Mohamadhossein Noruzoliaee
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Mohamadhossein Noruzoliaee has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
- Bo Zou
University of Illinois Chicago
2 shared publications - Abolfazl (Kouros) Mohammadian
University of Illinois Chicago
1 shared publication Fatemeh Nazari
Ph.D. Student, Dept. of Civil and Materials Engineering, Univ. of Illinois at Chicago, 2095 ERF, 842 W. Taylor St., Chicago, IL 60607-7023
1 shared publication
Latest Publications
- Open Access
- 2 January 2019
- Published by MDPI AG in Infrastructures
- Vol. 4 (1) , 2
Airfield Infrastructure Management Using Network-Level Optimization and Stochastic Duration Modeling
This paper proposes a facility-specific modeling approach to plan maintenance and rehabilitation (M&R) activities on a network of airport runway pavement facilities. The objective of the modeling approach is to minimize system M&R cost while recommending M&R activities for each runway pavement facility over a planning horizon. To do so, pavement condition forecast is derived from estimating stochastic duration models which capture the inherent uncertainty and dynamics in pavement deterioration and impacts of exogenous factors. Building on the pavement condition forecast, a network optimization-based M&R planning framework is developed which accounts for the interdependence of M&R activities among facilities as reflected in (1) the requirement for aggregate pavement performance and (2) simultaneous implementation of a major M&R action on connected facilities. The budget constraint is also respected. The M&R planning framework with the stochastic duration model-based pavement condition forecast is applied to Chicago O’Hare International Airport. It is found that the proposed approach leads to much reduced M&R cost compared to the state-of-the-practice which does not consider the interdependence of M&R activities among different pavement facilities. On the other hand, accounting for the simultaneous implementation of a major M&R action on connected facilities would substantially increase M&R cost.
- 2 January 2019
- Published by MDPI AG in Infrastructures
- Vol. 4 (1) , 2
Open AccessAirfield Infrastructure Management Using Network-Level Optimization and Stochastic Duration Modeling
This paper proposes a facility-specific modeling approach to plan maintenance and rehabilitation (M&R) activities on a network of airport runway pavement facilities. The objective of the modeling approach is to minimize system M&R cost while recommending M&R activities for each runway pavement facility over a planning horizon. To do so, pavement condition forecast is derived from estimating stochastic duration models which capture the inherent uncertainty and dynamics in pavement deterioration and impacts of exogenous factors. Building on the pavement condition forecast, a network optimization-based M&R planning framework is developed which accounts for the interdependence of M&R activities among facilities as reflected in (1) the requirement for aggregate pavement performance and (2) simultaneous implementation of a major M&R action on connected facilities. The budget constraint is also respected. The M&R planning framework with the stochastic duration model-based pavement condition forecast is applied to Chicago O’Hare International Airport. It is found that the proposed approach leads to much reduced M&R cost compared to the state-of-the-practice which does not consider the interdependence of M&R activities among different pavement facilities. On the other hand, accounting for the simultaneous implementation of a major M&R action on connected facilities would substantially increase M&R cost.
- 1 December 2017
- Published by American Society of Civil Engineers (ASCE) in Journal of Infrastructure Systems
- Vol. 23 (4)
Optimal Facility-Specific Inspection and Maintenance Decisions under Measurement Uncertainty: Unifying Framework
Monitoring and maintaining a system of degradable infrastructure facilities imposes considerable costs on transportation agencies. To find the optimal timing and type of maintenance, rehabilitation, and reconstruction (MR&R) activities, Markovian models have been widely used, usually under the assumptions of fixed inspection schedule and error-free measurements. For a system of infrastructure facilities, identifying facility-specific MR&R activities is challenging and has garnered attention only recently. This paper presents a unifying framework that seeks the optimal spatial and temporal distributions of inspection and MR&R (IMR&R) decisions for a system of infrastructure facilities in the presence of measurement uncertainty. The framework is numerically shown to generate aggregate system-level results which are consistent with the findings in the previous research. At the disaggregate level, however, it is found that the timing and type of IMR&R policies for some facilities will impose facility-level costs that do not follow the increasing trend of aggregate system-level costs as the inspection measurement error increases. This highlights the need for adopting the facility-specific approach when planning IMR&R policies for a system of infrastructure facilities.
- 1 December 2017
- Published by American Society of Civil Engineers (ASCE) in Journal of Infrastructure Systems
- Vol. 23 (4)
Optimal Facility-Specific Inspection and Maintenance Decisions under Measurement Uncertainty: Unifying Framework
Monitoring and maintaining a system of degradable infrastructure facilities imposes considerable costs on transportation agencies. To find the optimal timing and type of maintenance, rehabilitation, and reconstruction (MR&R) activities, Markovian models have been widely used, usually under the assumptions of fixed inspection schedule and error-free measurements. For a system of infrastructure facilities, identifying facility-specific MR&R activities is challenging and has garnered attention only recently. This paper presents a unifying framework that seeks the optimal spatial and temporal distributions of inspection and MR&R (IMR&R) decisions for a system of infrastructure facilities in the presence of measurement uncertainty. The framework is numerically shown to generate aggregate system-level results which are consistent with the findings in the previous research. At the disaggregate level, however, it is found that the timing and type of IMR&R policies for some facilities will impose facility-level costs that do not follow the increasing trend of aggregate system-level costs as the inspection measurement error increases. This highlights the need for adopting the facility-specific approach when planning IMR&R policies for a system of infrastructure facilities.