Pramesh Krishnankutty
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Pramesh Krishnankutty has a total of 13 co-authors. Here are the top co-authors by number of shared publications:
Bon-Gang Hwang
Department of Building, National University of Singapore, Singapore, Singapore
2 shared publications- Bon-Gang Hwang
National Univ. of Singapore
2 shared publications Carlos H. Caldas
Department of Civil, Architectural, and Environmental Engineering, University of Texas at Austin, Austin, TX, USA
2 shared publications- Carlos H. Caldas
Editor in Chief. ORCID:
2 shared publications Arjun Shounak
Department of Civil, Architectural and Environmental Engineering, University of Texas at Austin, TX, USA
1 shared publicationDaniel P. de Oliveira
Construction Industry Institute, Austin, TX, USA
1 shared publication
Latest Publications
- 27 May 2019
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 21 (11) , 1115-1129
Utilization of workface planning for the execution of maintenance activities, shutdowns and turnarounds in petrochemical facilities – a case study
Maintenance activities, shutdowns and turnarounds (MST) are essential for the process industry. In fact, MST projects play important roles in maintaining the consistency of plants’ productive capacity thus helping sustain corporate performance. Unfortunately, MST projects often incur significant budget and schedule overruns. This study documents the current state of practice of execution planning for MST projects. It identifies several factors that contribute to MST performance being poor. These factors include inefficiencies in execution planning, communication, scope management, measurement and control and execution safety. Utilizing input from subject matter experts (SMEs), the first part of this study focuses on developing a customized version of Workface Planning (WFP) that would be applicable to MSTs in the petrochemical industry. Once customized, the WFP tools were implemented by several petrochemical facilities. By observing this implementation, the research team was able to assess the existing levels of MST execution planning and management and to discover areas of inefficiency. This study offers ways to optimize the planning practices of executing MST. Petrochemical organizations could use these findings to assess their own current MST execution-planning procedures. This would involve implementing the customized WFP concepts and tools and thereby attain an optimal state of readiness before starting the MST execution phase.
- 27 May 2019
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 21 (11) , 1115-1129
Utilization of workface planning for the execution of maintenance activities, shutdowns and turnarounds in petrochemical facilities – a case study
Maintenance activities, shutdowns and turnarounds (MST) are essential for the process industry. In fact, MST projects play important roles in maintaining the consistency of plants’ productive capacity thus helping sustain corporate performance. Unfortunately, MST projects often incur significant budget and schedule overruns. This study documents the current state of practice of execution planning for MST projects. It identifies several factors that contribute to MST performance being poor. These factors include inefficiencies in execution planning, communication, scope management, measurement and control and execution safety. Utilizing input from subject matter experts (SMEs), the first part of this study focuses on developing a customized version of Workface Planning (WFP) that would be applicable to MSTs in the petrochemical industry. Once customized, the WFP tools were implemented by several petrochemical facilities. By observing this implementation, the research team was able to assess the existing levels of MST execution planning and management and to discover areas of inefficiency. This study offers ways to optimize the planning practices of executing MST. Petrochemical organizations could use these findings to assess their own current MST execution-planning procedures. This would involve implementing the customized WFP concepts and tools and thereby attain an optimal state of readiness before starting the MST execution phase.
- Open Access
- 26 February 2019
- Published by MDPI AG in Sustainability
- Vol. 11 (5) , 1239
Assessing the Implementation of Best Productivity Practices in Maintenance Activities, Shutdowns, and Turnarounds of Petrochemical Plants
This paper describes the development of a method to assess the level of implementation of best productivity practices in the petrochemical industry. The proposed methodology focuses on construction, maintenance activities, shutdowns, and turnarounds. Its novelty and importance are emphasized by the lack of productivity studies that target these types of projects. This article reports the research methodology steps including tool development and detailed case study assessments of projects in Singapore. The approach involved the verification of best productivity practices and the development of an assessment method designed to fit the characteristics of petrochemical projects. The assessment points out productivity practices with low implementation levels and provides recommendations to increase their usage. The results showed that the level of implementation of productivity practices in the petrochemical projects investigated was 68.42%, out of a maximum score of 100%. Practices related to Material Management and Equipment Logistics received the lowest scores and recommendations on how to bridge this productivity practice implementation gap were provided. The adoption of the Best Productivity Practices Implementation Index (BPPII) as a Productivity management tool will help the petrochemical plants to improve productivity in their projects and to be resilient during the pre-planning phase. This should also allow the petrochemical industry to attract more investments and remain competitive in order to be sustainable. The identification and analysis of practices related to maintenance activities, shutdowns, and turnarounds of petrochemical plants will significantly contribute to the body of knowledge on best productivity practice.
