since SMS FPSOs may be not aligned to the environmental forces, keeping the shuttle tanker in position may be a hard task for the DP system, depending on the environmental conditions. There are non-rare situations in which the ST must be disconnected and the operation interrupted. The present paper applies a methodology based on static calculation of DP capacity for evaluating the downtime of such offloading operation. The three generations of DP tankers applied in Brazilian waters are considered. Santos and Campos Basin long-term (8-year) environmental conditions (current, wind, local-sea and swell) are used in the downtime calculation. The main objective is to provide a quantitative tool to analyze important parameters of the operation, in order to support some redefinitions in the operational procedure adopted by Petrobras. The main parameters are: the angle of the safe green-zone defined from the FPSO centerline, the installed DP power, the necessity of bow and stern offloading stations in the FPSO, among others. The results indicated that due to the large variation of wave-wind conditions along the year, both offloading stations are indeed necessary, since the ST can avoid the conditions in which it is pushed towards the FPSO. The results also indicated that incrementing the angle that defines the green-zone substantially decreases the offloading downtime. However, such decision also depends on a comprehensive risk analysis, since in that case the ST may be kept in a perpendicular position related to the FPSO. The risk analysis is beyond the scope of the present work. The DP power specified for the ST generations 2 and 3 are shown to be quite adequate, since it is demonstrated that increasing this power will not lead to a substantial reduction in the downtime.