Kei Masaki
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Research Interests
Kei Masaki has a total of 81 co-authors. Here are the top co-authors by number of shared publications:
Junnichi Yagyu
National Institutes for Quantum and Radiological Science and Technology, Japan
3 shared publicationsAkira Sakasai
National Institutes for Quantum and Radiological Science and Technology, Japan
2 shared publicationsFuminori Okano
National Institutes for Quantum and Radiological Science and Technology, Japan
2 shared publicationsH Kubo
Naka Fusion Institute, Japan Atomic Energy Agency, Naka, Ibaraki, 311-0193 Japan
2 shared publicationsH Takenaga
Naka Fusion Institute, Japan Atomic Energy Agency, Naka, Ibaraki, 311-0193 Japan
2 shared publications- Hideki Kajitani
National Institutes for Quantum Science and Technology
2 shared publications
Latest Publications
- 4 February 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 30 (4) , 1-6
Progress of ITER TF Coil Fabrication in Japan
QST, as Japan Domestic Agency in ITER, has responsibility to procure 9 ITER Toroidal Field (TF) coils and all 19 TF Coil Cases (CC). The 9 TF coils are procured by two suppliers to ac-celerate their production. The series production of Double-Pancakes (DPs) and Winding Pack (WP) are in progress in both two manufacturing lines. 55 DP windings, 40 DP impregnation and curing, 3 WPs and 7 CCs have been completed. Series pro-duction of TF coil WP and CC are progressing in Japan. The as-sembly of WP and CC is proceeding and gap-filling impregna-tion was completed in the first TF coil. Since the remaining pro-cess in the first TF coil is only final machining, we can say that the procedure of ITER TF coil fabrication have been well devel-oped and established.
- 4 February 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 30 (4) , 1-6
Progress of ITER TF Coil Fabrication in Japan
QST, as Japan Domestic Agency in ITER, has responsibility to procure 9 ITER Toroidal Field (TF) coils and all 19 TF Coil Cases (CC). The 9 TF coils are procured by two suppliers to ac-celerate their production. The series production of Double-Pancakes (DPs) and Winding Pack (WP) are in progress in both two manufacturing lines. 55 DP windings, 40 DP impregnation and curing, 3 WPs and 7 CCs have been completed. Series pro-duction of TF coil WP and CC are progressing in Japan. The as-sembly of WP and CC is proceeding and gap-filling impregna-tion was completed in the first TF coil. Since the remaining pro-cess in the first TF coil is only final machining, we can say that the procedure of ITER TF coil fabrication have been well devel-oped and established.
- 1 September 2019
- Published by Elsevier in Fusion Engineering and Design
- Vol. 146, 2375-2378
Design and manufacturing of thermal shield for JT-60SA
- 1 September 2019
- Published by Elsevier in Fusion Engineering and Design
- Vol. 146, 2375-2378
Design and manufacturing of thermal shield for JT-60SA
- 4 February 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 29 (5) , 1-5
Development of ITER TF Coil Winding Pack (WP) and Qualification for Assembling WP and Coil Case in Japan
QST, as Japan Domestic Agency in ITER, has responsibility to procure 9 ITER Toroidal Field (TF) coils and all 19 TF Coil Cases (CC). The 9 TF coils are procured by two suppliers to accelerate their production. The series production of Double-Pancakes (DPs) and Winding Pack (WP) are in progress in both two manufacturing lines. 45 DP windings, 30 DP impregnation and curing, and the first WP cold test and the second WP impregnation have been completed. In addition, 4 CC have been completed. Assembly of the WP and CC of the first TF coil will start from beginning of 2019. To qualify assembly of the WP and CC, trials including those to estimate closure welding deformation and qualification of tooling have been performed. The assembly procedure has been developed based on these results.
