    Conflicting interests over hydropower: Identifying and representing stakeholder perspectives on new projects using causal mapping. 

    by Guillaume Voegeli, David Christian Finger

    The evaluation of the stakeholders’ perception of new hydropower projects is essential for assessing public acceptance, ensuring local involvement, and identifying feasible and desirable changes towards sustainable development. This study uses the concept of causal diagrams (CD) to identify the individual perspectives of stakeholders of two new hydropower projects, one in Switzerland (Val d’Ambra project) and one in Iceland (Hvammvirkjun project). For this purpose, semi-structured interviews with relevant stakeholders were conducted, which were then categorized into 5 interest groups. Using the software Atlas.ti, we identified and sequenced the perceived causality of impact pathways of the two projects. The results are exposed in two series of 10 topical causal networks, and two aggregated diagrams. For each case, CDs expose the complexity of multi-sequenced causalities between elements of a very heterogeneous nature, as expected and reported by stakeholders. This approach enables the identification of inter- and intra-group conflicting perspectives, and perceived uncertainties, concerning both subjectives matters along with much more tangible and predictable aspects. Our method enables the identification of areas where further research or better transfer of information between stakeholders is required. It also exposes how hydropower impacts can differ in time and space, when in one case study, intracommunity tensions and conflicts were identified at the earliest project stage, along with psychological distress of some local residents. Based on the presented CD, we conclude that this method can facilitate communication and problem-solving in complex social-environmental situations amid multiple stakeholder categories, which heterogeneity should not be underestimated.This research has been published in Energy Research and Social Science:https://www.sciencedirect.com/science/article/pii/S2214629620304473


  • Open Access

    Framework for Decision-Making Process in Granting Rights to Use Hydropower in the European Context

    by Guillaume Voegeli, Ludovic Gaudard, Franco Romerio, Werner Hediger

    The European electricity landscape is facing an ambivalent situation between: (1) common market platforms; and (2) national and subnational jurisdictions, which impose their specific rules on energy sectors. This particularly affects hydropower, as the latter faces inequalities in the procedures needed for the attribution of water rights. Besides jurisdictional disparities, the European Union requires this attribution to follow competitive processes and the integration of sustainable development goals for energy projects, while other countries connected to the European grid such as Switzerland and Norway still know different procedures and requirements. Therefore, this article addresses concerns regarding the lack of harmonization of water regimes in Europe. Imposing a common jurisdiction to countries connected to the European grid would be politically very challenging. Our approach overcomes this challenge by proposing a process adaptable to specific local rules and allows a comparison of water rights attribution procedures. In this frame, we propose a nine-step process, based on three goals: (1) to enhance competitive access by ensuring the highest rent transfer related to water rights; (2) to prioritize projects closer to sustainability goals; and (3) to ensure the efficiency of the process itself.