Bambang Purwanggono
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Bambang Purwanggono has a total of 29 co-authors. Here are the top co-authors by number of shared publications:
- Aries Susanty
Department of Industrial Engineering, Diponegoro University, Semarang, Indonesia
2 shared publications A Bachtiar
Industrial Engineering Department, Engineering Faculty, Diponegoro University. Jl. Prof. H. Soedharto, SH. Semarang Indonesia 50275
1 shared publicationAgung Sesuko
Departement of Industrial Engineering Diponegoro University, Semarang, Indonesia
1 shared publicationAnnindya Nur Amalia Annindya Nur Amalia Annindya Nur Amalia
Industrial Engineering Department, Diponegoro University, Semarang, Indonesia
1 shared publicationArfan Bakhtiar
Industrial Engineering Department Faculty of Engineering, Diponegoro University,Jl. Prof. Soedarto, SH, Undip Tembalang Campus, Semarang, Indonesia 50275
1 shared publication- Arfan Bakhtiar
Industrial Engineering Department, Diponegoro University, Semarang, Indonesia
1 shared publication
Latest Publications
- Open Access
- 8 January 2026
- Published by AOSIS in Journal of Transport and Supply Chain Management
- Vol. 20, 19
Overcoming barriers to green procurement: Insights from an integrated model of decision-making trial and evaluation laboratory-interpretive structural modelling in logistics industry
Background: Indonesia’s logistics industry boosts economic growth but harms the environment via plastic waste and carbon emissions – single-use plastics and fossil fuel transport cause persistent pollution. Green procurement (GP) is essential to reduce these impacts by prioritising sustainable suppliers and products despite cost and regulatory challenges. Objectives: The objective of this study is to explore the interconnections and significance of barriers affecting the implementation of GP in Indonesia’s logistics sector. Method: The study employs content validity analysis, decision-making trial and evaluation laboratory (DEMATEL) and interpretive structural modelling (ISM) approaches for data processing. These methods are used to identify, analyse and structure the relationships and hierarchical positioning of the barriers. Results: The study identifies 14 key barriers to the successful implementation of GP in Indonesia’s logistics industry. Key barriers include the lack of eco-friendly materials, insufficient supplier readiness, the absence of regulatory frameworks and inadequate government incentives. These foundational barriers trigger cascading effects that impact both operational and strategic procurement levels. Conclusion: The findings suggest overcoming barriers through targeted supplier training, increasing eco-friendly materials, adopting effective GP regulations and enhancing government incentives, which will reduce environmental impact, promote sustainable logistics practices and support broader environmental sustainability goals. Contribution: This study helps Indonesia’s logistics by providing practical solutions that enable the industry to adopt sustainable practices, reduce environmental impacts and support national sustainability goals.
- 8 January 2026
- Published by AOSIS in Journal of Transport and Supply Chain Management
- Vol. 20, 19
Open AccessOvercoming barriers to green procurement: Insights from an integrated model of decision-making trial and evaluation laboratory-interpretive structural modelling in logistics industry
Background: Indonesia’s logistics industry boosts economic growth but harms the environment via plastic waste and carbon emissions – single-use plastics and fossil fuel transport cause persistent pollution. Green procurement (GP) is essential to reduce these impacts by prioritising sustainable suppliers and products despite cost and regulatory challenges. Objectives: The objective of this study is to explore the interconnections and significance of barriers affecting the implementation of GP in Indonesia’s logistics sector. Method: The study employs content validity analysis, decision-making trial and evaluation laboratory (DEMATEL) and interpretive structural modelling (ISM) approaches for data processing. These methods are used to identify, analyse and structure the relationships and hierarchical positioning of the barriers. Results: The study identifies 14 key barriers to the successful implementation of GP in Indonesia’s logistics industry. Key barriers include the lack of eco-friendly materials, insufficient supplier readiness, the absence of regulatory frameworks and inadequate government incentives. These foundational barriers trigger cascading effects that impact both operational and strategic procurement levels. Conclusion: The findings suggest overcoming barriers through targeted supplier training, increasing eco-friendly materials, adopting effective GP regulations and enhancing government incentives, which will reduce environmental impact, promote sustainable logistics practices and support broader environmental sustainability goals. Contribution: This study helps Indonesia’s logistics by providing practical solutions that enable the industry to adopt sustainable practices, reduce environmental impacts and support national sustainability goals.
