Qunzhan Li
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Qunzhan Li has a total of 36 co-authors. Here are the top co-authors by number of shared publications:
- Xiaohong Huang
School of Electrical Engineering, Southwest Jiaotong University, Chengdu, China
3 shared publications - Fulin Zhou
School of Electrical Engineering, Southwest Jiaotong University, Chengdu, China
2 shared publications - Minwu Chen
School of Electrical Engineering, Southwest Jiaotong University, Chengdu, China
2 shared publications - Bo Wu
Chengdu Shanghua Electric Company Limited
1 shared publication Fenghua Gao
Sch. of Electr. Eng., Southwest Jiaotong Univ., Chengdu, China
1 shared publication- Hang Liu
State Key Laboratory of Power Transmission Equipment & System Security and New Technology Chongqing University Chongqing 400044 People's Republic of China
1 shared publication
Latest Publications
- 15 January 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Transportation Electrification
- Vol. 11 (3) , 7599-7614
A Three-Stage Optimal Energy Management Strategy for Cophase Power Supply Systems With Integration of Renewable Energy
To overcome the load uncertainty of cophase power supply systems, including photovoltaic (PV), hybrid energy storage systems (HESSs), and distribution networks in electrified railways, this article proposed a three-stage optimal energy management strategy. Day-ahead optimization aims to minimize the daily cost of the system. Intraday optimization is implemented based on short-time prediction. Its objective is a hybrid of economic-based optimization and power tracking. It adjusts HESS outputs solved in the day-ahead stage. A techno-economical object is implemented in real-time optimization to reduce electricity prices and improve electricity quality. A linearized battery degradation model is proposed to conquer the difficulty of solving optimal scheduling problems with consideration of battery degradation. Real measured load profiles from a high-speed railway substation are applied to verify the proposed model. The results show that in the day-ahead stage, with the integration of PV and HESS, the daily cost of the system decreased by 6.80%. The intraday optimization and real-time optimization in the proposed model can effectively adjust the HESS output when the actual load varies compared to the reference value. The linearized battery degradation model is proved to be accurate, with an average relative error of 0.8%.
- 15 January 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Transportation Electrification
- Vol. 11 (3) , 7599-7614
A Three-Stage Optimal Energy Management Strategy for Cophase Power Supply Systems With Integration of Renewable Energy
To overcome the load uncertainty of cophase power supply systems, including photovoltaic (PV), hybrid energy storage systems (HESSs), and distribution networks in electrified railways, this article proposed a three-stage optimal energy management strategy. Day-ahead optimization aims to minimize the daily cost of the system. Intraday optimization is implemented based on short-time prediction. Its objective is a hybrid of economic-based optimization and power tracking. It adjusts HESS outputs solved in the day-ahead stage. A techno-economical object is implemented in real-time optimization to reduce electricity prices and improve electricity quality. A linearized battery degradation model is proposed to conquer the difficulty of solving optimal scheduling problems with consideration of battery degradation. Real measured load profiles from a high-speed railway substation are applied to verify the proposed model. The results show that in the day-ahead stage, with the integration of PV and HESS, the daily cost of the system decreased by 6.80%. The intraday optimization and real-time optimization in the proposed model can effectively adjust the HESS output when the actual load varies compared to the reference value. The linearized battery degradation model is proved to be accurate, with an average relative error of 0.8%.
- 7 November 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Transportation Electrification
- Vol. 10 (3) , 5103-5118
Fault Location of AT Traction Network Adopting Bilateral Power Supply Mode Based on Generalized Symmetrical Components Method
Autotransformer (AT) traction network with bilateral power supply mode is an effective and economical electrified railway feeding scheme. However, due to the nonlinear relationship between measured reactance and distance, as well as the complex power flow distribution, the accuracy of fault location is facing severe challenges. This paper proposes a precise fault location method applicable to various fault scenarios in the AT traction network. By employing a generalized symmetrical components method, a composite sequence network model including four-sequence components is developed, and the boundary conditions are derived to describe the characteristics of various fault types. Furthermore, a fault-location algorithm is developed to determine the fault positions based on the busbar voltages and the feeder currents at trackside traction substations. The impact factors, such as the rail impedance and the parameter differences between contact wires and feeder wires, are investigated, and then a reasonable correction method is applied to improve the fault location accuracy. Finally, simulations, experimental setups, and field tests show that the proposed method can obtain accurate fault-location results, with an improvement of at least 29%. Certainly, this work has significant application prospects in fault analysis and location for electrified railways.
