Moses Amoasi Acquah
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Moses Amoasi Acquah has a total of 22 co-authors. Here are the top co-authors by number of shared publications:
- Sung-Yul Kim
Department of Electrical Engineering, Hanyang University, Seoul, Korea
5 shared publications - Sekyung Han
Department of Electrical Engineering, Kyungpook National University, Daegu, South Korea
4 shared publications - Daisuke Kodaira
Institute of Systems and Information Engineering, University of Tsukuba, Tsukuba, Ibaraki, Japan
3 shared publications - Byeong-Chan Oh
Department of Electronic and electrical Engineering, Keimyung University, 1095 Dalgubeol-daero, Daegu 42601, Korea
2 shared publications - Dong-Min Kim
Department of Electrical Engineering, DongShin University, Naju 58245, Korea
2 shared publications - Yeong-Geon Son
Department of Electrical Engineering, Keimyung University, Daegu, Korea
2 shared publications
Latest Publications
- Open Access
- 31 August 2026
- Published by Springer Nature in Scientific Reports
Viability assessment of matching control for grid-forming inverters in future low-inertia grids
- 31 August 2026
- Published by Springer Nature in Scientific Reports
Open AccessViability assessment of matching control for grid-forming inverters in future low-inertia grids
- Open Access
- 10 January 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 11, 5850-5863
Spatiotemporal Sequence-to-Sequence Clustering for Electric Load Forecasting
Massive electrical load exhibits many patterns making it difficult for forecast algorithms to generalise well. Most learning algorithms produce a better forecast for dominant patterns in the case of weekday consumption and otherwise for less dominant patterns in weekend and holiday consumption. In view of this, there is the need to cluster the load patterns, so learning algorithms can focus on the patterns independently to produce forecasts with better accuracy for all cases. However, clustering time-series data breaks the time-series dependency, making model training difficult. This paper presents a novel sequence-to-sequence cluster framework to reform time-series dependency after clustering; this enables independent clusters to be modelled using Convolutional Neural Network-Gated Recurrent Unit, which learns spatiotemporal features for future forecasts. A real-world dataset by the Korea Power Exchange composed of nationwide consumption is used for case studies and experiments. Experimental results verify that the proposed study effectively improves the accuracy of electric load forecasting by about 50%, with a WAPE of 0.67%. The proposed method also speeds up the training process of the forecast algorithm by about 35%, given that only a subset of the dataset is trained due to clustering. Korea Water Resources Corporation has implemented the proposed method for load forecasting and system marginal price estimation.
- 10 January 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 11, 5850-5863
Open AccessSpatiotemporal Sequence-to-Sequence Clustering for Electric Load Forecasting
Massive electrical load exhibits many patterns making it difficult for forecast algorithms to generalise well. Most learning algorithms produce a better forecast for dominant patterns in the case of weekday consumption and otherwise for less dominant patterns in weekend and holiday consumption. In view of this, there is the need to cluster the load patterns, so learning algorithms can focus on the patterns independently to produce forecasts with better accuracy for all cases. However, clustering time-series data breaks the time-series dependency, making model training difficult. This paper presents a novel sequence-to-sequence cluster framework to reform time-series dependency after clustering; this enables independent clusters to be modelled using Convolutional Neural Network-Gated Recurrent Unit, which learns spatiotemporal features for future forecasts. A real-world dataset by the Korea Power Exchange composed of nationwide consumption is used for case studies and experiments. Experimental results verify that the proposed study effectively improves the accuracy of electric load forecasting by about 50%, with a WAPE of 0.67%. The proposed method also speeds up the training process of the forecast algorithm by about 35%, given that only a subset of the dataset is trained due to clustering. Korea Water Resources Corporation has implemented the proposed method for load forecasting and system marginal price estimation.
- Open Access
Independent Power Producer Approach to Optimal Design and Operation of IES with Wind Power Plants
In South Korea, Renewable Energy Sources (RES) have been increasing with the application of energy policies, such as Feed in Tariff (FIT) and the Renewable Portfolio Standard (RPS). However, a rapid increase in RES supply leads to an uncertain power supply due to the intermittent output of RES. A representative example is the curtailment of Wind Turbines (WT), which frequently occurs in Jeju Island, South Korea. The proportion of RES power on Jeju Island is 67%, and there are cases where WT is curtailed among the operable sections to maintain the balance of power supply and demand. This paper applies Power-to-Gas (P2G) technology to hydrogenate, store, and utilize unused power to solve this problem. In this paper, Aewol-eup in Jeju Island is selected as a target site for case study. An Integrated Energy System (IES) for various energy operations is designed to control RES output. This paper proposes the optimal facility configuration and finally drives the optimal design and operation solution of IES by analyzing the objective functions and focusing on the Independent Power Producer (IPP) perspective.
