Nikolay Bykov
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Nikolay Bykov has a total of 11 co-authors. Here are the top co-authors by number of shared publications:
- Ashis Gopal Banerjee
University of Washington
2 shared publications - Santosh Devasia
University of Washington
2 shared publications Ashis G. Banerjee
1 shared publication- Benjamin Wong
Mechanical Engineering Department, University of Washington, Seattle, WA, USA
1 shared publication John Stewart
Department of Mechanical Engineering, University of Washington, Seattle, WA, USA
1 shared publicationSamuel Pedigo
Boeing Company, Everett, WA, USA
1 shared publication
Latest Publications
- 31 December 2022
- Published by Elsevier in Robotics and Autonomous Systems
- Vol. 161
Human-assisted robotic detection of foreign object debris inside confined spaces of marine vessels using probabilistic mapping
- 31 December 2022
- Published by Elsevier in Robotics and Autonomous Systems
- Vol. 161
Human-assisted robotic detection of foreign object debris inside confined spaces of marine vessels using probabilistic mapping
- 22 July 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Robotics and Automation Letters
- Vol. 4 (4) , 3844-3851
An Efficient Scheduling Algorithm for Multi-Robot Task Allocation in Assembling Aircraft Structures
Efficient utilization of cooperating robots in the assembly of aircraft structures relies on balancing the workload of the robots and ensuring collision-free scheduling. We cast this problem as that of allocating a large number of repetitive assembly tasks, such as drilling holes and installing fasteners, among multiple robots. Such task allocation is often formulated as a traveling salesman problem, which is NP-hard, implying that computing an exactly optimal solution is computationally prohibitive for real-world applications. The problem complexity is further exacerbated by intermittent robot failures necessitating real-time task reallocation. In this letter, we present an efficient method that exploits workpart geometry and problem structure to initially generate balanced and conflict-free robot schedules under nominal conditions. Subsequently, we deal with the failures by allowing the robots to first complete their nominal schedules and then employing a market-based optimizer to allocate the leftover tasks. Results show an improvement of 11.5% in schedule efficiency as compared to an optimized greedy multi-agent scheduler on a four robot system, which is especially promising for aircraft assembly processes that take many hours to complete. Moreover, the computation times are similar and small, typically hundreds of milliseconds.
- 22 July 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Robotics and Automation Letters
- Vol. 4 (4) , 3844-3851
An Efficient Scheduling Algorithm for Multi-Robot Task Allocation in Assembling Aircraft Structures
Efficient utilization of cooperating robots in the assembly of aircraft structures relies on balancing the workload of the robots and ensuring collision-free scheduling. We cast this problem as that of allocating a large number of repetitive assembly tasks, such as drilling holes and installing fasteners, among multiple robots. Such task allocation is often formulated as a traveling salesman problem, which is NP-hard, implying that computing an exactly optimal solution is computationally prohibitive for real-world applications. The problem complexity is further exacerbated by intermittent robot failures necessitating real-time task reallocation. In this letter, we present an efficient method that exploits workpart geometry and problem structure to initially generate balanced and conflict-free robot schedules under nominal conditions. Subsequently, we deal with the failures by allowing the robots to first complete their nominal schedules and then employing a market-based optimizer to allocate the leftover tasks. Results show an improvement of 11.5% in schedule efficiency as compared to an optimized greedy multi-agent scheduler on a four robot system, which is especially promising for aircraft assembly processes that take many hours to complete. Moreover, the computation times are similar and small, typically hundreds of milliseconds.