TATaher Ahmadi

Taher Ahmadi

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Taher Ahmadi has a total of 23 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    The impact of collaboration on sustainability and profit in the fashion rental supply chain

    by Jack A.A. van der Veen, Taher Ahmadi, Bo van der Rhee, V. Venugopal


  • Open Access

    Managing customer waiting times in an inventory system using Conditional Value-at-Risk measure

    by Taher Ahmadi, Alireza F. Hesaraki, Anwar Mahmoodi, Ahmadreza Marandi

    In today’s fast-paced world, delays or prolonged customer waiting times pose a threat to the firm’s profitability. This study utilizes the mean-CVaR metric to incorporate the risk associated with prolonged customer waiting times into the optimal trade-off decisions. For this purpose, we consider a single inventory system that faces Poisson demand and utilizes a base-stock policy to replenish its inventory, which takes a fixed amount of time. The firm implements a preorder strategy, encouraging customers to place their orders a fixed amount of time in advance of their actual needs, a period referred to as the commitment lead time. The firm rewards customers with a bonus termed the commitment cost, which increases with the length of the commitment lead time. We aim to determine the optimal control policy, including the optimal base-stock level and optimal commitment lead time, that minimizes the long-run average cost. The cost includes inventory holding, commitment, and customer waiting costs, with the latter adjusted for the firm’s degree of risk aversion. The optimal policy depends on the interdependence of the decisions, with the optimal commitment lead time following a “bang-bang” pattern, and the corresponding optimal base-stock level taking an “all-or-nothing” form. For linear commitment costs with a cost factor per time unit, we identify a threshold that increases with the firm’s risk aversion degree. Firms with greater risk aversion typically favor the buy-to-order strategy, while those with lower risk aversion may opt for either buy-to-stock or buy-to-order depending on their assessment of waiting costs.


  • Multiobjective Line Balancing Game: Collaboration and Peer Evaluation

    by Taher Ahmadi, Bo van der Rhee

    We introduce a spreadsheet-based game, the multiobjective line balancing (MOLB) game, to teach assembly line balancing as a common topic of discussion in operations research, operations management, supply chain management, or management science courses at the undergraduate or graduate level. The MOLB game was designed based on the triple bottom line framework, in which the economic, social, and environmental aspects of line balancing decisions are simultaneously taken into account. The MOLB game can be played in teams of three or four students. First, each team receives unique information for balancing an assembly line. Each team should find as many feasible balances as possible in a collaborative form and then send the Pareto solution set and the best found solution to a peer team. In the second round of the game, the teams assess the results of a peer team first by trying to find infeasible or non-Pareto solutions and second by attempting to improve on the provided solutions. Finally, the reviewer team presents the results of the peer-review process to the entire class. Supplemental Material: The Teaching Note, instruction video, and MOLB game master file is available at https://www.informs.org/Publications/Subscribe/Access-Restricted-Materials .


  • How to develop standardized work for business processes in the transactional office environment

    by Taher Ahmadi, Nooshin Rahmani

    Standardised Work (STW) is one of the most effective but least utilized Lean tools for business process improvement initiatives in the transactional office environment known as the ‘Lean office’. The STW not only establishes a baseline for continuous improvement initiatives but also facilitates them by giving indications of key improvement opportunities in the present best practice. The STW is a thorough document in which the process workflow is broken into a number of consecutive work elements whose processing times are labelled according to their nature and required resources. Developing the STW for business processes in the manufacturing environment is quite common; however, it is quite rare and limited in the transactional office environment. This is primarily caused by the business-office processes’ complexity or underestimating their influence on overall business success. In this study, we position and highlight the importance of the STW in the Lean office programme and propose a pragmatic and tractable framework for developing the STW for business-office processes through the use of a pilot process. The proposed STW framework was implemented successfully in the pharma industry. Finally, the paper is concluded by discussing the possible obstacles and providing future research directions.


