Jian Sun
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Jian Sun has a total of 27 co-authors. Here are the top co-authors by number of shared publications:
- Lianguo Wang
State Key Laboratory of Intelligent Construction and Healthy Operation and Maintenance of Deep Underground Engineering, China University of Mining and Technology, Xuzhou, China
3 shared publications Ruofei Zhang
State Key Laboratory of Mining Response and Disaster Prevention and Control in Deep Coal Mines, Anhui University of Science and Technology, Huainan, China
3 shared publicationsYong Yang
3 shared publications- Guangming Zhao
School of Mining Engineering, Anhui University of Science and Technology, Huainan 232001, China
2 shared publications Ray Ruichong Zhang
Department of Mechanical Engineering, Colorado School of Mines, Golden, CO 80401
2 shared publicationsXin Liu
State Key Laboratory of Mining Response and Disaster Prevention and Control in Deep Coal Mines, Anhui University of Science and Technology, Huainan 232001, China
2 shared publications
Latest Publications
- Open Access
- 1 January 2024
- Published by Wiley in Shock and Vibration
- Vol. 2024 (1)
Design of Support Parameters of Large‐Section Open‐Off Cut and Its Dynamic Mining Response Characteristics
The open‐off cut is an important place in coal mining. It is mainly used to install the relevant equipment of the working face and start mining from here. Its stability and safety play a very important role in the installation of the relevant equipment of the working face and the smooth progress of the mining. Compared with the mining roadway, the open‐off cut of the working face has a larger span and is prone to caving accidents. Especially for large‐section open‐off cut, its roof stability control is a difficult problem for support. In order to solve the support design problem of 9106 large‐section open‐off cut under dynamic mining conditions in Hengsheng Coal Industry, the support parameters and support scheme of 9106 large‐section open‐off cut were designed by combining theoretical analysis, numerical simulation, and field monitoring. The dynamic response characteristics of 9106 large‐section open‐off cut in the mining process of adjacent l9301 working face were studied. The deformation and failure evolution law of 9106 large‐section open‐off cut were analyzed, and the support design scheme was applied to the engineering site. Among them, the maximum surface displacement of the two sides of the open‐off cut is about 316 mm, the maximum surface displacement of the roof and floor is about 133 mm, the maximum displacement of the deep roof is 19 mm, the maximum displacement of the shallow roof is 30 mm, the stable value of the bolt force is about 6 MPa, and the stable value of the anchor cable force is about 9.3 MPa. It shows that the designed support scheme can meet the influence of the 9106 large‐section open‐off cut on the mining of the adjacent 9301 working face and ensure the stability of the surrounding rock of the 9106 large‐section open‐off cut.
- 1 January 2024
- Published by Wiley in Shock and Vibration
- Vol. 2024 (1)
Open AccessDesign of Support Parameters of Large‐Section Open‐Off Cut and Its Dynamic Mining Response Characteristics
The open‐off cut is an important place in coal mining. It is mainly used to install the relevant equipment of the working face and start mining from here. Its stability and safety play a very important role in the installation of the relevant equipment of the working face and the smooth progress of the mining. Compared with the mining roadway, the open‐off cut of the working face has a larger span and is prone to caving accidents. Especially for large‐section open‐off cut, its roof stability control is a difficult problem for support. In order to solve the support design problem of 9106 large‐section open‐off cut under dynamic mining conditions in Hengsheng Coal Industry, the support parameters and support scheme of 9106 large‐section open‐off cut were designed by combining theoretical analysis, numerical simulation, and field monitoring. The dynamic response characteristics of 9106 large‐section open‐off cut in the mining process of adjacent l9301 working face were studied. The deformation and failure evolution law of 9106 large‐section open‐off cut were analyzed, and the support design scheme was applied to the engineering site. Among them, the maximum surface displacement of the two sides of the open‐off cut is about 316 mm, the maximum surface displacement of the roof and floor is about 133 mm, the maximum displacement of the deep roof is 19 mm, the maximum displacement of the shallow roof is 30 mm, the stable value of the bolt force is about 6 MPa, and the stable value of the anchor cable force is about 9.3 MPa. It shows that the designed support scheme can meet the influence of the 9106 large‐section open‐off cut on the mining of the adjacent 9301 working face and ensure the stability of the surrounding rock of the 9106 large‐section open‐off cut.