- 7 November 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Transportation Electrification
- Vol. 10 (3) , 5103-5118
Fault Location of AT Traction Network Adopting Bilateral Power Supply Mode Based on Generalized Symmetrical Components Method
Autotransformer (AT) traction network with bilateral power supply mode is an effective and economical electrified railway feeding scheme. However, due to the nonlinear relationship between measured reactance and distance, as well as the complex power flow distribution, the accuracy of fault location is facing severe challenges. This paper proposes a precise fault location method applicable to various fault scenarios in the AT traction network. By employing a generalized symmetrical components method, a composite sequence network model including four-sequence components is developed, and the boundary conditions are derived to describe the characteristics of various fault types. Furthermore, a fault-location algorithm is developed to determine the fault positions based on the busbar voltages and the feeder currents at trackside traction substations. The impact factors, such as the rail impedance and the parameter differences between contact wires and feeder wires, are investigated, and then a reasonable correction method is applied to improve the fault location accuracy. Finally, simulations, experimental setups, and field tests show that the proposed method can obtain accurate fault-location results, with an improvement of at least 29%. Certainly, this work has significant application prospects in fault analysis and location for electrified railways.
- Open Access
- 17 November 2022
- Published by Springer Nature in Railway Engineering Science
- Vol. 31 (1) , 75-88
Electrical characteristics of new three-phase traction power supply system for rail transit
A novel three-phase traction power supply system is proposed to eliminate the adverse effects caused by electric phase separation in catenary and accomplish a unifying manner of traction power supply for rail transit. With the application of two-stage three-phase continuous power supply structure, the electrical characteristics exhibit new features differing from the existing traction system. In this work, the principle for voltage levels determining two-stage network is dissected in accordance with the requirements of traction network and electric locomotive. The equivalent model of three-phase traction system is built for deducing the formula of current distribution and voltage losses. Based on the chain network model of the traction network, a simulation model is established to analyze the electrical characteristics such as traction current distribution, voltage losses, system equivalent impedance, voltage distribution, voltage unbalance and regenerative energy utilization. In a few words, quite a lot traction current of about 99% is undertaken by long-section cable network. The proportion of system voltage losses is small attributed to the two-stage three-phase power supply structure, and the voltage unbalance caused by impedance asymmetry of traction network is less than 1‰. In addition, the utilization rate of regenerative energy for locomotive achieves a significant promotion of over 97%.
- 17 November 2022
- Published by Springer Nature in Railway Engineering Science
- Vol. 31 (1) , 75-88
Open AccessElectrical characteristics of new three-phase traction power supply system for rail transit
A novel three-phase traction power supply system is proposed to eliminate the adverse effects caused by electric phase separation in catenary and accomplish a unifying manner of traction power supply for rail transit. With the application of two-stage three-phase continuous power supply structure, the electrical characteristics exhibit new features differing from the existing traction system. In this work, the principle for voltage levels determining two-stage network is dissected in accordance with the requirements of traction network and electric locomotive. The equivalent model of three-phase traction system is built for deducing the formula of current distribution and voltage losses. Based on the chain network model of the traction network, a simulation model is established to analyze the electrical characteristics such as traction current distribution, voltage losses, system equivalent impedance, voltage distribution, voltage unbalance and regenerative energy utilization. In a few words, quite a lot traction current of about 99% is undertaken by long-section cable network. The proportion of system voltage losses is small attributed to the two-stage three-phase power supply structure, and the voltage unbalance caused by impedance asymmetry of traction network is less than 1‰. In addition, the utilization rate of regenerative energy for locomotive achieves a significant promotion of over 97%.
- Open Access
- 28 February 2020
- Published by Springer Nature in Railway Engineering Science
- Vol. 28 (1) , 85-96
Power management in co-phase traction power supply system with super capacitor energy storage for electrified railways
Increasing railway traffic and energy utilization issues prompt electrified railway systems to be more economical, efficient and sustainable. As regenerative braking energy in railway systems has huge potential for optimized utilization, a lot of research has been focusing on how to use the energy efficiently and gain sustainable benefits. The energy storage system is an alternative because it not only deals with regenerative braking energy but also smooths drastic fluctuation of load power profile and optimizes energy management. In this work, we propose a co-phase traction power supply system with super capacitor (CSS_SC) for the purpose of realizing the function of energy management and power quality management in electrified railways. Besides, the coordinated control strategy is presented to match four working modes, including traction, regenerative braking, peak shaving and valley filling. A corresponding simulation model is built in MATLAB/Simulink to verify the feasibility of the proposed system under dynamic working conditions. The results demonstrate that CSS_SC is flexible to deal with four different working conditions and can realize energy saving within the allowable voltage unbalance of 0.008% in simulation in contrast to 1.3% of the standard limit. With such a control strategy, the performance of super capacitor is controlled to comply with efficiency and safety constraints. Finally, a case study demonstrates the improvement in power fluctuation with the valley-to-peak ratio reduced by 20.3% and the daily load factor increased by 17.9%.
