CHCabell Hodge

Cabell Hodge

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Cabell Hodge has a total of 58 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    EVI-LOCATE User Manual

    by Ranjit Desai, Usdod, Cabell Hodge, Shashikiran Peddireddy

    One of the longest stages in the deployment of electric vehicle supply equipment (EVSE) is the initial planning of the infrastructure itself. Engineers and fleet experts from the National Renewable Energy Laboratory (NREL) have supported dozens of charging infrastructure site plans over the past couple decades, including the generation of site schematics, determinations of electric capacity, and estimates for likely costs. As the market for electric vehicles (EVs) has matured, this approach should no longer require a time and personnel intensive process. In order to shorten the time taken to develop site plans and cost estimates, NREL developed a tool that fleet managers, facility managers, electricians, EVSE installers, and members of the public can use to develop initial schematics and ballpark pricing for charging station installations. The Electric Vehicle Infrastructure - Locally Optimized Charger Assessment Tool and Estimator (EVI-LOCATE) provides a structured and consistent way for users to enter information about their planned EVSE project in a relatively simple web-based format. EVI-LOCATE then calculates electrical equipment capacity, wiring runs, and project costs. It produces a site diagram optimized around surface characteristics with differential trenching costs for softscape such as grass compared to hardscape such as asphalt that can be adjusted by users in the tool. It also stores the resulting site plans and costs in a dashboard for access at a later date, including plan revisions if necessary. This document guides users through the EVI-LOCATE screens and associated questions. It contains tip text boxes throughout on how best to interface with the tool and find additional information or context. The appendices contain the assumptions and calculations underpinning the tool. Much of the information for EVI-LOCATE was gathered through industry engagements with EVSE installers, invoices from completed EVSE installations, Gordian's RS Means construction data, and the General Services Administration blanket purchase agreement for EVSE. For a visual tutorial of the tool, users can watch EVI-LOCATE Step-by-Step Video. The tool itself is available at https://evi-locate.nrel.gov.

  • Open Access

    Federal Workplace Charging Program Guide

    by Jesse Bennett, Cabell Hodge, Emily Kotz

    The 2015 Fixing America's Surface Transportation (FAST) Act authorizes the installation, operation, and maintenance of electric vehicle supply equipment (EVSE) for the purpose of recharging employees' privately owned vehicles (POVs) under the custody or control of the General Services Administration (GSA) or a Federal agency. It requires the collection of fees to recover the costs of installing, operating, and maintaining this equipment and imposes reporting requirements. This program guide reviews those requirements, excerpts the relevant language in Appendix A, and describes when and how fees may be required to cover costs of electricity, network costs, EVSE units, and installations in various scenarios. This program guide is designed to support Federal agencies developing and refining workplace charging programs for employee POVs. While it provides guidance and best practices, it does not replace agencywide policies or agency-specific legal counsel. It contains a roadmap for agency workplace charging programs and defines roles and responsibilities. This guide explains how to determine the number of POVs likely to charge at a given site and contains a sample employee survey in Appendix B. It reviews EVSE planning, including unit selection and acquisition, charger location(s), accounting for available power capacity, using existing infrastructure, and funding an incentive program. It also discusses the costs associated with EVSE acquisition, installation, and network management. These costs inform the subsequently provided information, which describes how to amortize costs to determine appropriate fees for each charging session. The final two sections of this guide address aspects of ongoing program management that the facility coordinator should consider and the reporting requirements associated with the FAST Act. The insights in this guide are applicable to all agency-owned and GSA-leased buildings or facilities offering the use of EVSE or a 120-volt receptacle for the purpose of recharging an employee's POV. However, the FAST Act requirements typically do not apply to any building or facility operated and maintained by a third-party vendor offering the use of EVSE as part of a commercial building lease unless the agency is managing the station and/or energy on behalf of the building and collecting POV fees.


  • Open Access

    Electric Vehicle Supply Equipment (EVSE) Site Assessment Report for the U.S. Army Corps of Engineers Chena Site Near Fairbanks, Alaska

    by U.S. Army Corps Of Engineers (Usace), Dana Truffer-Moudra, Eliseo Esparza, Cabell Hodge

