Robert G. Maliva
Research Subjects
Research Interests
Robert G. Maliva has a total of 19 co-authors. Here are the top co-authors by number of shared publications:
- Thomas M. Missimer
Florida Gulf Coast University, USA
8 shared publications - Weixing Guo
Groundwater Teck Inc., 14542 Indigo Lakes Circle, Naples, FL 34119, USA
3 shared publications - Janet Clements
One Water Econ, 4300 Fernbrook Drive, Loveland, CO 80538, USA
2 shared publications - Jennifer Stokes-Draut
Energy Analysis Division, Lawrence Berkeley National Laboratory
2 shared publications - John L. Largier
Bodega Marine Laboratory, Department of Environmental Science and Policy, University of California, Davis, CA 95616, USA
2 shared publications - Julie Chambon
Ramboll, 1111 Broadway, Suite 1400, Oakland, CA 94607, USA
2 shared publications
Latest Publications
- Open Access
Reclaimed Water ASR in a Sand-and-Gravel Aquifer: Destin Water Users System (Florida, USA)
The beneficial reuse of reclaimed water is a legislative objective of the State of Florida and a critical element in the optimization of water management in areas facing scarcity of freshwater. Aquifer storage and recovery (ASR) of reclaimed allows for the balancing of variations in seasonal and longer-term supply and demand. Destin Water Users, Inc. (DWU), which serves a barrier island community in the Florida panhandle, implemented a groundbreaking ASR system that stores reclaimed water in a shallow sand-and-gravel aquifer. Institutional controls were used to provide additional assurance that public health is protected, and natural contamination attenuation processes are taken advantage of to address arsenic leaching into stored water and disinfection byproducts (trihalomethanes) removal. The DWU ASR system eliminated the need for more expensive and environmentally impactful options for the disposal of excess of reclaimed water and increases the reliability of the reuse system, having the benefit of reserving higher-quality fresh groundwater resources for potable use.
Open AccessReclaimed Water ASR in a Sand-and-Gravel Aquifer: Destin Water Users System (Florida, USA)
The beneficial reuse of reclaimed water is a legislative objective of the State of Florida and a critical element in the optimization of water management in areas facing scarcity of freshwater. Aquifer storage and recovery (ASR) of reclaimed allows for the balancing of variations in seasonal and longer-term supply and demand. Destin Water Users, Inc. (DWU), which serves a barrier island community in the Florida panhandle, implemented a groundbreaking ASR system that stores reclaimed water in a shallow sand-and-gravel aquifer. Institutional controls were used to provide additional assurance that public health is protected, and natural contamination attenuation processes are taken advantage of to address arsenic leaching into stored water and disinfection byproducts (trihalomethanes) removal. The DWU ASR system eliminated the need for more expensive and environmentally impactful options for the disposal of excess of reclaimed water and increases the reliability of the reuse system, having the benefit of reserving higher-quality fresh groundwater resources for potable use.
- Open Access
Seawater Desalination in California: A Proposed Framework for Streamlining Permitting and Facilitating Implementation
Construction of new seawater reverse osmosis desalination (SWRO) plants in the state of California (USA) requires environmental permits containing rather strict conditions. The California Ocean Plan requires the use of subsurface intake systems (SSIs) unless they are deemed to be not feasible. The Governor of California requested that the State Water Resources Control Board (State Board) study the issue of accelerating the desalination plant permitting process and making it more efficient. The State Board formed an independent scientific Panel to study the issue of SSI feasibility and to submit a report. The Panel recommendations included the following: the feasibility assessment (FA) for SSIs should be streamlined for completion within a maximum of three years, and this requirement should be added to the Ocean Plan; applicants need to perform a financial feasibility study before pursuing SSI capacities exceeding 38,000 m3/d (10 MGD) for wells or 100,000 m3/d (25 MGD) for galleries because project financing may be denied for such larger capacity systems; the mitigation options for each site–SSI combination in the screening process should be addressed by both the project proponent and regulatory agencies as early as practicable in the overall permitting process; and the impacts of SSIs on local aquifers and associated wetland systems must be assessed during the analyses conducted during the FA and during post-construction monitoring. The Panel further concluded that the design and evaluation of SSI–site combinations are highly site-specific, involving technically complex issues, which require both the applicant and the reviewing state agencies to have the expertise to design and review the applications. Economic feasibility must consider cost to the consumer and the engineering risk that can preclude project financing. Projected capacities exceeding the above noted limits may not by financed due to risks of failure or could require government guarantees to lenders. The current permitting system in California is likely to preclude construction of large seawater desalination facilities that can provide another source of potable water for coastal communities in California during severe droughts. Without seawater desalination, the potable water supply in California would suffer a greater sustainability and resilience risk during future periods of extended drought.
