Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Jose Ildefonso Udang Rubrico has a total of 29 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Buffer Allocation via Bottleneck-Based Variable Neighborhood Search

    by Sixiao Gao, Toshimitsu Higashi, Toyokazu Kobayashi, Kosuke Taneda, Jose I. U. Rubrico, Jun Ota

    This study addresses the challenging problem of efficient buffer allocation in production lines. Suitable locations for buffer allocation are determined to satisfy the desired throughput, while a suitable balance between solution quality and computation time is achieved. A throughput calculation approach that yields the state probability of production lines is adopted to evaluate the effectiveness of candidate buffer allocation solutions. To generate candidate buffer allocation solutions, an active probability index based on state probability is proposed to rapidly detect suitable locations of buffer allocations. A variable neighborhood search algorithm is used to maintain acceptable solution quality; an additional neighborhood structure is used in the case where no satisfactory solution is generated in the initial neighborhood structure. Extensive numerical experiments demonstrate the efficacy of the proposed approach. The proposed approach can facilitate agile design of production lines in industry by rapidly estimating production line topologies.


  • Open Access

    Efficient Throughput Analysis of Production Lines Based on Modular Queues

    by Sixiao Gao, Jose I. U. Rubrico, Toshimitsu Higashi, Toyokazu Kobayashi, Kosuke Taneda, Jun Ota

    Analyzing throughput is very important for the design, optimization, and management of production lines. In this paper, we present an efficient throughput analysis approach for production lines with merging, splitting, and recirculating topologies. In particular, we define a decomposition regulation based on queue modules for the decomposition of the various topologies, and we improve an iterative approximation method for calculating and iterating the queue module state probabilities until the throughput of the production line is obtained. To decrease the computation time and automate the calculation process of the queue module state probabilities, we build a queue module database that includes the solution equations of common queue module state probabilities. The numerical examples show that our approach calculates the throughput of production lines with merging, splitting, and recirculating topologies with high accuracy (≥90%) and efficiency (completed in ten min). Our contribution is an efficient throughput evaluation methodology that can be used to rapidly estimate the performance and the cost of production lines with various topologies in the conceptual design phase of production lines in the industry.


  • A generalised makespan estimation for shop scheduling problems, using visual data and a convolutional neural network

    by Arent W. De Jong, Jose I. U. Rubrico, Masaru Adachi, Takayuki Nakamura, Jun Ota

    In Shop Scheduling problems, minimising total processing time (makespan) by means of heuristic methods is one of the main goals for throughput optimisation. Furthermore, reliably estimating makespan is critical for new order acceptance and for heuristic method selection. However, heuristic methods solutions either come without estimates or with very slow ones. Current estimation approaches are limited to either the number of heuristic methods accounted for, or to specific Shop Scheduling subproblems. They are especially limited in generalising over shop layout configurations and limited to non-visual data input. In order to overcome these two hurdles, a convolutional neural network algorithm for quick and accurate makespan regression is proposed, applicable to a wide variety of Shop Scheduling Problems. This algorithm allows for an information-rich, visual representation of the problem, that generalises over shop layout configuration. This has not been tried by prior studies, and the authors argue that this is a main contribution of this work. Results are compared to prior approaches in terms of the R2 value. It is shown that, without compromising on estimation performance, the proposed algorithm improves upon prior research by allowing for visual input and for a wider variety of problems in terms of Shop Scheduling layout.


  • Big data in automation: Towards generalized makespan estimation in shop scheduling problems

    by Arent W. de Jong, Jose I. U. Rubrico, Masaru Adachi, Takayuki Nakamura, Jun Ota

    In Shop Scheduling problems, reliably estimating makespan is critical for new order acceptance and efficient scheduling. However, methods estimating the makespan are either slow, not accurate, and/or limited to a specific subproblem. We propose a MultiLayer Perceptron type Neural Network Machine Learning (ML) algorithm for quick and accurate makespan prediction, applicable to a wide variety of Shop Scheduling Problems. A big data training set is acquired. Furthermore, a novel, information preserving mapping is made from Shop Scheduling problem parameters to ML input features. Results are cross validated against three other ML algorithms, as well as compared to related research in terms of the R-squared value, a commonly used performance measure in regression.


