Yan Shi
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Yan Shi has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Fulin Wang
College of Engineering, Northeast Agricultural University, Harbin 150030, China
3 shared publications Klaus Seeland
Swiss Federal Institute of Technology, Zurich (ETHZ)
1 shared publication- Klaus Seeland
Department of Environmental Systems Science, Swiss Federal Institute of Technology, Zurich (ETHZ), Sonneggstrasse 33, 8092 Zürich, Switzerland
1 shared publication - Lili Jia
College of Engineering, Northeast Agricultural University, Harbin 150030, China
1 shared publication Shumiao Jin
Harbin Institute of Technology
1 shared publication- Ying Wang
College of Engineering, Northeast Agricultural University, Harbin 150030, China
1 shared publication
Latest Publications
- Open Access
Revenue and Risk Sharing Mechanism Design in Agriculture Supply Chains Considering the Participation of Agricultural Cooperatives
Uncertain yield and demand often result in unbalanced revenue and risk sharing among agriculture supply chain (ASC) members. Agricultural cooperatives help smallholder farmers enhance their bargaining power via revenue and risk sharing and are a significant bridge between farmers and retailers. Therefore, this study aimed to design a contractual mechanism considering a cooperative’s participation in the coordination of ASCs that face random yield and demand in pursuit of risk and benefit equivalence. We first compared two- and three-echelon decentralized ASCs with a centralized system, and the results indicate that the cooperative’s participation is conducive to redistributing profit between the retailer and farmer. As a verified revenue-sharing (RS) contract cannot coordinate a two-echelon ASC under uncertain yield and demand, we developed a double revenue-sharing (DRS) contract, which has been demonstrated to coordinate an ASC system with the cooperative’s participation. A numerical analysis was conducted to show that the cooperative can influence profit distribution among the upstream and downstream members via wholesale prices. Therefore, equivalence of risk and benefit is realized and fairly allocated among the members under the DRS contract, which is of great significance to the ASC system’s stable and sustainable development.
Open AccessRevenue and Risk Sharing Mechanism Design in Agriculture Supply Chains Considering the Participation of Agricultural Cooperatives
Uncertain yield and demand often result in unbalanced revenue and risk sharing among agriculture supply chain (ASC) members. Agricultural cooperatives help smallholder farmers enhance their bargaining power via revenue and risk sharing and are a significant bridge between farmers and retailers. Therefore, this study aimed to design a contractual mechanism considering a cooperative’s participation in the coordination of ASCs that face random yield and demand in pursuit of risk and benefit equivalence. We first compared two- and three-echelon decentralized ASCs with a centralized system, and the results indicate that the cooperative’s participation is conducive to redistributing profit between the retailer and farmer. As a verified revenue-sharing (RS) contract cannot coordinate a two-echelon ASC under uncertain yield and demand, we developed a double revenue-sharing (DRS) contract, which has been demonstrated to coordinate an ASC system with the cooperative’s participation. A numerical analysis was conducted to show that the cooperative can influence profit distribution among the upstream and downstream members via wholesale prices. Therefore, equivalence of risk and benefit is realized and fairly allocated among the members under the DRS contract, which is of great significance to the ASC system’s stable and sustainable development.
- Open Access
- 20 July 2023
- Published by MDPI AG in Sustainability
- Vol. 15 (14) , 11319
The Maize Supply Chain Coordination Mechanism under Yield Uncertainty Caused by Drought: A Study in the Heilongjiang Province of China
Deficient rainfall due to drought is an inevitable factor triggering maize yield uncertainty, thus affecting the performance and sustainability of the supply chain. Therefore, this paper first uses historical data to quantitatively fit the unfavorable effect of rainfall on maize yield affected by drought, taking the maize planting in the Heilongjiang Province of China as an example. Then, using a Stackelberg game, payback revenue sharing (PBRS), and cost revenue sharing (CRS), contract mechanisms are developed to coordinate the maize supply chain incorporating yield uncertainty from drought and demand risk faced by the retailer. We investigate the impact of uncertain maize yield on the supply chain and conduct numerical experiments to verify the analysis. The results reveal that declining rainfall, representing increasing drought severity, negatively affects the profits of the entire supply chain and its members; however, supply chain efficiency is raised under both coordinated contracts. In addition, the yield risk-sharing proportion was higher under a CRS mechanism than a PBRS one, which gives more incentives for the vulnerable supplier to participate in the supply chain. Finally, our analysis indicates that rearranging contract structures and parameters based on classic revenue sharing contracts could realize supply chain coordination.
- 20 July 2023
- Published by MDPI AG in Sustainability
- Vol. 15 (14) , 11319
Open AccessThe Maize Supply Chain Coordination Mechanism under Yield Uncertainty Caused by Drought: A Study in the Heilongjiang Province of China
Deficient rainfall due to drought is an inevitable factor triggering maize yield uncertainty, thus affecting the performance and sustainability of the supply chain. Therefore, this paper first uses historical data to quantitatively fit the unfavorable effect of rainfall on maize yield affected by drought, taking the maize planting in the Heilongjiang Province of China as an example. Then, using a Stackelberg game, payback revenue sharing (PBRS), and cost revenue sharing (CRS), contract mechanisms are developed to coordinate the maize supply chain incorporating yield uncertainty from drought and demand risk faced by the retailer. We investigate the impact of uncertain maize yield on the supply chain and conduct numerical experiments to verify the analysis. The results reveal that declining rainfall, representing increasing drought severity, negatively affects the profits of the entire supply chain and its members; however, supply chain efficiency is raised under both coordinated contracts. In addition, the yield risk-sharing proportion was higher under a CRS mechanism than a PBRS one, which gives more incentives for the vulnerable supplier to participate in the supply chain. Finally, our analysis indicates that rearranging contract structures and parameters based on classic revenue sharing contracts could realize supply chain coordination.
