BZBaoyun Zhao

Baoyun Zhao

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Baoyun Zhao has a total of 8 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Experimental investigation and constitutive model for lime mudstone

    by Junbao Wang, Xinrong Liu, Baoyun Zhao, Zhanping Song, Jinxing Lai

    In order to investigate the mechanical properties of lime mudstone, conventional triaxial compression tests under different confining pressures (0, 5, 15 and 20 MPa) are performed on lime mudstone samples. The test results show that, from the overall perspective of variation law, the axial peak stress, axial peak strain and elastic modulus of lime mudstone tend to gradually increase with increasing confining pressure. In the range of tested confining pressure, the variations in axial peak stress and elastic modulus with confining pressure can be described with linear functions; while the variation in axial peak strain with confining pressure can be reflected with a power function. To describe the axial stress–strain behavior in failure process of lime mudstone, a new constitutive model is proposed, with the model characteristics analyzed and the parameter determination method put forward. Compared with Wang’ model, only one parameter n is added to the new model. The comparison of predicted curves from the model and test data indicates that the new model can preferably simulate the strain softening property of lime mudstone and the axial stress–strain response in rock failure process.


  • Open Access

    Study of the stability of tunnel construction based on double-heading advance construction method

    by Zhanping Song, Guilin Shi, Baoyun Zhao, Keming Zhao, Junbao Wang

    The deformation and significant settlement of surrounding rock often occur during tunnel construction with the condition of abundant water and weak cementing sand. In order to study the construction method and stability under such soft stratum, this article takes Taoshuping tunnel as the engineering background and puts forward a new tunnel construction method—double-heading advance construction method by comparing the advantages and disadvantages of various traditional construction schemes. The numerical simulation of tunnel construction process using this method is carried out to illustrate the rationality and feasibility of the method. The conclusions are drawn by comparing the numerical simulation results with the field monitoring data analysis. The numerical simulation results show that the maximum settlement value caused by excavation construction is in the parts 5 and 6 of the upper half-section and the part 7 of the central section. The settlement values of parts 5, 6, and 7 accounted for 32.4%, 24.3%, and 18.9% of the total settlement values, respectively. So, the supporting measures for double-heading advance excavation construction of these three parts should be strengthened properly. The stress of the right hance changes greatly before and after the demolition of temporary support. The maximum positive value of stress is 23 kPa and the maximum negative value of stress is −32 kPa. Therefore, the length of temporary bracing should be strictly controlled during construction and the monitoring of the right hance area should be strengthened. Furthermore, it is necessary to strengthen the supporting measures and monitoring in the right spandrel area as the surrounding rock pressure in the right spandrel area is higher than the left spandrel area. The optimum excavation height of the upper half-section in Taoshuping tunnel is determined to be 5.4 m and the reasonable excavation distance between parts 1 and 5 is determined to be 25–30 m by parameter optimization. Finally, the variation law of numerical simulation and field monitoring results is consistent, which shows that the double-heading advance construction method has a better effect on the stability control of surrounding rock, and the rationality and feasibility of this method are validated effectively. Therefore, the double-heading advance method is suitable for tunnel construction in the sand stratum with rich water and weak cementation, and the successful implementation of this method in Taoshuping tunnel also provides a reference for subsequent tunnel construction in the sand stratum with rich water and weak cementation.