  • Open Access

    Time-based service constraints for inventory systems with commitment lead time

    by Taher Ahmadi, Zümbül Atan, Ton de Kok, Ivo Adan

    We consider a firm which targets a certain level of customer responsiveness with a minimum operational cost. The firm employs a preorder strategy, in which customers place their orders before their actual need based on a predefined time window called commitment lead time and, in turn, they receive a bonus. The firm aims to determine the optimal control policy, which consists of the optimal commitment lead time and the optimal base-stock level, such that the total operational cost is minimized subject to a time-based service level target. We formulate two time-based service criteria to measure the firm’s responsiveness in terms of average customer waiting time and individual customer waiting time in two constraint optimization models called ACO and CCO, respectively. We derive the exact probability distribution of customer waiting time, and we propose exact and heuristic optimization algorithms to solve the ACO and CCO models. We show that the commitment lead time not only increases the firm’s responsiveness level but also decreases the customers’ maximum waiting time. We find that when the firm targets a high level of responsiveness, the value of commitment lead time is more highlighted. We study multiple interesting extensions with two customer classes, random replenishment lead times and a combined model with two time-based service level targets.


  • Open Access

    Optimal control policies for assemble-to-order systems with commitment lead time

    by Taher Ahmadi, Zumbul Atan, Ton de Kok, Ivo Adan

    In this paper, we study a preorder strategy which requires customers to place orders ahead of their actual need. We characterize the preorder strategy by a commitment lead time. We define the commitment lead time as the time that elapses between the moment an order is communicated by the customer and the moment the order must be delivered to the customer. We investigate the value of using this preorder strategy in managing assemble-to-order systems. For this purpose, we consider a manufacturer, who operates an assemble-to-order system with two components and a single end product. The manufacturer uses continuous-review base-stock policies for replenishing component inventories. Customer demand occurs for the end product only and unsatisfied customer demands are backordered. Since customers provide advance demand information by preordering, they receive a bonus. We refer to this bonus from the manufacturer’s perspective as a commitment cost. We determine the optimal component base-stock levels and the optimal length of the commitment lead time, which minimize the sum of long-run average component inventory holding, backordering and commitment costs. We find that the optimal commitment lead time is either zero or equals the replenishment lead time of one of the components. When the optimal commitment lead time is zero, the preorder strategy is not beneficial and the optimal control strategy for both components is buy-to-stock. When the optimal commitment lead time equals the lead time of the component with the shorter lead time, the optimal control strategy for this component is buy-to-order and it is buy-to-stock for the other component. On the other hand, when the optimal commitment lead time equals the lead time of the component with the longer lead time, the optimal control strategy is the buy-to-order strategy for both components. We find the unit commitment cost thresholds which determine the conditions under which one of these three cases hold.


  • Open Access

    Optimal control policies for an inventory system with commitment lead time

    by Taher Ahmadi, Zümbül Atan, Ton de Kok, Ivo Adan

    We consider a firm which faces a Poisson customer demand and uses a base‐stock policy to replenish its inventories from an outside supplier with a fixed lead time. The firm can use a preorder strategy which allows the customers to place their orders before their actual need. The time from a customer's order until the date a product is actually needed is called commitment lead time. The firm pays a commitment cost which is strictly increasing and convex in the length of the commitment lead time. For such a system, we prove the optimality of bang‐bang and all‐or‐nothing policies for the commitment lead time and the base‐stock policy, respectively. We study the case where the commitment cost is linear in the length of the commitment lead time in detail. We show that there exists a unit commitment cost threshold which dictates the optimality of either a buy‐to‐order (BTO) or a buy‐to‐stock strategy. The unit commitment cost threshold is increasing in the unit holding and backordering costs and decreasing in the mean lead time demand. We determine the conditions on the unit commitment cost for profitability of the BTO strategy and study the case with a compound Poisson customer demand.


  • Assemble-to-order systems: A review

    by Zümbül Atan, Taher Ahmadi, Clara Stegehuis, Ton de Kok, Ivo Adan