Open AccessSeawater Desalination in California: A Proposed Framework for Streamlining Permitting and Facilitating Implementation
Construction of new seawater reverse osmosis desalination (SWRO) plants in the state of California (USA) requires environmental permits containing rather strict conditions. The California Ocean Plan requires the use of subsurface intake systems (SSIs) unless they are deemed to be not feasible. The Governor of California requested that the State Water Resources Control Board (State Board) study the issue of accelerating the desalination plant permitting process and making it more efficient. The State Board formed an independent scientific Panel to study the issue of SSI feasibility and to submit a report. The Panel recommendations included the following: the feasibility assessment (FA) for SSIs should be streamlined for completion within a maximum of three years, and this requirement should be added to the Ocean Plan; applicants need to perform a financial feasibility study before pursuing SSI capacities exceeding 38,000 m3/d (10 MGD) for wells or 100,000 m3/d (25 MGD) for galleries because project financing may be denied for such larger capacity systems; the mitigation options for each site–SSI combination in the screening process should be addressed by both the project proponent and regulatory agencies as early as practicable in the overall permitting process; and the impacts of SSIs on local aquifers and associated wetland systems must be assessed during the analyses conducted during the FA and during post-construction monitoring. The Panel further concluded that the design and evaluation of SSI–site combinations are highly site-specific, involving technically complex issues, which require both the applicant and the reviewing state agencies to have the expertise to design and review the applications. Economic feasibility must consider cost to the consumer and the engineering risk that can preclude project financing. Projected capacities exceeding the above noted limits may not by financed due to risks of failure or could require government guarantees to lenders. The current permitting system in California is likely to preclude construction of large seawater desalination facilities that can provide another source of potable water for coastal communities in California during severe droughts. Without seawater desalination, the potable water supply in California would suffer a greater sustainability and resilience risk during future periods of extended drought.
- Open Access
- 26 September 2025
- Published by MDPI AG in Preprints.org
Will Seawater Desalination Play an Important Role in the Future Potable Water Supply of California?
Construction of new seawater reverse osmosis desalination (SWRO) plants in state of California (USA) requires environmental permits containing rather strict conditions. The California Ocean Plan requires the use of subsurface intake systems (SSIs) unless they are deemed to be not feasible. The Governor of California requested that the State Water Resources Control Board (State Board) study the issue of accelerating the desalination plant permitting process and making it more efficient. The State Board formed an independent scientific Panel to study the issue of SSI feasibility and to submit a report. The Panel recommendations included: the feasibility assessment (FA) for SSIs should be streamlined for completion within a maximum of three years, and this requirement should be added to the Ocean Plan; applicants need to perform a financial feasibility study before pursuing SSI capacities exceeding 38,000 m3/d (10 MGD) for wells or 100,000 m3/d (25 MGD) for galleries because project financing may be denied for such larger capacity systems; the mitigation options for each site-SSI combination be in the screening process should be addressed by both the project proponent and regulatory agencies as early as practicable in the overall permitting process; and the impacts of SSIs on local aquifers and associated wetlands systems must be assessed during the analyses conducted during the FA and during post-construction monitoring. The Panel further concluded that the design and evaluation of SSI-site combinations are highly site-specific, involving technically complex issues, which require both the applicant and the reviewing state agencies to have the expertise to design and review the applications. Economic feasibility must consider cost to the consumer and the engineering risk that can preclude project financing. Projected capacities exceeding the above noted limits may not by financed due to risks of failure or could require government guarantees to lenders. The current permitting system in California is likely to preclude construction of large seawater desalination facilities that can provide another source of potable water for coastal communities in California during severe droughts.