- 7 October 2022
- Published by Springer Nature in Geotechnical and Geological Engineering
- Vol. 41 (2) , 847-860
Research on Coal Pillar Width and Support Design of Gob-Side Entry
- 7 October 2022
- Published by Springer Nature in Geotechnical and Geological Engineering
- Vol. 41 (2) , 847-860
Research on Coal Pillar Width and Support Design of Gob-Side Entry
- Open Access
Deformation and Failure Law of Roadway along Goaf and Reserve Width of Section Coal Pillar
It was a non-negligible problem in the reserve of section coal pillar in coal mining. Reasonable section coal pillar width and support parameters can not only ensure the stability of surrounding rock of roadway but also produce more coal resources and save support cost. In this paper, the mining of 9106 workface of Linfen Tianyu Hengsheng Coal Industry of Wanbei Coal Power Group was taken as the research engineering background. FLAC3D numerical simulation software was used to simulate and analyze the laws of deformation failure of 6m, 7m, 8m, 9m, and 10m coal pillars and surrounding rock of roadway along goaf without support conditions during the mining of 9106 workface. On this basis, the deformation failure law of 7m and 8m coal pillars and surrounding rock of roadway along goaf under different supporting conditions (bolt and cable with different row spacing) were further simulated and analyzed. The results showed that when 7m coal pillars were reserved in 9106 roadway along goaf, the optimal bolt row spacing was 800mm. When 8m coal pillars were reserved, the bolt row spacing was preferred to be 900mm. At this time, the width of coal pillar and support parameters can ensure the stability of roadway surrounding rock during the mining process of 9106 workface and can produce more coal resources and save support cost.
Open AccessDeformation and Failure Law of Roadway along Goaf and Reserve Width of Section Coal Pillar
It was a non-negligible problem in the reserve of section coal pillar in coal mining. Reasonable section coal pillar width and support parameters can not only ensure the stability of surrounding rock of roadway but also produce more coal resources and save support cost. In this paper, the mining of 9106 workface of Linfen Tianyu Hengsheng Coal Industry of Wanbei Coal Power Group was taken as the research engineering background. FLAC3D numerical simulation software was used to simulate and analyze the laws of deformation failure of 6m, 7m, 8m, 9m, and 10m coal pillars and surrounding rock of roadway along goaf without support conditions during the mining of 9106 workface. On this basis, the deformation failure law of 7m and 8m coal pillars and surrounding rock of roadway along goaf under different supporting conditions (bolt and cable with different row spacing) were further simulated and analyzed. The results showed that when 7m coal pillars were reserved in 9106 roadway along goaf, the optimal bolt row spacing was 800mm. When 8m coal pillars were reserved, the bolt row spacing was preferred to be 900mm. At this time, the width of coal pillar and support parameters can ensure the stability of roadway surrounding rock during the mining process of 9106 workface and can produce more coal resources and save support cost.
- Open Access
Feasibility of Water Injection on the Coal Wall of Loose Thick Coal Seam to Prevent Rib Spalling and Its Optimal Moisture Content
Rib spalling of loose thick coal wall seriously restricts the high yield, high efficiency of coal mine, affecting the safety production of coal mine. Based on the engineering background of water injection to control rib spalling of loose thick coal seam in the Luling Coal Mine of the Huaibei Mining Group, the mineral composition and microscopic morphology of III811 loose thick coal seam in Luling Coal Mine were analyzed by X-ray diffraction and scanning electron microscope. Through uniaxial compressive strength tests of coal samples with different moisture content, the relationship between uniaxial compressive strength, peak strain and moisture content, and their failure characteristics was studied. The results showed that the natural moisture content of III811 coal seam in Luling coal mine is low, and it contains a large amount of kaolinite (75.2%) belonging to clay mineral which is easy to absorb water and then expand, fully bond loose coal body and fill cracks to improve the integrity of coal body. These two factors provide feasibility for injecting water in workface to prevent rib spalling. The compressive strength of coal samples decreased slowly with the raise of moisture content, while the peak strain increased first and then decreased. The peak strain was the largest when the water content was 6.0%. The failure degree of coal samples intensifies with the increase of water content, and the failure form changes from tensile failure at low water content to shear failure at high water content. Considering the relationship between compressive strength, peak strain, and moisture content of coal samples, the optimal moisture content of III811 workface in loose thick coal seam is determined to be 4.5% ~6%.