- Open Access
- 1 January 2023
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 2683 (1)
Risk assessment on electric motorcycle product development at PT VIS
PT VIS is a company engaged in the automotive industry of electrically powered vehicles. Currently, PT VIS is developing an electric motorcycle product to add to its existing product line. In developing new products, some risks and obstacles cannot be avoided. Therefore, a risk assessment and mitigation actions must be carried out, which can be done using the House of Risk method. Based on the data collection, 17 risk events are relevant to the company. From the data processing that has been done, two risk agents with the most significant Aggregate Risk Potential values were identified, namely the battery with a limited lifetime and poor cooperation between teams. Based on this, preventive actions were modeled to prevent risks. The selected mitigation actions are stock calculation following the demand forecasting carried out, proper battery storage SOPs, more supervision from the head of the department on the team’s performance in the production process, more communicative use of language from the head of the department to the staff, market research more profound into the market trends and target, as well as appropriate calculation in demand forecasting within the market research carried out.
- 1 January 2023
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 2683 (1)
Open AccessRisk assessment on electric motorcycle product development at PT VIS
PT VIS is a company engaged in the automotive industry of electrically powered vehicles. Currently, PT VIS is developing an electric motorcycle product to add to its existing product line. In developing new products, some risks and obstacles cannot be avoided. Therefore, a risk assessment and mitigation actions must be carried out, which can be done using the House of Risk method. Based on the data collection, 17 risk events are relevant to the company. From the data processing that has been done, two risk agents with the most significant Aggregate Risk Potential values were identified, namely the battery with a limited lifetime and poor cooperation between teams. Based on this, preventive actions were modeled to prevent risks. The selected mitigation actions are stock calculation following the demand forecasting carried out, proper battery storage SOPs, more supervision from the head of the department on the team’s performance in the production process, more communicative use of language from the head of the department to the staff, market research more profound into the market trends and target, as well as appropriate calculation in demand forecasting within the market research carried out.
- 19 July 2022
- Published by Springer Nature
- p. 169-178
Investigating Materials for Refurbishment Strategies of Heritage Buildings: A Case Study of Soesman Kantoor, Semarang
- 19 July 2022
- Published by Springer Nature
- p. 169-178
Investigating Materials for Refurbishment Strategies of Heritage Buildings: A Case Study of Soesman Kantoor, Semarang
- 2 June 2022
- Published by Springer Nature in International Journal of Intelligent Transportation Systems Research
- Vol. 20 (2) , 540-559
Proposed Policy to Manage the Barrier of the Implementation of Intelligent Transportation System
- 2 June 2022
- Published by Springer Nature in International Journal of Intelligent Transportation Systems Research
- Vol. 20 (2) , 540-559
Proposed Policy to Manage the Barrier of the Implementation of Intelligent Transportation System
- Open Access
- 1 December 2021
- Published by Politeknik Negeri Semarang in Wahana Teknik Sipil: Jurnal Pengembangan Teknik Sipil
- Vol. 26 (2) , 156-165
KAJIAN PERBANDINGAN PENGARUH PENGGUNAAN BEKISTING ALUMINIUM DAN PERTH CONSTRUCTION HIRE (PCH) DALAM MEWUJUDKAN LEAN CONSTRUCTION
