Min Wang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Min Wang has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Dechao Hu
School of Hydropower and Information Engineering, Huazhong University of Science and Technology, Wuhan 430074, China
2 shared publications - Shiming Yao
Changjiang River Scientific Research Institute, Wuhan 430010, China
2 shared publications - Zhongwu Jin
River Research Department, Changjiang River Scientific Research Institute, Wuhan 430010, China
2 shared publications Ping Gong
Departments of CRSRI, the Yangtze River Water Conservancy Commission, 430010, WUHAN TEL:13297993848
1 shared publication
Latest Publications
- Open Access
- 1 November 2019
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 7 (11) , 390
Study on the Spillover of Sediment during Typical Tidal Processes in the Yangtze Estuary Using a High-Resolution Numerical Model
Because of special morphologies and complex runoff–tide interactions, the landward floodtide flows in Yangtze Estuary are observed to spill over from the North to the South Branches, carrying a lot of sediment. To quantitatively clarify the spillover problem, a two-dimensional numerical model using a high-resolution channel-refined unstructured grid is developed for the entire Yangtze Estuary from Datong to river mouths (620 km) and part of the East Sea. The developed model ensures a good description of the river-coast-ocean coupling, the irregular boundaries, and local river regimes in the Yangtze Estuary. In tests, the simulated histories of the tidal level, depth-averaged velocity, and sediment concentration agree well with field data. The spillover of sediment in the Yangtze Estuary is studied using the condition of a spring and a neap tide in dry seasons. For a representative cross-section in the upper reach of the North Branch (QLG), the difference of the cross-sectional sediment flux (CSSF) between floodtide and ebbtide durations is 43.85–11.26 × 104 t/day, accounting for 37.5–34.9% of the landward floodtide CSSF. The mechanics of sediment spillover in Yangtze Estuary are clarified in terms of a successive process comprising the source, transport, and drainage of the spillover sediment.
- 1 November 2019
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 7 (11) , 390
Open AccessStudy on the Spillover of Sediment during Typical Tidal Processes in the Yangtze Estuary Using a High-Resolution Numerical Model
Because of special morphologies and complex runoff–tide interactions, the landward floodtide flows in Yangtze Estuary are observed to spill over from the North to the South Branches, carrying a lot of sediment. To quantitatively clarify the spillover problem, a two-dimensional numerical model using a high-resolution channel-refined unstructured grid is developed for the entire Yangtze Estuary from Datong to river mouths (620 km) and part of the East Sea. The developed model ensures a good description of the river-coast-ocean coupling, the irregular boundaries, and local river regimes in the Yangtze Estuary. In tests, the simulated histories of the tidal level, depth-averaged velocity, and sediment concentration agree well with field data. The spillover of sediment in the Yangtze Estuary is studied using the condition of a spring and a neap tide in dry seasons. For a representative cross-section in the upper reach of the North Branch (QLG), the difference of the cross-sectional sediment flux (CSSF) between floodtide and ebbtide durations is 43.85–11.26 × 104 t/day, accounting for 37.5–34.9% of the landward floodtide CSSF. The mechanics of sediment spillover in Yangtze Estuary are clarified in terms of a successive process comprising the source, transport, and drainage of the spillover sediment.
- Open Access
- 1 September 2019
- Published by IOP Publishing in IOP Conference Series: Earth and Environmental Science
- Vol. 304 (2) , 022043
After the Three Gorges Project to use the impact analysis by scouring and silting in Poyang Lake control engineering area
Lake control project of Poyang lake is a large scale with a complex operation scheduling, which has an effect on the flood control and environment near the connected area between Poyang lake and Yangtze river. This paper combines one-dimensional and two-dimensional water and sediment mathematical model to calculate and analyze it. The application of a long reach and long term one-dimensional mathematical model from Yichang to Datong provides boundary conditions for the two-dimensional model. Two-dimensional model between part of Yangtze river and Poyang lake is used to calculating the influence caused by lake control project to the bed erosion and deposition between the river and lake after the operation of Three Gorges Reservoir. The research result shows that after a 10-year operation of lake control project, riverbed scouring takes place on a large scale near the connected area as long as the point bar which used to be deposit, and the deepest erosion on bed groove reaches about 1.3m. Sediment scouring takes place on the Yangtze river under the lower Zhangjiazhou channel, but the upper channel changes less relatively.