Open AccessFeasibility of Water Injection on the Coal Wall of Loose Thick Coal Seam to Prevent Rib Spalling and Its Optimal Moisture Content
Rib spalling of loose thick coal wall seriously restricts the high yield, high efficiency of coal mine, affecting the safety production of coal mine. Based on the engineering background of water injection to control rib spalling of loose thick coal seam in the Luling Coal Mine of the Huaibei Mining Group, the mineral composition and microscopic morphology of III811 loose thick coal seam in Luling Coal Mine were analyzed by X-ray diffraction and scanning electron microscope. Through uniaxial compressive strength tests of coal samples with different moisture content, the relationship between uniaxial compressive strength, peak strain and moisture content, and their failure characteristics was studied. The results showed that the natural moisture content of III811 coal seam in Luling coal mine is low, and it contains a large amount of kaolinite (75.2%) belonging to clay mineral which is easy to absorb water and then expand, fully bond loose coal body and fill cracks to improve the integrity of coal body. These two factors provide feasibility for injecting water in workface to prevent rib spalling. The compressive strength of coal samples decreased slowly with the raise of moisture content, while the peak strain increased first and then decreased. The peak strain was the largest when the water content was 6.0%. The failure degree of coal samples intensifies with the increase of water content, and the failure form changes from tensile failure at low water content to shear failure at high water content. Considering the relationship between compressive strength, peak strain, and moisture content of coal samples, the optimal moisture content of III811 workface in loose thick coal seam is determined to be 4.5% ~6%.
- Open Access
Stress Distribution and Failure Characteristics of Stope Overburden of an Inclined Coal Seam
The stress distribution, failure depth, and shape and range of overlying strata of the stope are important bases for the prevention of roof water hazards and determination of reasonable locations of roof roadways. Based on the hydrogeological data of the E9103 workface, FLAC numerical simulation software was used to establish a numerical calculation model of the overlying strata of the E9103 inclined coal seam, and the stress distribution and failure characteristics of the overlying strata were analyzed. The development height of the caving and water-flowing fractured zones in the overlying strata of the workface was determined. Results showed that the stress reduction area appeared above the goaf in the form of an “arched” distribution, and tensile stress occurred in the local area of the overburden. The overburden relief arch of the workface was symmetrically distributed along the advanced direction and asymmetrically distributed along the inclined direction, with the arch crown deflecting above the workface. The horizontal and vertical displacements of the overlying strata of the stope increased with the advancing distance of the workface. The horizontal displacement in the -direction presented two obvious regions, and the critical points of the two regions moved forward with the advancement of the workface and showed a certain degree of symmetry. The horizontal displacement in the -direction presented an “inverted bowl” distribution and increased with the advancement of the workface. The main failure forms of the overlying strata of the workface were a tensile and shear failure, and shear failure was dominant in the upper direction. The height of the overburden caving zone in the workface had little relationship with the advancing distance of the workface and increased slowly as the advancing distance of the workface increased. The development height of the caving zone is 7.2–18.13 m. The development height of the water conduction fissure zone increased rapidly with the increase in the advancing distance of the workface. When the advancing distance was equal to the length of the workface, the development height of the water conduction fissure zone was flat and basically maintained at a stable value. The development height of the water conduction fissure zone is 30.8–62.2 m. These research findings have important engineering importance for ensuring safe and efficient mining of E9103 workface.
Open AccessStress Distribution and Failure Characteristics of Stope Overburden of an Inclined Coal Seam
The stress distribution, failure depth, and shape and range of overlying strata of the stope are important bases for the prevention of roof water hazards and determination of reasonable locations of roof roadways. Based on the hydrogeological data of the E9103 workface, FLAC numerical simulation software was used to establish a numerical calculation model of the overlying strata of the E9103 inclined coal seam, and the stress distribution and failure characteristics of the overlying strata were analyzed. The development height of the caving and water-flowing fractured zones in the overlying strata of the workface was determined. Results showed that the stress reduction area appeared above the goaf in the form of an “arched” distribution, and tensile stress occurred in the local area of the overburden. The overburden relief arch of the workface was symmetrically distributed along the advanced direction and asymmetrically distributed along the inclined direction, with the arch crown deflecting above the workface. The horizontal and vertical displacements of the overlying strata of the stope increased with the advancing distance of the workface. The horizontal displacement in the -direction presented two obvious regions, and the critical points of the two regions moved forward with the advancement of the workface and showed a certain degree of symmetry. The horizontal displacement in the -direction presented an “inverted bowl” distribution and increased with the advancement of the workface. The main failure forms of the overlying strata of the workface were a tensile and shear failure, and shear failure was dominant in the upper direction. The height of the overburden caving zone in the workface had little relationship with the advancing distance of the workface and increased slowly as the advancing distance of the workface increased. The development height of the caving zone is 7.2–18.13 m. The development height of the water conduction fissure zone increased rapidly with the increase in the advancing distance of the workface. When the advancing distance was equal to the length of the workface, the development height of the water conduction fissure zone was flat and basically maintained at a stable value. The development height of the water conduction fissure zone is 30.8–62.2 m. These research findings have important engineering importance for ensuring safe and efficient mining of E9103 workface.