Open AccessIndependent Power Producer Approach to Optimal Design and Operation of IES with Wind Power Plants
In South Korea, Renewable Energy Sources (RES) have been increasing with the application of energy policies, such as Feed in Tariff (FIT) and the Renewable Portfolio Standard (RPS). However, a rapid increase in RES supply leads to an uncertain power supply due to the intermittent output of RES. A representative example is the curtailment of Wind Turbines (WT), which frequently occurs in Jeju Island, South Korea. The proportion of RES power on Jeju Island is 67%, and there are cases where WT is curtailed among the operable sections to maintain the balance of power supply and demand. This paper applies Power-to-Gas (P2G) technology to hydrogenate, store, and utilize unused power to solve this problem. In this paper, Aewol-eup in Jeju Island is selected as a target site for case study. An Integrated Energy System (IES) for various energy operations is designed to control RES output. This paper proposes the optimal facility configuration and finally drives the optimal design and operation solution of IES by analyzing the objective functions and focusing on the Independent Power Producer (IPP) perspective.
- Open Access
Life Evaluation of Battery Energy System for Frequency Regulation Using Wear Density Function
Frequency regulation (FR) using a battery energy storage system (BESS) has been expanding because of the growth of renewable energy. This study introduces the wear density function, which considers battery degradation factors such as the rate of current, temperature, and depth of discharge (DOD) to provide a precise lifespan prediction. Furthermore, an equivalent system model is developed to evaluate the FR performance of the BESS for various operating parameters. Finally, a quantitative tradeoff relationship between performance and battery lifecycle is derived from the analysis using operational data of the actual BESS for FR.
Open AccessLife Evaluation of Battery Energy System for Frequency Regulation Using Wear Density Function
Frequency regulation (FR) using a battery energy storage system (BESS) has been expanding because of the growth of renewable energy. This study introduces the wear density function, which considers battery degradation factors such as the rate of current, temperature, and depth of discharge (DOD) to provide a precise lifespan prediction. Furthermore, an equivalent system model is developed to evaluate the FR performance of the BESS for various operating parameters. Finally, a quantitative tradeoff relationship between performance and battery lifecycle is derived from the analysis using operational data of the actual BESS for FR.
- Open Access
- 1 January 2022
- Published by Elsevier in SSRN Electronic Journal
Hierarchical Energy Hub Planning in Integrated Multi-Energy Systems Using Pareto Optimization
The concept of an Energy Hub (EH) is a suitable option for constructing a Multi Energy System (MES). The configuration of equipment in the EH is one of the most important factors for ensuring the efficiency, cost-effectiveness, and reliability of MES. When the EH is operated in a distribution network, its size, and system configuration directly impact the system reliability and cost-effectiveness This paper proposes a hierarchical energy hub planning (HEHP) method for the optimal planning of MES. To analyze the results, the HEHP is modeled in three stages: 1) Power-to-Power (P2P) equipment-based modeling, 2) P2G equipment-based modeling, and 3) Sector Coupling (SC) equipment-based modeling. The proposed method aims to minimize EH's total system cost and reliability costs. Here, the distribution network and various operating characteristics and constraints of EH equipment are modeled. Mixed-integer linear programming (MILP) is used to find optimal HEHP that minimizes both objectives through epsilon constrained Multi-Objective Problem (MOP). The HEHP algorithm provides optimal EH planning through reliability and economic analysis, considering the optimal capacity and location of the EH equipment. The proposed method's effectiveness is verified via a case study analysis regarding a modified IEEE 33 bus system and a 7-node gas network.
- 1 January 2022
- Published by Elsevier in SSRN Electronic Journal
Open AccessHierarchical Energy Hub Planning in Integrated Multi-Energy Systems Using Pareto Optimization
The concept of an Energy Hub (EH) is a suitable option for constructing a Multi Energy System (MES). The configuration of equipment in the EH is one of the most important factors for ensuring the efficiency, cost-effectiveness, and reliability of MES. When the EH is operated in a distribution network, its size, and system configuration directly impact the system reliability and cost-effectiveness This paper proposes a hierarchical energy hub planning (HEHP) method for the optimal planning of MES. To analyze the results, the HEHP is modeled in three stages: 1) Power-to-Power (P2P) equipment-based modeling, 2) P2G equipment-based modeling, and 3) Sector Coupling (SC) equipment-based modeling. The proposed method aims to minimize EH's total system cost and reliability costs. Here, the distribution network and various operating characteristics and constraints of EH equipment are modeled. Mixed-integer linear programming (MILP) is used to find optimal HEHP that minimizes both objectives through epsilon constrained Multi-Objective Problem (MOP). The HEHP algorithm provides optimal EH planning through reliability and economic analysis, considering the optimal capacity and location of the EH equipment. The proposed method's effectiveness is verified via a case study analysis regarding a modified IEEE 33 bus system and a 7-node gas network.
