Miloslav Výskala
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Miloslav Výskala has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
- Tomáš Hanák
Faculty of Civil Engineering, Brno University of Technology, Veveří 331/95, 602 00 Brno, Czech Republic
2 shared publications - Hanna Pacyno
Faculty of Civil Engineering, Cracow University of Technology, 31-155 Kraków, Poland
1 shared publication - Michal Mikulík
Faculty of Civil Engineering, Brno University of Technology, 602 00 Brno, Czech Republic
1 shared publication - Michał Juszczyk
Faculty of Civil Engineering, Cracow University of Technology, Warszawska 24, 31-155 Kraków, Poland
1 shared publication - Michał Siejda
Faculty of Civil Engineering, Cracow University of Technology, 31-155 Kraków, Poland
1 shared publication - Patrik Sokol1 shared publication
Latest Publications
- Open Access
- 28 November 2023
- Published by MDPI AG in Applied Sciences
- Vol. 13 (23) , 12744
Early Fast Cost Estimates of Sewerage Projects Construction Costs Based on Ensembles of Neural Networks
This paper presents research results on the development of an original cost prediction model for construction costs in sewerage projects. The focus is placed on fast cost estimates applicable in the early stages of a project, based on fundamental information available during the initial design phase of sanitary sewers prior to the detailed design. The originality and novelty of this research lie in the application of artificial neural network ensembles, which include a combination of several individual neural networks and the use of simple averaging and generalized averaging approaches. The research resulted in the development of two ensemble-based models, including five neural networks that were trained and tested using data collected from 125 sewerage projects completed in the Czech Republic between 2018 and 2022. The data included information relevant to various aspects of projects and contract costs, updated to account for changes in costs over time. The developed models present satisfactory predictive performance, especially the ensemble model based on simple averaging, which offers prediction accuracy within the range of ±30% (in terms of percentage errors) for over 90% of the training and testing samples. The developed models, based on the ensembles of neural networks, outperformed the benchmark model based on the classical approach and the use of multiple linear regression.
- 28 November 2023
- Published by MDPI AG in Applied Sciences
- Vol. 13 (23) , 12744
Open AccessEarly Fast Cost Estimates of Sewerage Projects Construction Costs Based on Ensembles of Neural Networks
This paper presents research results on the development of an original cost prediction model for construction costs in sewerage projects. The focus is placed on fast cost estimates applicable in the early stages of a project, based on fundamental information available during the initial design phase of sanitary sewers prior to the detailed design. The originality and novelty of this research lie in the application of artificial neural network ensembles, which include a combination of several individual neural networks and the use of simple averaging and generalized averaging approaches. The research resulted in the development of two ensemble-based models, including five neural networks that were trained and tested using data collected from 125 sewerage projects completed in the Czech Republic between 2018 and 2022. The data included information relevant to various aspects of projects and contract costs, updated to account for changes in costs over time. The developed models present satisfactory predictive performance, especially the ensemble model based on simple averaging, which offers prediction accuracy within the range of ±30% (in terms of percentage errors) for over 90% of the training and testing samples. The developed models, based on the ensembles of neural networks, outperformed the benchmark model based on the classical approach and the use of multiple linear regression.
- Open Access
- 4 April 2023
- Published by Polish Academy of Sciences Chancellery in Archives of Civil Engineering
- Vol. 69 (1) , 645-660
Determination of the extent of damage and calculation of the indemnity in case of natural disaster – tornado in South Moravia
In June 2021, a tornado struck a large area in southern Moravia, causing extensive damage to property owned by individuals and legal entities. A need thus arose to speed up the process of estimating the amount of insurance indemnity. This process involved local inspections and subsequent assessment of quotations from construction companies for repairs, as the adjusters did not have the time and resources to estimate the amount of damage using the usual method, i.e. an itemised budget containing a list of works, supplies and services necessary to restore a structure to its original condition based on an on-site inspection. This article contains a retrospective analysis of the accepted quotations and evaluates differences in terms of scope and price compared to the standard procedure. Four apartment buildings were selected for assessment of the insulation and roof repairs. The results show that there are clear discrepancies between the price as determined by the itemised budget using the usual prices and the construction companies' quotations. The analysis of the selected buildings has indicated that the quotations can by no means be accepted without first establishing the total damage and its actual scope. Major damage caused by a natural disaster will still have to be estimated on the basis of a personal inspection of the damaged property and preparation of an itemised budget created in line with the applicable pricing system.
- 4 April 2023
- Published by Polish Academy of Sciences Chancellery in Archives of Civil Engineering
- Vol. 69 (1) , 645-660
Open AccessDetermination of the extent of damage and calculation of the indemnity in case of natural disaster – tornado in South Moravia
In June 2021, a tornado struck a large area in southern Moravia, causing extensive damage to property owned by individuals and legal entities. A need thus arose to speed up the process of estimating the amount of insurance indemnity. This process involved local inspections and subsequent assessment of quotations from construction companies for repairs, as the adjusters did not have the time and resources to estimate the amount of damage using the usual method, i.e. an itemised budget containing a list of works, supplies and services necessary to restore a structure to its original condition based on an on-site inspection. This article contains a retrospective analysis of the accepted quotations and evaluates differences in terms of scope and price compared to the standard procedure. Four apartment buildings were selected for assessment of the insulation and roof repairs. The results show that there are clear discrepancies between the price as determined by the itemised budget using the usual prices and the construction companies' quotations. The analysis of the selected buildings has indicated that the quotations can by no means be accepted without first establishing the total damage and its actual scope. Major damage caused by a natural disaster will still have to be estimated on the basis of a personal inspection of the damaged property and preparation of an itemised budget created in line with the applicable pricing system.
- Open Access
- 24 February 2019
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 471 (11) , 112071
Analysis of Obligatorily Used Price Systems in Public Works Contracts Procurement
The issue of public works and supply contracts in terms of bidding is closely related not only to the individual cost calculation of individual bidders, but also to the tools that can be used within the calculations. For the standardisation of the technical and economic parameters, comprehensive price systems can be used, while the use of these price systems is obligatory in the legal environment of the Czech Republic. The aim of this paper is to analyse the price systems used in the Czech Republic and to compare them in terms of costing of construction works and supplies. In particular, this paper offers a comparison of specific construction works in the area of building engineering and water management structures.
- 24 February 2019
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 471 (11) , 112071
Open AccessAnalysis of Obligatorily Used Price Systems in Public Works Contracts Procurement
The issue of public works and supply contracts in terms of bidding is closely related not only to the individual cost calculation of individual bidders, but also to the tools that can be used within the calculations. For the standardisation of the technical and economic parameters, comprehensive price systems can be used, while the use of these price systems is obligatory in the legal environment of the Czech Republic. The aim of this paper is to analyse the price systems used in the Czech Republic and to compare them in terms of costing of construction works and supplies. In particular, this paper offers a comparison of specific construction works in the area of building engineering and water management structures.