- 21 April 2020
- Published by Springer Nature in Arabian Journal of Geosciences
- Vol. 13 (9) , 1-14
Sensitivity analysis of overburden water-resistant strata stability based on the mechanical properties of backfill body
- 21 April 2020
- Published by Springer Nature in Arabian Journal of Geosciences
- Vol. 13 (9) , 1-14
Sensitivity analysis of overburden water-resistant strata stability based on the mechanical properties of backfill body
- 7 December 2019
- Published by Springer Nature in Environmental Earth Sciences
- Vol. 78 (24) , 719
Overburden stability of an inclined backfill stope in the context of the nonlinear elastic mechanical properties of the backfill body
- 7 December 2019
- Published by Springer Nature in Environmental Earth Sciences
- Vol. 78 (24) , 719
Overburden stability of an inclined backfill stope in the context of the nonlinear elastic mechanical properties of the backfill body
- Open Access
- 1 September 2019
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 23 (9) , 3793-3806
Stress Distribution and Failure Characteristics for Workface Floor of a Tilted Coal Seam
- 1 September 2019
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 23 (9) , 3793-3806
Open AccessStress Distribution and Failure Characteristics for Workface Floor of a Tilted Coal Seam
- Open Access
- 1 January 2019
- Published by Wiley in Advances in Civil Engineering
- Vol. 2019 (1)
Mitigation of Underground Engineering Disaster
- 1 January 2019
- Published by Wiley in Advances in Civil Engineering
- Vol. 2019 (1)
Open AccessMitigation of Underground Engineering Disaster
- Open Access
- 1 January 2019
- Published by Wiley in Advances in Civil Engineering
- Vol. 2019 (1)
The Blocking Mechanism of the Vertical Feeding System of Roadside Support Body Material for Backfilling Gob‐Side Entry Retaining
Reliable operation of the feeding system plays a crucial role in ensuring the safe and efficient production of the working face of backfilling gob‐side entry retaining (GER). In the process of vertical feeding of the roadside support body material, the problem of blocking of the feeding shaft has occurred to the test mine, which seriously affects the production safety in mines. In this paper, based on the theoretical analysis, a fluid‐solid coupling numerical model was established. The change rules of the speed of sacked gangue, pressure of air below it, and speed vector distribution with different vent diameters were obtained. The blocking mechanism of the feeding system was revealed. The results show that if the exhaust vent of the stock bin was shut, the speed of gangue in the mine increased and then decreased and finally blocked in the feeding shaft. If the exhaust vent of the stock bin was opened for pressure discharge, with the increase of diameter of the exhaust vent, the maximum speed and ending speed of sacked gangue increased, pressure differential reduced, and speed vector was uniformly distributed. The energy criterion of blocking of the feeding shaft was further obtained. Based on the engineering conditions of the test mine, when the feeding shaft is blocked, the critical value of diameter of the exhaust vent is 30 mm. The research results provide basis for the design of key parameters of the vertical feeding system, ensuring the safe and efficient production of gob‐backfilled GER working face.
- 1 January 2019
- Published by Wiley in Advances in Civil Engineering
- Vol. 2019 (1)
Open AccessThe Blocking Mechanism of the Vertical Feeding System of Roadside Support Body Material for Backfilling Gob‐Side Entry Retaining
Reliable operation of the feeding system plays a crucial role in ensuring the safe and efficient production of the working face of backfilling gob‐side entry retaining (GER). In the process of vertical feeding of the roadside support body material, the problem of blocking of the feeding shaft has occurred to the test mine, which seriously affects the production safety in mines. In this paper, based on the theoretical analysis, a fluid‐solid coupling numerical model was established. The change rules of the speed of sacked gangue, pressure of air below it, and speed vector distribution with different vent diameters were obtained. The blocking mechanism of the feeding system was revealed. The results show that if the exhaust vent of the stock bin was shut, the speed of gangue in the mine increased and then decreased and finally blocked in the feeding shaft. If the exhaust vent of the stock bin was opened for pressure discharge, with the increase of diameter of the exhaust vent, the maximum speed and ending speed of sacked gangue increased, pressure differential reduced, and speed vector was uniformly distributed. The energy criterion of blocking of the feeding shaft was further obtained. Based on the engineering conditions of the test mine, when the feeding shaft is blocked, the critical value of diameter of the exhaust vent is 30 mm. The research results provide basis for the design of key parameters of the vertical feeding system, ensuring the safe and efficient production of gob‐backfilled GER working face.