- 26 September 2025
- Published by MDPI AG in Preprints.org
Open AccessWill Seawater Desalination Play an Important Role in the Future Potable Water Supply of California?
Construction of new seawater reverse osmosis desalination (SWRO) plants in state of California (USA) requires environmental permits containing rather strict conditions. The California Ocean Plan requires the use of subsurface intake systems (SSIs) unless they are deemed to be not feasible. The Governor of California requested that the State Water Resources Control Board (State Board) study the issue of accelerating the desalination plant permitting process and making it more efficient. The State Board formed an independent scientific Panel to study the issue of SSI feasibility and to submit a report. The Panel recommendations included: the feasibility assessment (FA) for SSIs should be streamlined for completion within a maximum of three years, and this requirement should be added to the Ocean Plan; applicants need to perform a financial feasibility study before pursuing SSI capacities exceeding 38,000 m3/d (10 MGD) for wells or 100,000 m3/d (25 MGD) for galleries because project financing may be denied for such larger capacity systems; the mitigation options for each site-SSI combination be in the screening process should be addressed by both the project proponent and regulatory agencies as early as practicable in the overall permitting process; and the impacts of SSIs on local aquifers and associated wetlands systems must be assessed during the analyses conducted during the FA and during post-construction monitoring. The Panel further concluded that the design and evaluation of SSI-site combinations are highly site-specific, involving technically complex issues, which require both the applicant and the reviewing state agencies to have the expertise to design and review the applications. Economic feasibility must consider cost to the consumer and the engineering risk that can preclude project financing. Projected capacities exceeding the above noted limits may not by financed due to risks of failure or could require government guarantees to lenders. The current permitting system in California is likely to preclude construction of large seawater desalination facilities that can provide another source of potable water for coastal communities in California during severe droughts.
- Open Access
Salinity Barriers to Manage Saltwater Intrusion in Coastal Zone Aquifers During Global Climate Change: A Review and New Perspective
Climate change will have a significant impact on saltwater intrusion in coastal aquifers between now and 2150. Global sea levels are predicted to rise somewhere between 0.5 and 1.8 m. To mitigate sea level rise, coastal aquifers will require intensive management to avoid inland migration of seawater that could impact water supplies. In addition to reducing pumping of freshwater, the construction and operation of salinity barriers will be required in many locations. Eleven types of salinity barriers were investigated, including physical barriers (curtain wall and grout curtains), infiltration canals filled with freshwater paralleling the coastline, injection of freshwater (treated surface water or wastewater), pumping or abstraction barriers, mixed injection and abstraction barriers, combined abstraction, desalination, and recharge (ADR), ADR hybrid barriers using various water sources including desalinated water and treated wastewater, compressed air barriers, aquifer storage and recovery dual use systems, biofilm barriers, and clay swelling or dispersion barriers. Feasibility of the use of each salinity barrier type was evaluated within the context of the most recent projections of sea level changes. Key factors used in the evaluation included local hydrogeology, land surface slope, water use, the rate of sea level rise, technical feasibility (operational track record), and economics.
Open AccessSalinity Barriers to Manage Saltwater Intrusion in Coastal Zone Aquifers During Global Climate Change: A Review and New Perspective
Climate change will have a significant impact on saltwater intrusion in coastal aquifers between now and 2150. Global sea levels are predicted to rise somewhere between 0.5 and 1.8 m. To mitigate sea level rise, coastal aquifers will require intensive management to avoid inland migration of seawater that could impact water supplies. In addition to reducing pumping of freshwater, the construction and operation of salinity barriers will be required in many locations. Eleven types of salinity barriers were investigated, including physical barriers (curtain wall and grout curtains), infiltration canals filled with freshwater paralleling the coastline, injection of freshwater (treated surface water or wastewater), pumping or abstraction barriers, mixed injection and abstraction barriers, combined abstraction, desalination, and recharge (ADR), ADR hybrid barriers using various water sources including desalinated water and treated wastewater, compressed air barriers, aquifer storage and recovery dual use systems, biofilm barriers, and clay swelling or dispersion barriers. Feasibility of the use of each salinity barrier type was evaluated within the context of the most recent projections of sea level changes. Key factors used in the evaluation included local hydrogeology, land surface slope, water use, the rate of sea level rise, technical feasibility (operational track record), and economics.