    This report presents an analysis of the requirements for charging station installation and electric vehicle operation at the US Army Corps of Engineers - Chena Site, located in a cold weather climate in the Fairbanks North Star Borough, AK. The report includes findings from a site visit, and a detailed electric vehicle (EV) charging site plan with cost estimates. Cost for three 50-ampere pedestal chargers located on the edge of the existing parking lot is estimated at $53,100, and the cost of three 80-ampere chargers is estimated at $89,400. The authors did not assess the cost of a heated garage. The USACE Chena site reaches extreme cold temperatures of -40 Degrees Celsius (-40 Degrees Fahrenheit) and below in a typical winter, often for days on end. Considerations of operating EVs as well as electrical vehicle supply equipment (EVSE) at this site can be applicable to other cold or extremely cold locations. Interviews with EV users in cold climates and a literature review indicated that EVs operate well but have significantly decreased range compared to 21 Degrees Celsius (70 Degrees Fahrenheit) operations. Some strategies such as prewarming the vehicle while it is plugged in and using heated seats and steering wheel instead of cabin heat, can improve cold weather performance. Storing the EV in a garage would mean the battery and cabin are automatically preheated, the battery would not age as rapidly as when the vehicle is stored outside, and problems with charging the vehicle are less likely. Lowest temperate-rated Electric Vehicle Supply Equipment (EVSE), as electric vehicle chargers are known as, are rated to -40 Degrees Celsius (-40 Degrees Fahrenheit), and sometimes malfunction. No EVSE is rated to the temperatures that USACE Chena site experienced for more than a week in winter 2023-4, of -50 Degrees Celsius (-45 Degrees Fahrenheit) and which are typical for the area. If reliability is a must, entities may want to consider a heated garage to minimize potential problems with charging equipment. There is a companion technical report to this titled "Electric Vehicle and Charging Infrastructure Assessment in Cold-Weather Climates: A Case Study of Fairbanks, Alaska" that examines the data on EV and EVSE cold-weather functionality in more detail. (Esparza, Truffer Moudra, and Hodge 2024).

  • Open Access

    Hourly Load Profile Dataset for Federal, State, and Municipal Electric Vehicle Fleets in the United States

    by Mark Singer, Cabell Hodge, Kara Podkaminer, Brennan Borlaug

    The electrification of U.S. federal, state, and municipal fleets is accelerating rapidly, driven by an increased availability of competitive electric vehicle (EV) options and supportive policies and targets. The dataset described in this report, accessible at data.nrel.gov/submissions/280, provides a critical foundation for identifying fleet electricity demand, projecting these future demands, and developing actionable strategies to support the widespread electrification of government fleets. The dataset incorporates available fleet data, including 54% of federal agency vehicles approved for analysis (notably, the U.S. Postal Service is absent). Additionally, it includes data from 50,000 state government vehicles and 94,000 local government vehicles. While this represents a small fraction of the 4.4 million vehicles owned by state and local governments reported by the Federal Highway Administration (2022), the framework supports future expansion as more fleet inventory data become available.

  • Electric Vehicle and Charging Infrastructure Assessment in Cold-Weather Climates: A Case Study of Fairbanks, Alaska

    by U.S. Army Corps Of Engineers, Eliseo Esparza, USDOE Office of Energy Efficiency and Renewable Energy (EERE), Golden National Renewable Energy Laboratory (Nrel), Dana Truffer-Moudra, Cabell Hodge


  • Electric Vehicles as Mobile Power

    by Cabell Hodge, Bhavesh Rathod, Matt Shmigelsky, Mark Singer, Eliseo Esparza, Tom Myers, Anuj Sanghvi, Ranjit Desai, Bill Becker, Haider Niaz, et al.


  • Open Access

    Survey and Gap Prioritization of U.S. Electric Vehicle Charge Management Deployments

    by Doug Black, Nadia Panossian, Jingjing Liu, Bruce Nordman, John Farrell, Cabell Hodge, Andrew Meintz, Muhammad Abdullah, Mithat John Kisacikoglu, Jesse Bennett, et al.

    The goal of this study was to survey and characterize the scope of current technical and programmatic knowledge pertaining to EV charge management technologies and practices in the US and relevant international jurisdictions. This characterization of existing field demonstrations and knowledge derived were used to determine gaps in the SCM demonstration landscape. Addressing these gaps through research and demonstration could increase confidence in the U.S. that load management and EV charge control could achieve overarching societal benefits. A survey of charge management deployments and input from stakeholders was completed to determine the state-of-the-art of smart charge management (SCM) where SCM is defined as controlling the amount of power exchanged between chargers and EVs to meet customers' charging needs while also responding to external power demand or pricing signals to provide load management, resilience, or other benefits to the customer and electric grid. The survey was the basis of the gap analysis in this report and determines which areas are well understood, with high confidence, and which areas need further investigation. Existing examples of EV charge management are characterized here to determine aspects that are ready for widespread deployment and have been demonstrated in the field. These include demonstration studies, pilots, programs, and EV-specific tariffs. In all, 110 examples of charge management were characterized. The data sources were public literature and utility filings as well as targeted interviews. In addition, 43 interviews with stakeholders were conducted with a consistent set of questions used in each interview. This study prioritized gaps in demonstrated SCM capabilities based on 1) Urgency of the particular use-case to offset traditional grid assets, 2) Impact, extensibility, and scaling of results across the entire spectrum of 3000+ utility service territories including projected technical and market potential for a given grid service, and 3) Value of federal funding in addressing the gap, including potential to leverage and/or add scope to existing field demonstrations funded by other non-federal funding mechanisms.