- 1 September 2019
- Published by IOP Publishing in IOP Conference Series: Earth and Environmental Science
- Vol. 304 (2) , 022043
Open AccessAfter the Three Gorges Project to use the impact analysis by scouring and silting in Poyang Lake control engineering area
Lake control project of Poyang lake is a large scale with a complex operation scheduling, which has an effect on the flood control and environment near the connected area between Poyang lake and Yangtze river. This paper combines one-dimensional and two-dimensional water and sediment mathematical model to calculate and analyze it. The application of a long reach and long term one-dimensional mathematical model from Yichang to Datong provides boundary conditions for the two-dimensional model. Two-dimensional model between part of Yangtze river and Poyang lake is used to calculating the influence caused by lake control project to the bed erosion and deposition between the river and lake after the operation of Three Gorges Reservoir. The research result shows that after a 10-year operation of lake control project, riverbed scouring takes place on a large scale near the connected area as long as the point bar which used to be deposit, and the deepest erosion on bed groove reaches about 1.3m. Sediment scouring takes place on the Yangtze river under the lower Zhangjiazhou channel, but the upper channel changes less relatively.
- Open Access
A Case Study: Response Mechanics of Irregular Rotational Tidal Flows to Outlet Regulation in Yangtze Estuary
Responses of irregular rotational tidal flows to an outlet regulation (the Guyuan Sand (GYS) regulation) in the three-level branching Yangtze Estuary are studied by a high-resolution numerical model and theoretical analysis. The project is launched around GYS at the outlet of the North Branch of the Yangtze Estuary. The tidal flows around GYS are rotational and become irregular under the influences of the runoff-tide interactions, rapidly varying topographies and complex solid boundaries in coastal areas. Three designs of GYS regulation were studied, including various diversion dikes and new outlets of different widths. The regulation disturbs the irregular rotational flows around GYS, and further changes the estuarine tidal processes and the water exchange between different branches of the branching Yangtze Estuary. It was interesting to find that additional current and additional storage are formed along the North Branch when a southward outlet and the clockwise rotational flow met around GYS. This special phenomenon is named “guide effect” in this study. The guide effect, together with common resist effect (arising from the narrowed outlet channel), reshapes the estuarine tidal processes. Based on the simulation result and a theoretical analysis, response mechanics of irregular rotational tidal flows to the outlet regulation in complex branching estuaries are quantitatively studied.
Open AccessA Case Study: Response Mechanics of Irregular Rotational Tidal Flows to Outlet Regulation in Yangtze Estuary
Responses of irregular rotational tidal flows to an outlet regulation (the Guyuan Sand (GYS) regulation) in the three-level branching Yangtze Estuary are studied by a high-resolution numerical model and theoretical analysis. The project is launched around GYS at the outlet of the North Branch of the Yangtze Estuary. The tidal flows around GYS are rotational and become irregular under the influences of the runoff-tide interactions, rapidly varying topographies and complex solid boundaries in coastal areas. Three designs of GYS regulation were studied, including various diversion dikes and new outlets of different widths. The regulation disturbs the irregular rotational flows around GYS, and further changes the estuarine tidal processes and the water exchange between different branches of the branching Yangtze Estuary. It was interesting to find that additional current and additional storage are formed along the North Branch when a southward outlet and the clockwise rotational flow met around GYS. This special phenomenon is named “guide effect” in this study. The guide effect, together with common resist effect (arising from the narrowed outlet channel), reshapes the estuarine tidal processes. Based on the simulation result and a theoretical analysis, response mechanics of irregular rotational tidal flows to the outlet regulation in complex branching estuaries are quantitatively studied.