- Open Access
Climate Change and Florida Groundwater Management—Actionable Data and Adaptations
The state of Florida has both a great dependency on groundwater and susceptibility to climate change and thus provides a good case study to examine the amount and quality of information on the potential impacts to groundwater supplies and demands that is available and accessible to decision makers to guide their planning. Decision makers responsible for making and implementing adaptation plans require actionable information that is in a format that they can access and understand and can be used to guide decisions over the usual 20- to 50-year planning periods in the state. The existing climate change projections of higher temperatures and associated evapotranspiration, a modest and geographically variable change in annual rainfall, and sea level rise at close to the global rate provide only limited guidance to the very small segment of society responsible for making adaptation decisions. Instead, decision makers in the water sector will need to increase the resiliency of their systems to be able to handle a wide range of possible future conditions.
Open AccessClimate Change and Florida Groundwater Management—Actionable Data and Adaptations
The state of Florida has both a great dependency on groundwater and susceptibility to climate change and thus provides a good case study to examine the amount and quality of information on the potential impacts to groundwater supplies and demands that is available and accessible to decision makers to guide their planning. Decision makers responsible for making and implementing adaptation plans require actionable information that is in a format that they can access and understand and can be used to guide decisions over the usual 20- to 50-year planning periods in the state. The existing climate change projections of higher temperatures and associated evapotranspiration, a modest and geographically variable change in annual rainfall, and sea level rise at close to the global rate provide only limited guidance to the very small segment of society responsible for making adaptation decisions. Instead, decision makers in the water sector will need to increase the resiliency of their systems to be able to handle a wide range of possible future conditions.
- Open Access
- 7 March 2023
- Published by MDPI AG in Sustainability
- Vol. 15 (6) , 4713
Pumping-Induced Feed Water Quality Variation and Its Impacts on the Sustainable Operation of a Brackish Water Reverse Osmosis Desalination Plant, City of Hialeah, Florida, USA
Brackish water reverse osmosis (BWRO) desalination of groundwater is believed to be a sustainable method of providing municipal utilities with a high-quality supply in regions where freshwater sources are stressed and not sustainable. A key aspect of water management is the ability to evaluate an aquifer containing brackish water to ascertain future pumping-induced water quality changes and their impacts on the facility operation and economics. The city of Hialeah, Florida, has operated a BWRO facility for the last 9 years. The facility has a maximum design capacity of about 88,000 m3/d but is currently operating at about 33,000 m3/d. The facility was designed to treat water with a TDS of up to 10,000 mg/L. A detailed hydrogeologic investigation, including groundwater solute-transport modeling, suggested that the salinity of the source water would remain under 10,000 mg/L of TDS during the 30-year life expectancy of the facility. However, after 9 years of operation, it was found that the rate of salinity increase was much higher than predicted (27.5%), at the low rate of 33,000 m3/d. If the faculty was operated at the maximum capacity, the ability of the plant to treat the source water might be between 5 and 10 years. The conceptual model used to guide the solute transport modeling was not accurate for this site because it did not incorporate the apparent enhanced leakance through the basal confining unit below the aquifer. The greater leakance was likely caused by undetected, irregularly distributed fracturing of the underlying confining dolostones. The facility will require a major redesign to upgrade the process to be able to treat seawater at a TDS significantly above 10,000 mg/L in the future, should that occur. While the change will be costly, with a high capital cost to change the process, increased energy consumption, and overall higher water treatment cost, it is still more sustainable and has less environmental impact compared to other alternatives (e.g., treating tidal sources of seawater). The use of electricity from nuclear or solar generation could mitigate the environmental impacts of higher power consumption.