Technological developments have led to innovations in construction materials science, one of which is formwork materials. There are several important aspects in formwork innovation, namely cost, speed, quality, waste, and health safety environtment (HSE), but they have not fully had a positive impact on construction project development. However, it has not fully had a positive impact on construction projects. In addition, what aluminum formwork manufacturers offer so far may not necessarily suit the needs of customers. The purpose of this study is to analyze the comparison in terms of cost, time, waste, and HSE between projects using aluminum formwork and the same project simulated using Formwork Perth Construction Hire (PCH). In this study: (1) simulation on the project if the project uses PCH formwork (2) comparative analysis of products in terms of time, cost, quality, waste, HSE on real projects using aluminum formwork with projects that have been simulated using PCH formwork. The effect of using aluminum formwork when compared to a simulation project using PCH formwork: (1) in terms of the time it can provide 25.92% savings on the total duration of the simulation results project, (2) in terms of costs, it can provide a total cost savings of IDR 895,756,004,00 (3) in terms of quality, the use of aluminum formwork is stronger, durable quality, and the results of the concrete molding are tidier than using PCH formwork (4) in terms of waste, projects that use aluminum formwork produce less waste than using PCH formwork. PCH formwork. (5) in terms of HSE, aluminum formwork is safer, more environmentally friendly because it has minimal waste, and is safe for workers
- 1 December 2021
- Published by Politeknik Negeri Semarang in Wahana Teknik Sipil: Jurnal Pengembangan Teknik Sipil
- Vol. 26 (2) , 156-165
Open AccessKAJIAN PERBANDINGAN PENGARUH PENGGUNAAN BEKISTING ALUMINIUM DAN PERTH CONSTRUCTION HIRE (PCH) DALAM MEWUJUDKAN LEAN CONSTRUCTION
Technological developments have led to innovations in construction materials science, one of which is formwork materials. There are several important aspects in formwork innovation, namely cost, speed, quality, waste, and health safety environtment (HSE), but they have not fully had a positive impact on construction project development. However, it has not fully had a positive impact on construction projects. In addition, what aluminum formwork manufacturers offer so far may not necessarily suit the needs of customers. The purpose of this study is to analyze the comparison in terms of cost, time, waste, and HSE between projects using aluminum formwork and the same project simulated using Formwork Perth Construction Hire (PCH). In this study: (1) simulation on the project if the project uses PCH formwork (2) comparative analysis of products in terms of time, cost, quality, waste, HSE on real projects using aluminum formwork with projects that have been simulated using PCH formwork. The effect of using aluminum formwork when compared to a simulation project using PCH formwork: (1) in terms of the time it can provide 25.92% savings on the total duration of the simulation results project, (2) in terms of costs, it can provide a total cost savings of IDR 895,756,004,00 (3) in terms of quality, the use of aluminum formwork is stronger, durable quality, and the results of the concrete molding are tidier than using PCH formwork (4) in terms of waste, projects that use aluminum formwork produce less waste than using PCH formwork. PCH formwork. (5) in terms of HSE, aluminum formwork is safer, more environmentally friendly because it has minimal waste, and is safe for workers
- Open Access
- 1 February 2021
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 1072 (1) , 012021
Efficiency measurements of Diponegoro University faculty using the Data Envelopment Analysis hierarchical network model
Diponegoro University (UNDIP) is a state university located in Semarang city. UNDIP is aiming to become a world-class university. To become a world-class university, UNDIP has to maintain its quality in academic, research, and community service. But UNDIP was facing some challenges, like has to compete with other universities that growing rapidly. To achieve the target, the efficiency of every faculty in UNDIP should be continuously monitored and improved. Measuring the overall efficiency of every faculty is the aim of this research. The samples used in this research were all faculty of undergraduate programs in UNDIP. The hierarchical network data envelopment analysis model measuring the efficiency level of every faculty at UNDIP for systems with a hierarchical structure. In this research, the input variables used were the number of lecturers, the number of students, and amount of operational expenses. While the output variables were the number of graduates, the number of researches, the number of publications, the number of researches, the number of guidance & consultation, and the number of activities. The results of this study would help the management of university especially the dean of faculty to identify the inefficiency at every faculty in UNDIP and then plan for improvement.