- Open Access
- 29 April 2021
- Published by MDPI AG in Sustainability
- Vol. 13 (9) , 5022
Optimal Operation of a Hybrid Power System as an Island Microgrid in South-Korea
The microgrid is a power distribution system that supplies power from distributed generation to end-users. Demonstration projects and R&D regarding microgrids are currently in development in several advanced countries. In South Korea, renewable energy-based microgrid demonstration projects are carried out mainly as island or university campus grids. These R&D efforts aim to popularize microgrid systems in South Korea while considering the limited land availability, which impedes the widespread distribution of photovoltaic systems and the microgrid market’s growth. This study presents a floating photovoltaic system configured as an island microgrid combined with a hybrid power system. The floating photovoltaic system is configured on an idle water body integrated with an existing pumped hydroelectric system. The integration of a current pumped hydroelectric system minimizes a battery energy storage requirement, which compensates for the renewable energy sources’ intermittent power output. We evaluate the optimal power flow of the setup using a reliability index to ensure a stable power supply within the standalone microgrid and maximize the supply power range according to the demand response.
- 29 April 2021
- Published by MDPI AG in Sustainability
- Vol. 13 (9) , 5022
Open AccessOptimal Operation of a Hybrid Power System as an Island Microgrid in South-Korea
The microgrid is a power distribution system that supplies power from distributed generation to end-users. Demonstration projects and R&D regarding microgrids are currently in development in several advanced countries. In South Korea, renewable energy-based microgrid demonstration projects are carried out mainly as island or university campus grids. These R&D efforts aim to popularize microgrid systems in South Korea while considering the limited land availability, which impedes the widespread distribution of photovoltaic systems and the microgrid market’s growth. This study presents a floating photovoltaic system configured as an island microgrid combined with a hybrid power system. The floating photovoltaic system is configured on an idle water body integrated with an existing pumped hydroelectric system. The integration of a current pumped hydroelectric system minimizes a battery energy storage requirement, which compensates for the renewable energy sources’ intermittent power output. We evaluate the optimal power flow of the setup using a reliability index to ensure a stable power supply within the standalone microgrid and maximize the supply power range according to the demand response.
- Open Access
Online Building Load Management Control with Plugged-in Electric Vehicles Considering Uncertainties
Robust operation of load management control for a building is important to account for the uncertainty in demand as well as any distributed sources connected to the building. This paper discussed an online load management control solution using distributed energy storage (DES) while considering uncertainties in demand as well as DES to reduce peak demand for economic benefit. In recent years’ demand-side management (DSM) solutions using DES such as stationary energy management system (BESS) and plugged-in electric vehicles (PEV) have been popularised. Most of these solutions resort to deterministic load forecast for the day ahead energy scheduling and do not consider the uncertainties in demand and DES making these solutions vulnerable to uncertainties. This study presents an online density demand forecast, k-means clustering of PEV groups and stochastic optimisation for robust operation of BESS and PEV for a building. The proposed method accounts for uncertainties in demand and uncertainties due to mobile energy storage as presented by PEVs. For a case study, we used data obtained from an industrial site in South Korea. The verified results as compared to other methods with a deterministic approach prove the solution is efficient and robust.
Open AccessOnline Building Load Management Control with Plugged-in Electric Vehicles Considering Uncertainties
Robust operation of load management control for a building is important to account for the uncertainty in demand as well as any distributed sources connected to the building. This paper discussed an online load management control solution using distributed energy storage (DES) while considering uncertainties in demand as well as DES to reduce peak demand for economic benefit. In recent years’ demand-side management (DSM) solutions using DES such as stationary energy management system (BESS) and plugged-in electric vehicles (PEV) have been popularised. Most of these solutions resort to deterministic load forecast for the day ahead energy scheduling and do not consider the uncertainties in demand and DES making these solutions vulnerable to uncertainties. This study presents an online density demand forecast, k-means clustering of PEV groups and stochastic optimisation for robust operation of BESS and PEV for a building. The proposed method accounts for uncertainties in demand and uncertainties due to mobile energy storage as presented by PEVs. For a case study, we used data obtained from an industrial site in South Korea. The verified results as compared to other methods with a deterministic approach prove the solution is efficient and robust.
