Shu-Gang Li
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Shu-Gang Li has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Haiqing Shuang
Key Laboratory of Western Mine Exploitation and Hazard Prevention Ministry of Education, Xi’an University of Science and Technology, Xi’an 710054, China
2 shared publications - Ki-Il Song
Dept. of Civil Engineering, Inha University, Incheon, Korea
2 shared publications - Gao-Feng Chen
College of Safety Science and Engineering, Xi’an University of Science and Technology, Xi’an 710054, P. R.China / Room 1501, College of Mechanical and Electrical Engineering, China University of Mining & Technology, No. 58 Yan Ta Road , Xi’an, 710054, Sha
1 shared publication - Hong-Sheng Wang
School of Energy Engineering, Xi’an University of Science and Technology, Xi’an 710054, China
1 shared publication - Lang Liu
College of Energy and Mining Engineering, Xi’an University of Science and Technology, Xi’an 710054, China
1 shared publication Liang-Chang Shen
College of Energy Engineering, Xi’an University of Science and Technology, Xi’an 710054, P. R. China / Room 9605, College of Energy Engineering, China University of Mining & Technology, No. 58 Yan Ta Road , Xi’an, 710054, Shaanxi Province, P. R. China
1 shared publication
Latest Publications
- Open Access
- 1 April 2018
- Published by University of Slavonski Brod in Tehnicki vjesnik - Technical Gazette
- Vol. 25 (2) , 492-501
Influence Mechanism of Main Roof Height on Surrounding Rock Stability of Gob-Side Entry Driving
The main roof directly affects the stress environment and the control effect of the surrounding rock of gob-side entry driving. A mechanical model of the surrounding rock of gob-side entry driving was established to analyze the influence...
- 1 April 2018
- Published by University of Slavonski Brod in Tehnicki vjesnik - Technical Gazette
- Vol. 25 (2) , 492-501
Open AccessInfluence Mechanism of Main Roof Height on Surrounding Rock Stability of Gob-Side Entry Driving
The main roof directly affects the stress environment and the control effect of the surrounding rock of gob-side entry driving. A mechanical model of the surrounding rock of gob-side entry driving was established to analyze the influence...
- Open Access
- 7 February 2017
- Published by MDPI AG in Sustainability
- Vol. 9 (2) , 223
Extraction of Pressurized Gas in Low Air-Conductivity Coal Seam Using Drainage Roadway
A drainage roadway was constructed in the fractured zone beside an air-return roadway of a mining site. However, drainage roadways serve only one working face and are discarded after mining, thus weakening sustainable mining practices. To improve the sustainability at mining sites, this paper proposes a new drainage roadway that can serve two adjacent working faces. A schematic layout of the proposed lateral high drainage roadway (LHDR) is presented. The LHDR can be used to extract pressurized gas from two neighboring mining zones. A theoretical study, numerical simulation, and field observations were performed to identify the mining-induced fractures and stress distribution. The layout of the LHDR and the optimal position of the extraction boreholes were derived considering the geological conditions in the Liyazhuang Coal Mine in China. A borehole and LHDR were installed at the specified mining site and the rock displacement of the LHDR and gas concentration at branch pipelines, boreholes of the LHDR, and upper part of the working face were monitored during mining. The performance of the LHDR was validated.
- 7 February 2017
- Published by MDPI AG in Sustainability
- Vol. 9 (2) , 223
Open AccessExtraction of Pressurized Gas in Low Air-Conductivity Coal Seam Using Drainage Roadway
A drainage roadway was constructed in the fractured zone beside an air-return roadway of a mining site. However, drainage roadways serve only one working face and are discarded after mining, thus weakening sustainable mining practices. To improve the sustainability at mining sites, this paper proposes a new drainage roadway that can serve two adjacent working faces. A schematic layout of the proposed lateral high drainage roadway (LHDR) is presented. The LHDR can be used to extract pressurized gas from two neighboring mining zones. A theoretical study, numerical simulation, and field observations were performed to identify the mining-induced fractures and stress distribution. The layout of the LHDR and the optimal position of the extraction boreholes were derived considering the geological conditions in the Liyazhuang Coal Mine in China. A borehole and LHDR were installed at the specified mining site and the rock displacement of the LHDR and gas concentration at branch pipelines, boreholes of the LHDR, and upper part of the working face were monitored during mining. The performance of the LHDR was validated.