- 1 February 2021
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 1072 (1) , 012021
Open AccessEfficiency measurements of Diponegoro University faculty using the Data Envelopment Analysis hierarchical network model
Diponegoro University (UNDIP) is a state university located in Semarang city. UNDIP is aiming to become a world-class university. To become a world-class university, UNDIP has to maintain its quality in academic, research, and community service. But UNDIP was facing some challenges, like has to compete with other universities that growing rapidly. To achieve the target, the efficiency of every faculty in UNDIP should be continuously monitored and improved. Measuring the overall efficiency of every faculty is the aim of this research. The samples used in this research were all faculty of undergraduate programs in UNDIP. The hierarchical network data envelopment analysis model measuring the efficiency level of every faculty at UNDIP for systems with a hierarchical structure. In this research, the input variables used were the number of lecturers, the number of students, and amount of operational expenses. While the output variables were the number of graduates, the number of researches, the number of publications, the number of researches, the number of guidance & consultation, and the number of activities. The results of this study would help the management of university especially the dean of faculty to identify the inefficiency at every faculty in UNDIP and then plan for improvement.
- Open Access
- 1 August 2019
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 598 (1) , 012115
Critical Success Factors Evaluation of the ISO 50001 Energy Management System Implementation (Case study: PT. APAC INTI CORPORA, Bawen, Semarang Indonesia)
Rapid growth makes the industrial sectors contribute as a significant greenhouse gasses producer. According to the Indonesian Ministry of Industry data, the industrial sectors dominate energy consumption with a share of 49.4% of total national energy consumption. These energy needs tend to increase along with economic growth and global population rise. Based on this problem, development of standards related to energy management system is needed for the industrial sector. PT. APAC INTI CORPORA (AIC) is a textile company, located in Bawen, Semarang Indonesia. PT. AIC has implemented ISO 50001 since 2014 as an energy management system to improve the company’s service quality and financial benefit. In this study, Critical Success Factors from the application of ISO 50001 at PT. AIC will be evaluated to assist companies in implementing a more optimal energy management system. A critical success factor is an area in the form of indicators that identify the success of an organization’s performance. Data processing resulted in 8 improvement strategy points based on importance weights (AHP Method) and performance values (Performance Rating) for each subfactor. Through the Delphi method, the improvement strategies is adjusted to the company’s conditions and reduced to 6 strategy points.
- 1 August 2019
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 598 (1) , 012115
Open AccessCritical Success Factors Evaluation of the ISO 50001 Energy Management System Implementation (Case study: PT. APAC INTI CORPORA, Bawen, Semarang Indonesia)
Rapid growth makes the industrial sectors contribute as a significant greenhouse gasses producer. According to the Indonesian Ministry of Industry data, the industrial sectors dominate energy consumption with a share of 49.4% of total national energy consumption. These energy needs tend to increase along with economic growth and global population rise. Based on this problem, development of standards related to energy management system is needed for the industrial sector. PT. APAC INTI CORPORA (AIC) is a textile company, located in Bawen, Semarang Indonesia. PT. AIC has implemented ISO 50001 since 2014 as an energy management system to improve the company’s service quality and financial benefit. In this study, Critical Success Factors from the application of ISO 50001 at PT. AIC will be evaluated to assist companies in implementing a more optimal energy management system. A critical success factor is an area in the form of indicators that identify the success of an organization’s performance. Data processing resulted in 8 improvement strategy points based on importance weights (AHP Method) and performance values (Performance Rating) for each subfactor. Through the Delphi method, the improvement strategies is adjusted to the company’s conditions and reduced to 6 strategy points.
- Open Access
- 1 January 2019
- Published by Taylor & Francis in Cogent Engineering
- Vol. 6 (1)
Modified assessment tools for measuring innovativeness level of companies
The innovation role in Indonesia as economic growth and prosperity driver has not been fully optimized. Indonesia ranked 88th from 128 countries that included in the list of world’s most innovative countries. It shows that Indonesia must develop and improve itself within several indicators of innovation. One of the assessing aspects is related to the role of industry or company in innovation areas. The companies’ role can be assessed more extensively by assessing the innovative excellence of organizations using assessment tools. By identifying the level of innovativeness maintenance and improvement related to better performance are constantly done. Existing assessment tools are modified in order to result in a framework that is easily understandable and suitable with the background of Indonesian companies. Methods used for modifying assessment tools are Delphi method to validate the research sub-variables, Analytical Hierarchy Process (AHP) method to determine the importance weight of each sub-variable, and in-depth interview method to collect the assessment data. The modified assessment tools can be utilized to analyze the strengths and weaknesses of the company evaluated from the innovation excellence aspects so that the company could then determine the maintenance, improvements and the refinements needed. The score of 1,000 is the maximum value that can be obtained.