- 7 March 2023
- Published by MDPI AG in Sustainability
- Vol. 15 (6) , 4713
Open AccessPumping-Induced Feed Water Quality Variation and Its Impacts on the Sustainable Operation of a Brackish Water Reverse Osmosis Desalination Plant, City of Hialeah, Florida, USA
Brackish water reverse osmosis (BWRO) desalination of groundwater is believed to be a sustainable method of providing municipal utilities with a high-quality supply in regions where freshwater sources are stressed and not sustainable. A key aspect of water management is the ability to evaluate an aquifer containing brackish water to ascertain future pumping-induced water quality changes and their impacts on the facility operation and economics. The city of Hialeah, Florida, has operated a BWRO facility for the last 9 years. The facility has a maximum design capacity of about 88,000 m3/d but is currently operating at about 33,000 m3/d. The facility was designed to treat water with a TDS of up to 10,000 mg/L. A detailed hydrogeologic investigation, including groundwater solute-transport modeling, suggested that the salinity of the source water would remain under 10,000 mg/L of TDS during the 30-year life expectancy of the facility. However, after 9 years of operation, it was found that the rate of salinity increase was much higher than predicted (27.5%), at the low rate of 33,000 m3/d. If the faculty was operated at the maximum capacity, the ability of the plant to treat the source water might be between 5 and 10 years. The conceptual model used to guide the solute transport modeling was not accurate for this site because it did not incorporate the apparent enhanced leakance through the basal confining unit below the aquifer. The greater leakance was likely caused by undetected, irregularly distributed fracturing of the underlying confining dolostones. The facility will require a major redesign to upgrade the process to be able to treat seawater at a TDS significantly above 10,000 mg/L in the future, should that occur. While the change will be costly, with a high capital cost to change the process, increased energy consumption, and overall higher water treatment cost, it is still more sustainable and has less environmental impact compared to other alternatives (e.g., treating tidal sources of seawater). The use of electricity from nuclear or solar generation could mitigate the environmental impacts of higher power consumption.
- Open Access
Changes in Pumping-Induced Groundwater Quality Used to Supply a Large-Capacity Brackish-Water Desalination Facility, Collier County, Florida: A New Aquifer Conceptual Model
Brackish-water reverse osmosis (BWRO) desalination facilities are designed to treat feedwater within a fixed range in salinity. If the salinity and ion concentrations of the feedwater rises above the maximum design concentrations, then the plant may ultimately fail. BWRO plants typically use groundwater as a feedwater source. Prior to the process design, a detailed groundwater assessment is made to characterize the source aquifer system and to develop a solute-transport model that is used to project the changes in water quality over the expected useful life of the facility. Solute transport-modeling performed for the Collier County (Florida) South BWRO facility, which was designed to produce 30,303 m3/d with an expansion to 75,758 m3/d, used an aquifer system conceptual model that assumed upwards migration over time of brackish waters with higher salinities into the production zones. This conceptual model is typical of how most BWRO systems developed in the United States operate. The original solute transport model predicted a range of increases in dissolved chloride concentrations over a 20-year period from a low of 5 mg/L/yr, a mid-range of 35 mg/L/yr, and a high range of 85 mg/L/yr. Actual data collected over a 11- to 13.5-year period showed that the dissolved chloride concentration average of the feed water decreased by 16 mg/L/yr. The original conceptual model was found to be inaccurate in that it suggested an upwards recharging system, whereas downward leakage (or perhaps lateral migration) of fresher water appears to be occurring in the system. This is an example of a long-term solute-transport model audit, which is rarely performed, in which a new conceptual model was found to be applicable to an aquifer system used to feed a BWRO facility.