- Open Access
- 27 April 2022
- Published by MDPI AG in Sustainability
- Vol. 14 (9) , 5271
Agricultural Supply Chain Coordination under Weather-Related Uncertain Yield
In the context of agriculture, we focus in this paper on a two-echelon supply chain consisting of a supplier facing weather-related yield uncertainty and a retailer facing market-linked demand uncertainty. We mainly investigated how the randomness of yield and demand influences the profit of the supply chain members and the performance of the entire supply chain. We adopted an additive random yield model to capture the effect of uncontrollable weather factors on crop yield. For the case where a wholesale price contract fails to achieve coordination, we propose a revenue-sharing contract with a new structural arrangement and explore its influence on the contract coordination ability. In the revised contract, the retailer purchases all the actual output from the supplier instead of an order quantity; thus, the retailer shares yield risk with the supplier. To look at the implications in detail, we conducted a numerical analysis where the uncertain yield of maize crops originates from the fluctuating rainfall; the results indicate that the revised revenue-sharing contract can achieve supply chain coordination, and all the members improve their profit. This paper shows that by redesigning the contract structure, the classical revenue-sharing contract still has the coordinating ability in the presence of simultaneous yield and demand uncertainties.
- 27 April 2022
- Published by MDPI AG in Sustainability
- Vol. 14 (9) , 5271
Open AccessAgricultural Supply Chain Coordination under Weather-Related Uncertain Yield
In the context of agriculture, we focus in this paper on a two-echelon supply chain consisting of a supplier facing weather-related yield uncertainty and a retailer facing market-linked demand uncertainty. We mainly investigated how the randomness of yield and demand influences the profit of the supply chain members and the performance of the entire supply chain. We adopted an additive random yield model to capture the effect of uncontrollable weather factors on crop yield. For the case where a wholesale price contract fails to achieve coordination, we propose a revenue-sharing contract with a new structural arrangement and explore its influence on the contract coordination ability. In the revised contract, the retailer purchases all the actual output from the supplier instead of an order quantity; thus, the retailer shares yield risk with the supplier. To look at the implications in detail, we conducted a numerical analysis where the uncertain yield of maize crops originates from the fluctuating rainfall; the results indicate that the revised revenue-sharing contract can achieve supply chain coordination, and all the members improve their profit. This paper shows that by redesigning the contract structure, the classical revenue-sharing contract still has the coordinating ability in the presence of simultaneous yield and demand uncertainties.
- Open Access
- 26 March 2019
- Published by MDPI AG in Sustainability
- Vol. 11 (6) , 1812
Using RISKPLAN for Earthquake Risk Assessment in Sichuan Province, China
Sichuan Province of China is a prominent population and economic growth center as well as an earthquake-stricken region. A sound understanding of the seismic risk that Sichuan Province is facing is useful to raise risk awareness, achieve disaster risk reduction (DRR), and guarantee sustainable socio-economic development. Earthquake risk assessment is the first step in these efforts. This study strives to demonstrate the feasibility of applying an integrated earthquake risk assessment in Sichuan Province of China using RISKPLAN, a risk evaluation tool of natural hazards developed by the Swiss Federal Office for the Environment (FOEN). The time and location of seismic events in Sichuan were incorporated into three scenarios and calculated with respect to expected losses under different assumed conditions of earthquake occurrence, such as the recurrence interval and magnitude. Furthermore, cost-effectiveness calculations were made regarding the various possible scenarios to assess the ratio of expected losses and the required financial means for prevention and mitigation measures against the effects of seismic activities in Sichuan. Our results show that when the magnitude of the seismic event is greater than expected, reduction and mitigation investments for a possible earthquake risk will be all the more rewarding.
- 26 March 2019
- Published by MDPI AG in Sustainability
- Vol. 11 (6) , 1812
Open AccessUsing RISKPLAN for Earthquake Risk Assessment in Sichuan Province, China
Sichuan Province of China is a prominent population and economic growth center as well as an earthquake-stricken region. A sound understanding of the seismic risk that Sichuan Province is facing is useful to raise risk awareness, achieve disaster risk reduction (DRR), and guarantee sustainable socio-economic development. Earthquake risk assessment is the first step in these efforts. This study strives to demonstrate the feasibility of applying an integrated earthquake risk assessment in Sichuan Province of China using RISKPLAN, a risk evaluation tool of natural hazards developed by the Swiss Federal Office for the Environment (FOEN). The time and location of seismic events in Sichuan were incorporated into three scenarios and calculated with respect to expected losses under different assumed conditions of earthquake occurrence, such as the recurrence interval and magnitude. Furthermore, cost-effectiveness calculations were made regarding the various possible scenarios to assess the ratio of expected losses and the required financial means for prevention and mitigation measures against the effects of seismic activities in Sichuan. Our results show that when the magnitude of the seismic event is greater than expected, reduction and mitigation investments for a possible earthquake risk will be all the more rewarding.
- 6 September 2014
- Published by Springer Nature in Natural Hazards
- Vol. 75 (2) , 1731-1745
Modeling business interruption impacts due to disrupted highway network of Shifang by the Wenchuan earthquake
- 6 September 2014
- Published by Springer Nature in Natural Hazards
- Vol. 75 (2) , 1731-1745
Modeling business interruption impacts due to disrupted highway network of Shifang by the Wenchuan earthquake