- 26 February 2019
- Published by MDPI AG in Sustainability
- Vol. 11 (5) , 1239
Open AccessAssessing the Implementation of Best Productivity Practices in Maintenance Activities, Shutdowns, and Turnarounds of Petrochemical Plants
This paper describes the development of a method to assess the level of implementation of best productivity practices in the petrochemical industry. The proposed methodology focuses on construction, maintenance activities, shutdowns, and turnarounds. Its novelty and importance are emphasized by the lack of productivity studies that target these types of projects. This article reports the research methodology steps including tool development and detailed case study assessments of projects in Singapore. The approach involved the verification of best productivity practices and the development of an assessment method designed to fit the characteristics of petrochemical projects. The assessment points out productivity practices with low implementation levels and provides recommendations to increase their usage. The results showed that the level of implementation of productivity practices in the petrochemical projects investigated was 68.42%, out of a maximum score of 100%. Practices related to Material Management and Equipment Logistics received the lowest scores and recommendations on how to bridge this productivity practice implementation gap were provided. The adoption of the Best Productivity Practices Implementation Index (BPPII) as a Productivity management tool will help the petrochemical plants to improve productivity in their projects and to be resilient during the pre-planning phase. This should also allow the petrochemical industry to attract more investments and remain competitive in order to be sustainable. The identification and analysis of practices related to maintenance activities, shutdowns, and turnarounds of petrochemical plants will significantly contribute to the body of knowledge on best productivity practice.
- 1 October 2018
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 20 (7) , 822-836
Improving labour productivity in process construction maintenance and shutdown/turnaround projects
Construction labour is a critical cost factor which affects the profitability of petrochemical companies and contractors. Improvement in labour productivity is indispensable for the petrochemical industry to achieve sustainable development. However, the industry lacks consensus in measuring labour productivity in construction, maintenance and shutdown/turnaround projects. This engenders a need for developing productivity improvement practices applicable to all projects. This article proposes productivity improvement solutions based on a study conducted on 17 projects at five petrochemical plants in Singapore. This research team developed and used a modified Activity Analysis method suitable to the site conditions and the maintenance and shutdown/turnaround activities which are seldom studied. The study was conducted over two cycles to assess the current trend in labour productivity, identify productivity barriers, implement improvement solutions and assess their effectiveness. The aggregated direct work percentage for the projects from the first cycle of data collection was found to be 29.5%. After implementing the improvement strategies proposed by this study, the direct work percentage has increased to 35.6% in the second cycle. The assessment of labour productivity through Activity Analysis in maintenance and shutdown/turnaround environments is an important contribution of this study. This article provides a basis for benchmarking labour productivity in the Singapore petrochemical industry.
- 1 October 2018
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 20 (7) , 822-836
Improving labour productivity in process construction maintenance and shutdown/turnaround projects
Construction labour is a critical cost factor which affects the profitability of petrochemical companies and contractors. Improvement in labour productivity is indispensable for the petrochemical industry to achieve sustainable development. However, the industry lacks consensus in measuring labour productivity in construction, maintenance and shutdown/turnaround projects. This engenders a need for developing productivity improvement practices applicable to all projects. This article proposes productivity improvement solutions based on a study conducted on 17 projects at five petrochemical plants in Singapore. This research team developed and used a modified Activity Analysis method suitable to the site conditions and the maintenance and shutdown/turnaround activities which are seldom studied. The study was conducted over two cycles to assess the current trend in labour productivity, identify productivity barriers, implement improvement solutions and assess their effectiveness. The aggregated direct work percentage for the projects from the first cycle of data collection was found to be 29.5%. After implementing the improvement strategies proposed by this study, the direct work percentage has increased to 35.6% in the second cycle. The assessment of labour productivity through Activity Analysis in maintenance and shutdown/turnaround environments is an important contribution of this study. This article provides a basis for benchmarking labour productivity in the Singapore petrochemical industry.
- 18 July 2018
- Published by IGLC
- p. 829-839
Enhancing Labour Productivity in Petrochemical Construction and Maintenance Projects
- 18 July 2018
- Published by IGLC
- p. 829-839
Enhancing Labour Productivity in Petrochemical Construction and Maintenance Projects