- Open Access
- 15 June 2018
- Published by MDPI AG in Preprints.org
Online Demand Side Management with PEVs Using Stochastic Optimization
This study purposes the use of plug-in electric vehicles for demand side management (DSM) considering uncertainties in demand as well as uncertainties due to mobility of PEV to mitigate peak demand. The solution also seeks to reduce electric cost in addition to reducing the effects of greenhouse gases. In recent years DSM using distributed storage system such as battery energy management system (BESS) and plugged-in electric vehicles (PEV) have become very prevalent with most implementations resorting to deterministic load forecast. These methods do not consider the potential growth in demand making their solutions less robust. In this study we propose a real-time density demand forecast and stochastic optimization for robust operation of PEV for a building. This method accounts for demand uncertainties in addition to uncertainties in mobile energy storage as found in PEV, making the resulting solution robust as compared to the deterministic case. A case study on a real site in South Korea is used for verification and testing. The proposed study is verified and tested against existing algorithms. The result verifies the effectiveness of the proposed approach
- 15 June 2018
- Published by MDPI AG in Preprints.org
Open AccessOnline Demand Side Management with PEVs Using Stochastic Optimization
This study purposes the use of plug-in electric vehicles for demand side management (DSM) considering uncertainties in demand as well as uncertainties due to mobility of PEV to mitigate peak demand. The solution also seeks to reduce electric cost in addition to reducing the effects of greenhouse gases. In recent years DSM using distributed storage system such as battery energy management system (BESS) and plugged-in electric vehicles (PEV) have become very prevalent with most implementations resorting to deterministic load forecast. These methods do not consider the potential growth in demand making their solutions less robust. In this study we propose a real-time density demand forecast and stochastic optimization for robust operation of PEV for a building. This method accounts for demand uncertainties in addition to uncertainties in mobile energy storage as found in PEV, making the resulting solution robust as compared to the deterministic case. A case study on a real site in South Korea is used for verification and testing. The proposed study is verified and tested against existing algorithms. The result verifies the effectiveness of the proposed approach
- Open Access
Real-Time Demand Side Management Algorithm Using Stochastic Optimization
A demand side management technique is deployed along with battery energy-storage systems (BESS) to lower the electricity cost by mitigating the peak load of a building. Most of the existing methods rely on manual operation of the BESS, or even an elaborate building energy-management system resorting to a deterministic method that is susceptible to unforeseen growth in demand. In this study, we propose a real-time optimal operating strategy for BESS based on density demand forecast and stochastic optimization. This method takes into consideration uncertainties in demand when accounting for an optimal BESS schedule, making it robust compared to the deterministic case. The proposed method is verified and tested against existing algorithms. Data obtained from a real site in South Korea is used for verification and testing. The results show that the proposed method is effective, even for the cases where the forecasted demand deviates from the observed demand.
Open AccessReal-Time Demand Side Management Algorithm Using Stochastic Optimization
A demand side management technique is deployed along with battery energy-storage systems (BESS) to lower the electricity cost by mitigating the peak load of a building. Most of the existing methods rely on manual operation of the BESS, or even an elaborate building energy-management system resorting to a deterministic method that is susceptible to unforeseen growth in demand. In this study, we propose a real-time optimal operating strategy for BESS based on density demand forecast and stochastic optimization. This method takes into consideration uncertainties in demand when accounting for an optimal BESS schedule, making it robust compared to the deterministic case. The proposed method is verified and tested against existing algorithms. Data obtained from a real site in South Korea is used for verification and testing. The results show that the proposed method is effective, even for the cases where the forecasted demand deviates from the observed demand.
- Open Access
- 4 April 2018
- Published by MDPI AG in Preprints.org
Real-Time Demand Side Management Algorithm Using Stochastic Optimization
A Demand-side management technique are deployed along with battery energy-storage systems (BESSs) to lower the electricity cost by mitigating the peak load of a building. Most of the existing methods rely on manual operation of the BESS, or even an elaborate building energy-management system resorting to a deterministic method that is susceptible to unforeseen growth in demand. In this study we propose a real-time optimal operating strategy for BESS based on density demand forecast and stochastic optimization. This method takes into consideration uncertainties in demand when accounting for an optimal BESS schedule, making it robust compared to the deterministic case. The proposed method is verified and tested against existing algorithms. Data obtained from a real site in South Korea is used for verification and testing. The results show that the proposed method is effective, even for the cases where the forecasted demand deviates from the observed demand
- 4 April 2018
- Published by MDPI AG in Preprints.org
Open AccessReal-Time Demand Side Management Algorithm Using Stochastic Optimization
A Demand-side management technique are deployed along with battery energy-storage systems (BESSs) to lower the electricity cost by mitigating the peak load of a building. Most of the existing methods rely on manual operation of the BESS, or even an elaborate building energy-management system resorting to a deterministic method that is susceptible to unforeseen growth in demand. In this study we propose a real-time optimal operating strategy for BESS based on density demand forecast and stochastic optimization. This method takes into consideration uncertainties in demand when accounting for an optimal BESS schedule, making it robust compared to the deterministic case. The proposed method is verified and tested against existing algorithms. Data obtained from a real site in South Korea is used for verification and testing. The results show that the proposed method is effective, even for the cases where the forecasted demand deviates from the observed demand