  • Teaching Tasks to Multiple Small Robots by Classifying and Splitting a Human Example

    by Jorge David Figueroa Heredia, Jose Ildefonso U. Rubrico, Shouhei Shirafuji, Jun Ota

    [abstFig src='/00290002/14.jpg' width='300' text='Two robots performing the task of opening the folding chair lying on the floor' ] In this study, we present a novel framework to address the problem of teaching manipulation tasks performed by a single human to a set of multiple small robots in a short period. First, we focused on classifying the manipulation style used during a human-performed task. An allocator process is proposed to determine the type and number of robots to be taught based on the capabilities of available robots. Then, according to the detected task requirements, robot behaviors are generated to create robot programs by splitting human demonstration data. Small robots were used to evaluate our approach in four defined tasks that were taught by a single human. Experiments demonstrated the efficiency of the method to classify and judge whether the division of a task is necessary or not. Moreover, robot programs were generated for manipulating selected objects either individually or in a cooperative manner.


  • Compact design of a redundant manipulator system and application to multiple-goal tasks with temporal constraint

    by Lounell Bahoy Gueta, Ryosuke Chiba, Tamio Arai, Tsuyoshi Ueyama, Jose Ildefonso Udang Rubrico, Jun Ota

    This paper aims to design a compact manipulator system consisting of a 6 degree-of-freedom (dof) manipulator and a 1-dof rotary table. It proposes a new compactness measure that considers manipulator swept volume or the space occupied by the system while executing task. Swept volume is crucial because a manipulator has a small footprint but can occupy a substantial space due to its large workspace. Moreover, since compactness can negatively impact manipulator motion, the compact design problem is formulated with motion time or temporal constraint. A best-effort search method is proposed to minimize the swept volume and reduce the motion time to the level of temporal constraint setting. It is carried out by a proposed spatial motion coordination (SMC) for minimizing swept volume and temporal motion coordination (TMC) for reducing motion time. The two schemes are integrated with the base placement optimization, tool attachment optimization and goal rearrangement and are evaluated under various temporal constraint settings. A cross-breed algorithm called STMC utilizing SMC and TMC is then proposed to deal with the limitation. Several optimization frameworks including SMC, TMC and STMC are compared with robot motion simulations. It is found that the ability of SMC and TMC is limited by certain range of the constraint values and STMC is better than the others.


  • Design of AVS/RS under group constraint

    by Motoyuki Ozaki, Toshimitsu Higashi, Taiki Ogata, Tatsunori Hara, Jose Ildefonso Udang Rubrico, Jun Ota

    Distribution centers, which are essential to our society, are becoming increasingly important. Although the efficiency of an AVS/RS (Autonomous vehicle storage and retrieval system) makes it a promising system, there is still much to be studied regarding its effective use and design. This paper proposes a method of designing AVS/RSs through a quantitative consideration of group constraint by utilizing probability theory. The proposed algorithm also deals with the problem of designing the sizes of several buffers, and considers the effect of load fluctuations, which are important for real-world operation, by use of queuing network theory. Effectiveness of the proposed algorithm is shown with simulations of various number of groups, those of various safety factors for fluctuations, and those of various evasion rates for buffer overflow. The design results are shown to be much different from those which do not consider those factors. The results prove that the proposed method provides an accurate quantitative assessment of the AVS/RS’s constraints.


  • Teaching multiple robots by a human

    by Jorge David Figueroa Heredia, Jose Ildefonso U. Rubrico, Jun Ota

    The main function of robots is to assist humans with tasks. We can find successful examples in factories and hospitals. Yet, service mobile robots, designed to help humans in houses, are still in its early stages. The current state of service mobile robotics inspired me to start my research in this field. First, during my Master thesis I developed a semi-direct teaching method for robots. The method conveys human knowledge on how to grasp objects through the use of a teaching tool. I evaluated the method by teaching mobile robots with a parallel gripper. The system met the proposed targets, yet, the results showed me that small robots with limited capabilities cannot be used for many tasks.

  • Online rescheduling of multiple picking agents for warehouse management

    by Jose I.U. Rubrico, Toshimitu Higashi, Hirofumi Tamura, Jun Ota


  • A Fast Scheduler for Multiagent in a Warehouse

    by Jose Ildefonso U. Rubrico, Toshimitsu Higashi, Hirofumi Tamura, Makoto Nikaido, Jun Ota, Ltd. Murata Systems

    A major goal in scheduling multiagent for warehouse picking is to decrease operating cost by minimizing makespan among transport agents. Computational time must be within ten seconds for real-sized instances. Orders are initially batched by solving the split delivery vehicle routing problem, resulting trips are assigned to agents to balance their picking time, and trips are assigned to minimize blocking delays among agents. Simulation results confirmed that our proposal reduces picking time an average of 11.48% over conventional approaches.