- 1 January 2019
- Published by Taylor & Francis in Cogent Engineering
- Vol. 6 (1)
Open AccessModified assessment tools for measuring innovativeness level of companies
The innovation role in Indonesia as economic growth and prosperity driver has not been fully optimized. Indonesia ranked 88th from 128 countries that included in the list of world’s most innovative countries. It shows that Indonesia must develop and improve itself within several indicators of innovation. One of the assessing aspects is related to the role of industry or company in innovation areas. The companies’ role can be assessed more extensively by assessing the innovative excellence of organizations using assessment tools. By identifying the level of innovativeness maintenance and improvement related to better performance are constantly done. Existing assessment tools are modified in order to result in a framework that is easily understandable and suitable with the background of Indonesian companies. Methods used for modifying assessment tools are Delphi method to validate the research sub-variables, Analytical Hierarchy Process (AHP) method to determine the importance weight of each sub-variable, and in-depth interview method to collect the assessment data. The modified assessment tools can be utilized to analyze the strengths and weaknesses of the company evaluated from the innovation excellence aspects so that the company could then determine the maintenance, improvements and the refinements needed. The score of 1,000 is the maximum value that can be obtained.
- Open Access
- 2 October 2018
- Published by EDP Sciences in SHS Web of Conferences
- Vol. 49, 01005
Analysis of ISO 9001:2015 certification readiness of JP-Graha product of Jasaraharja Putera using gap analysis
The fierce competition of global economy requires company to have a good Quality Management System (QMS). Efforts done by the company included applying standards of Quality Management System (QMS) ISO 9001. ISO 9001 is a standard that contains requirements of quality management system, published by the International Organization for Standarization (IOS). The object of this research is JP-GRAHA PT Jasaraharja Putera. JP-GRAHA is one of the product from PT Jasaraharja dealing with fire insurance. JP-GRAHA already implemented ISO 9001:2008. But the implementation of ISO 9001:2008 suffer from a decline in consistency, meanwhile the company must prepare to upgrade into ISO 9001:2015. This research aims to identify the readiness of the company in the facing Certification of ISO 9001:2015 and provide recommendations to improve the readiness of the company. The method used in this research is Gap Analysis to evaluate current company state and assess the readiness of the company in facing certification of ISO 9001:2015. Gap Analysis is a checklist made based on the existing requirements icluded in ISO 9001:2015. The results from the calculation using the checklist will show how the readiness of JP-GRAHA PT Jasaraharja Putera in light of performing certification of ISO 9001:2015
- 2 October 2018
- Published by EDP Sciences in SHS Web of Conferences
- Vol. 49, 01005
Open AccessAnalysis of ISO 9001:2015 certification readiness of JP-Graha product of Jasaraharja Putera using gap analysis
The fierce competition of global economy requires company to have a good Quality Management System (QMS). Efforts done by the company included applying standards of Quality Management System (QMS) ISO 9001. ISO 9001 is a standard that contains requirements of quality management system, published by the International Organization for Standarization (IOS). The object of this research is JP-GRAHA PT Jasaraharja Putera. JP-GRAHA is one of the product from PT Jasaraharja dealing with fire insurance. JP-GRAHA already implemented ISO 9001:2008. But the implementation of ISO 9001:2008 suffer from a decline in consistency, meanwhile the company must prepare to upgrade into ISO 9001:2015. This research aims to identify the readiness of the company in the facing Certification of ISO 9001:2015 and provide recommendations to improve the readiness of the company. The method used in this research is Gap Analysis to evaluate current company state and assess the readiness of the company in facing certification of ISO 9001:2015. Gap Analysis is a checklist made based on the existing requirements icluded in ISO 9001:2015. The results from the calculation using the checklist will show how the readiness of JP-GRAHA PT Jasaraharja Putera in light of performing certification of ISO 9001:2015