Open AccessChanges in Pumping-Induced Groundwater Quality Used to Supply a Large-Capacity Brackish-Water Desalination Facility, Collier County, Florida: A New Aquifer Conceptual Model
Brackish-water reverse osmosis (BWRO) desalination facilities are designed to treat feedwater within a fixed range in salinity. If the salinity and ion concentrations of the feedwater rises above the maximum design concentrations, then the plant may ultimately fail. BWRO plants typically use groundwater as a feedwater source. Prior to the process design, a detailed groundwater assessment is made to characterize the source aquifer system and to develop a solute-transport model that is used to project the changes in water quality over the expected useful life of the facility. Solute transport-modeling performed for the Collier County (Florida) South BWRO facility, which was designed to produce 30,303 m3/d with an expansion to 75,758 m3/d, used an aquifer system conceptual model that assumed upwards migration over time of brackish waters with higher salinities into the production zones. This conceptual model is typical of how most BWRO systems developed in the United States operate. The original solute transport model predicted a range of increases in dissolved chloride concentrations over a 20-year period from a low of 5 mg/L/yr, a mid-range of 35 mg/L/yr, and a high range of 85 mg/L/yr. Actual data collected over a 11- to 13.5-year period showed that the dissolved chloride concentration average of the feed water decreased by 16 mg/L/yr. The original conceptual model was found to be inaccurate in that it suggested an upwards recharging system, whereas downward leakage (or perhaps lateral migration) of fresher water appears to be occurring in the system. This is an example of a long-term solute-transport model audit, which is rarely performed, in which a new conceptual model was found to be applicable to an aquifer system used to feed a BWRO facility.
- Open Access
- 17 May 2021
- Published by IWA Publishing in Water Policy
- Vol. 23 (3) , 521-536
Climate change and water supply: governance and adaptation planning in Florida
Florida has been described as ‘ground zero’ for climate change in the United States with coastal communities vulnerable to sea-level rise and water supplies under threat from saline-water intrusion, changes in precipitation amounts and patterns, and temperature-driven increases in demands. Water utilities and regional suppliers are responsible for their own water supply plans and adaptation strategies, which are developed largely by a relatively small group of technical specialists (internal and contracted). Water supply planning is prescribed by the state water governance system and local community planning processes. The degree of engagement of large coastal communities and water utilities and regional water suppliers in Florida with climate change research is generally high. Climate change-induced impacts to water supplies and demands over the common 20-year planning horizon are likely to be small relative to increases in demand caused by projected on-going population growth and normal climatic variation. Water utilities in Florida have been incidentally moving toward more climate-resilient supplies (e.g., brackish groundwater desalination) due to the unavailability of additional permittable, inexpensive fresh groundwater rather than climate change concerns. Climate change will narrow the alternatives for future water-supply development.
- 17 May 2021
- Published by IWA Publishing in Water Policy
- Vol. 23 (3) , 521-536
Open AccessClimate change and water supply: governance and adaptation planning in Florida
Florida has been described as ‘ground zero’ for climate change in the United States with coastal communities vulnerable to sea-level rise and water supplies under threat from saline-water intrusion, changes in precipitation amounts and patterns, and temperature-driven increases in demands. Water utilities and regional suppliers are responsible for their own water supply plans and adaptation strategies, which are developed largely by a relatively small group of technical specialists (internal and contracted). Water supply planning is prescribed by the state water governance system and local community planning processes. The degree of engagement of large coastal communities and water utilities and regional water suppliers in Florida with climate change research is generally high. Climate change-induced impacts to water supplies and demands over the common 20-year planning horizon are likely to be small relative to increases in demand caused by projected on-going population growth and normal climatic variation. Water utilities in Florida have been incidentally moving toward more climate-resilient supplies (e.g., brackish groundwater desalination) due to the unavailability of additional permittable, inexpensive fresh groundwater rather than climate change concerns. Climate change will narrow the alternatives for future water-supply development.
- 27 January 2021
- Published by Springer Nature
- p. 71-88
Intergovernmental Panel on Climate Change and Global Climate Change Projections
- 27 January 2021
- Published by Springer Nature
- p. 71-88
Intergovernmental Panel on Climate Change and Global Climate Change Projections