- 4 February 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 29 (5) , 1-5
Development of ITER TF Coil Winding Pack (WP) and Qualification for Assembling WP and Coil Case in Japan
QST, as Japan Domestic Agency in ITER, has responsibility to procure 9 ITER Toroidal Field (TF) coils and all 19 TF Coil Cases (CC). The 9 TF coils are procured by two suppliers to accelerate their production. The series production of Double-Pancakes (DPs) and Winding Pack (WP) are in progress in both two manufacturing lines. 45 DP windings, 30 DP impregnation and curing, and the first WP cold test and the second WP impregnation have been completed. In addition, 4 CC have been completed. Assembly of the WP and CC of the first TF coil will start from beginning of 2019. To qualify assembly of the WP and CC, trials including those to estimate closure welding deformation and qualification of tooling have been performed. The assembly procedure has been developed based on these results.
- 9 November 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 28 (3) , 1-7
JT-60SA Magnet System Status
The JT-60SA experimental device will be the world's largest superconducting tokamak when it is assembled in 2019 in Naka, Japan (R = 3 m, a = 1.2 m). It is being constructed jointly by institutions in the EU and Japan under the Broader Approach agreement. Manufacturing of the six NbTi equilibrium field (EF) coils, which have a diameter of up to 12 m, has been completed. So far, 13 of the 18 NbTi toroidal field (TF) coils, each 7-m high and 4.5-m wide, have also been manufactured and tested at 4 K in a dedicated test facility in France. The first three of four Nb3Sn central solenoid (CS) modules have been completed, as have all of the copper in-vessel error field correction coils. Installation of the TF magnet, around the previously welded 340° tokamak vacuum vessel and its thermal shield, started at the end of 2016 and is currently underway. The TF magnet will in turn support the EF and CS coils.
- 9 November 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 28 (3) , 1-7
JT-60SA Magnet System Status
The JT-60SA experimental device will be the world's largest superconducting tokamak when it is assembled in 2019 in Naka, Japan (R = 3 m, a = 1.2 m). It is being constructed jointly by institutions in the EU and Japan under the Broader Approach agreement. Manufacturing of the six NbTi equilibrium field (EF) coils, which have a diameter of up to 12 m, has been completed. So far, 13 of the 18 NbTi toroidal field (TF) coils, each 7-m high and 4.5-m wide, have also been manufactured and tested at 4 K in a dedicated test facility in France. The first three of four Nb3Sn central solenoid (CS) modules have been completed, as have all of the copper in-vessel error field correction coils. Installation of the TF magnet, around the previously welded 340° tokamak vacuum vessel and its thermal shield, started at the end of 2016 and is currently underway. The TF magnet will in turn support the EF and CS coils.
- 1 October 2015
- Published by Elsevier in Fusion Engineering and Design
- Vol. 98-99, 1614-1619
Welding technology on sector assembly of the JT-60SA vacuum vessel
- 1 October 2015
- Published by Elsevier in Fusion Engineering and Design
- Vol. 98-99, 1614-1619
Welding technology on sector assembly of the JT-60SA vacuum vessel
- 1 October 2011
- Published by Elsevier in Journal of Nuclear Materials
- Vol. 417 (1-3) , 620-623
Long term hydrogen retention in the plasma facing carbon tiles of JT-60U
- 1 October 2011
- Published by Elsevier in Journal of Nuclear Materials
- Vol. 417 (1-3) , 620-623
Long term hydrogen retention in the plasma facing carbon tiles of JT-60U
- 28 April 2006
- Published by IOP Publishing in Nuclear Fusion
- Vol. 46 (5) , 626-634
Impact of wall saturation on particle control in long and high-power-heated discharges in JT-60U
- 28 April 2006
- Published by IOP Publishing in Nuclear Fusion
- Vol. 46 (5) , 626-634
Impact of wall saturation on particle control in long and high-power-heated discharges in JT-60U
- 31 January 2006
- Published by IOP Publishing in Nuclear Fusion
- Vol. 46 (3) , S39-S48
Study of global wall saturation mechanisms in long-pulse ELMy H-mode discharges on JT-60U
- 31 January 2006
- Published by IOP Publishing in Nuclear Fusion
- Vol. 46 (3) , S39-S48
Study of global wall saturation mechanisms in long-pulse ELMy H-mode discharges on JT-60U
- 1 January 1997
- Published by Elsevier
- Vol. 39, 471-474
Design of a compact W-shaped pumped divertor in JT-60U
- 1 January 1997
- Published by Elsevier
- Vol. 39, 471-474
Design of a compact W-shaped pumped divertor in JT-60U