- 28 February 2020
- Published by Springer Nature in Railway Engineering Science
- Vol. 28 (1) , 85-96
Open AccessPower management in co-phase traction power supply system with super capacitor energy storage for electrified railways
Increasing railway traffic and energy utilization issues prompt electrified railway systems to be more economical, efficient and sustainable. As regenerative braking energy in railway systems has huge potential for optimized utilization, a lot of research has been focusing on how to use the energy efficiently and gain sustainable benefits. The energy storage system is an alternative because it not only deals with regenerative braking energy but also smooths drastic fluctuation of load power profile and optimizes energy management. In this work, we propose a co-phase traction power supply system with super capacitor (CSS_SC) for the purpose of realizing the function of energy management and power quality management in electrified railways. Besides, the coordinated control strategy is presented to match four working modes, including traction, regenerative braking, peak shaving and valley filling. A corresponding simulation model is built in MATLAB/Simulink to verify the feasibility of the proposed system under dynamic working conditions. The results demonstrate that CSS_SC is flexible to deal with four different working conditions and can realize energy saving within the allowable voltage unbalance of 0.008% in simulation in contrast to 1.3% of the standard limit. With such a control strategy, the performance of super capacitor is controlled to comply with efficiency and safety constraints. Finally, a case study demonstrates the improvement in power fluctuation with the valley-to-peak ratio reduced by 20.3% and the daily load factor increased by 17.9%.
- Open Access
- 20 November 2018
- Published by Springer Nature in Journal of Modern Power Systems and Clean Energy
- Vol. 7 (3) , 644-657
Transient power quality disturbance denoising and detection based on improved iterative adaptive kernel regression
- 20 November 2018
- Published by Springer Nature in Journal of Modern Power Systems and Clean Energy
- Vol. 7 (3) , 644-657
Open AccessTransient power quality disturbance denoising and detection based on improved iterative adaptive kernel regression
- Open Access
Optimized Sizing and Scheduling of Hybrid Energy Storage Systems for High-Speed Railway Traction Substations
The integration of hybrid energy storage systems (HESS) in alternating current (AC) electrified railway systems is attracting widespread interest. However, little attention has been paid to the interaction of optimal size and daily dispatch of HESS within the entire project period. Therefore, a novel bi-level model of railway traction substation energy management (RTSEM) system is developed, which includes a slave level of diurnal HESS dispatch and a master level of HESS sizing. The slave level is formulated as a mixed integer linear programming (MILP) model by coordinating HESS, traction load, regenerative braking energy and renewable energy. As for the master level model, comprehensive cost study within the project period is conducted, with batteries degradation and replacement cost taken into account. Grey wolf optimization technique with embedded CPLEX solver is utilized to solve this RTSEM problem. The proposed model is tested with a real high-speed railway line case in China. The simulation results of several cases with different system elements are presented, and the sensitivity analyses of several parameters are also performed. The obtained results reveal that it shows significant economic-saving potentials with the integration of HESS and renewable energy.
Open AccessOptimized Sizing and Scheduling of Hybrid Energy Storage Systems for High-Speed Railway Traction Substations
The integration of hybrid energy storage systems (HESS) in alternating current (AC) electrified railway systems is attracting widespread interest. However, little attention has been paid to the interaction of optimal size and daily dispatch of HESS within the entire project period. Therefore, a novel bi-level model of railway traction substation energy management (RTSEM) system is developed, which includes a slave level of diurnal HESS dispatch and a master level of HESS sizing. The slave level is formulated as a mixed integer linear programming (MILP) model by coordinating HESS, traction load, regenerative braking energy and renewable energy. As for the master level model, comprehensive cost study within the project period is conducted, with batteries degradation and replacement cost taken into account. Grey wolf optimization technique with embedded CPLEX solver is utilized to solve this RTSEM problem. The proposed model is tested with a real high-speed railway line case in China. The simulation results of several cases with different system elements are presented, and the sensitivity analyses of several parameters are also performed. The obtained results reveal that it shows significant economic-saving potentials with the integration of HESS and renewable energy.
- Open Access
- 6 April 2016
- Published by Springer Nature in Journal of Modern Transportation
- Vol. 24 (2) , 103-113
Industrial frequency single-phase AC traction power supply system for urban rail transit and its key technologies
- 6 April 2016
- Published by Springer Nature in Journal of Modern Transportation
- Vol. 24 (2) , 103-113
Open AccessIndustrial frequency single-phase AC traction power supply system for urban rail transit and its key technologies
- 12 March 2016
- Published by Springer Nature
- p. 243-255
Hybrid Integrated Power Flow Controller for Cophase Traction Power Systems in Electrified Railway
- 12 March 2016
- Published by Springer Nature
- p. 243-255
Hybrid Integrated Power Flow Controller for Cophase Traction Power Systems in Electrified Railway
- Open Access
- 29 January 2015
- Published by Springer Nature in Journal of Modern Transportation
- Vol. 23 (1) , 1-11
New generation traction power supply system and its key technologies for electrified railways
- 29 January 2015
- Published by Springer Nature in Journal of Modern Transportation
- Vol. 23 (1) , 1-11
Open AccessNew generation traction power supply system and its key technologies for electrified railways