Najat Bara
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Najat Bara has a total of 13 co-authors. Here are the top co-authors by number of shared publications:
- Vincent Giard
LAMSADE, Université Paris-Dauphine, PSL Research University
4 shared publications - Frédéric Gautier
IAE Paris, Université Paris I Panthéon-Sorbonne
3 shared publications - Ahlam Azzamouri
EMINES – School of Industrial Management, Mohammed VI Polytechnic University, Ben Guerir, Morocco
1 shared publication - Frédéric Fontane
EMINES School of Industrial Management, University Mohammed VI Polytechnique, Benguerir, Morocco
1 shared publication Gülgün Alpan
1 shared publication- Hamza Bouzekri
Capgemini Engineering, Direction Recherche and Innovation France
1 shared publication
Latest Publications
- 10 November 2026
- Published by Elsevier in International Journal of Production Economics
- Vol. 304
Optimal investment in pooled maintenance resources under uncertain demand for multi-site production
- 10 November 2026
- Published by Elsevier in International Journal of Production Economics
- Vol. 304
Optimal investment in pooled maintenance resources under uncertain demand for multi-site production
- Open Access
- 9 November 2021
- Published by Association des amis de la Revue Francaise de Gestion Industrielle in Revue Française de Gestion Industrielle
- Vol. 35 (1) , 40-56
Problèmes méthodologiques posés par les systèmes de valorisation dans les modèles économiques de management industriel
La prise de décision en management industriel fait un appel croissant à des modèles d’optimisation comportant un éclairage économique, et donc privilégiant une performance définie en termes d’efficience. Cet éclairage économique implique le recours à un système de coûts qui doit être compatible avec l’impact dans le temps et dans l’espace des décisions envisagées, en raison de leurs incidences sur le compte de résultat. La comptabilité de gestion est fondée sur un certain nombre d’hypothèses relatives au fonctionnement du système productif qui peuvent être assez éloignées de celles utilisées dans la modélisation décisionnelle. En outre, certains de ces modèles décisionnels utilisent des pénalités qui ne relèvent pas du système comptable. Cet article pointe un ensemble de problèmes méthodologiques induits par l’inadéquation du système de coûts utilisé par de nombreux modèles d’optimisation de management industriel, pouvant conduire à des décisions réputées optimales mais non pertinentes
- 9 November 2021
- Published by Association des amis de la Revue Francaise de Gestion Industrielle in Revue Française de Gestion Industrielle
- Vol. 35 (1) , 40-56
Open AccessProblèmes méthodologiques posés par les systèmes de valorisation dans les modèles économiques de management industriel
La prise de décision en management industriel fait un appel croissant à des modèles d’optimisation comportant un éclairage économique, et donc privilégiant une performance définie en termes d’efficience. Cet éclairage économique implique le recours à un système de coûts qui doit être compatible avec l’impact dans le temps et dans l’espace des décisions envisagées, en raison de leurs incidences sur le compte de résultat. La comptabilité de gestion est fondée sur un certain nombre d’hypothèses relatives au fonctionnement du système productif qui peuvent être assez éloignées de celles utilisées dans la modélisation décisionnelle. En outre, certains de ces modèles décisionnels utilisent des pénalités qui ne relèvent pas du système comptable. Cet article pointe un ensemble de problèmes méthodologiques induits par l’inadéquation du système de coûts utilisé par de nombreux modèles d’optimisation de management industriel, pouvant conduire à des décisions réputées optimales mais non pertinentes
- 15 April 2020
- Published by Taylor & Francis in Production Planning & Control
- Vol. 32 (9) , 699-714
An economic evaluation of operational decisions – an application in scheduling evaluation in fertilizer plants
Operational management is based on decisions that are related to the way resources are used in the short run. Reviewing the choice between several alternative operational decisions requires proper economic evaluation. The information provided by traditional cost accounting is not suitable for direct use at the operational decision-making process. We present an approach that requires identifying the physical consequences of the decisions being assessed, identifying relevant activity driver measures, establishing the material balance and estimating the differential cost by using relevant cost information. We illustrate our proposed approach with a real-life example of fertilizer production order scheduling on parallel and heterogeneous production lines in OCP’s integrated supply chain. The results show that the use of management accounting outputs leads to a biased evaluation of the financial consequences of the decisions. Finally, we point out the relevance of the use of our economic evaluation approach in a decision support system context.
- 15 April 2020
- Published by Taylor & Francis in Production Planning & Control
- Vol. 32 (9) , 699-714
An economic evaluation of operational decisions – an application in scheduling evaluation in fertilizer plants
Operational management is based on decisions that are related to the way resources are used in the short run. Reviewing the choice between several alternative operational decisions requires proper economic evaluation. The information provided by traditional cost accounting is not suitable for direct use at the operational decision-making process. We present an approach that requires identifying the physical consequences of the decisions being assessed, identifying relevant activity driver measures, establishing the material balance and estimating the differential cost by using relevant cost information. We illustrate our proposed approach with a real-life example of fertilizer production order scheduling on parallel and heterogeneous production lines in OCP’s integrated supply chain. The results show that the use of management accounting outputs leads to a biased evaluation of the financial consequences of the decisions. Finally, we point out the relevance of the use of our economic evaluation approach in a decision support system context.
- 19 November 2019
- Published by Taylor & Francis in Logistique & Management
- Vol. 28 (1) , 72-87
Modélisation d’une chaîne logistique hybride par la simulation à évènements discrets
La simulation permet d’évaluer les conséquences, sur le fonctionnement d’un système productif, de décisions opérationnelles dont l’impact est observable à court terme, avec une maille temporelle pas trop fine. Une chaîne logistique hybride (CLH) enchaîne, sans restriction, des processus élémentaires continus et/ou discrets. Actuellement, la modélisation et la simulation d’une telle CLH, au niveau opérationnel, n’est possible avec aucun logiciel commercial, basé sur la simulation à événements discrets (SED), la dynamique des systèmes, l’approche basée-agents ou par la simulation hybride (SH). Ce diagnostic, étayé par plusieurs publications récentes, nous a conduits à ne pas chercher la solution dans le courant de recherche de la SH mais à contourner les difficultés méthodologiques rencontrées par la création d’un jeu de quatre composants génériques, faciles à intégrer dans les principaux simulateurs de type SED. Notre solution a été utilisée avec succès pour la simulation du plus gros complexe industriel de l’industrie du phosphate.
- 19 November 2019
- Published by Taylor & Francis in Logistique & Management
- Vol. 28 (1) , 72-87
Modélisation d’une chaîne logistique hybride par la simulation à évènements discrets
La simulation permet d’évaluer les conséquences, sur le fonctionnement d’un système productif, de décisions opérationnelles dont l’impact est observable à court terme, avec une maille temporelle pas trop fine. Une chaîne logistique hybride (CLH) enchaîne, sans restriction, des processus élémentaires continus et/ou discrets. Actuellement, la modélisation et la simulation d’une telle CLH, au niveau opérationnel, n’est possible avec aucun logiciel commercial, basé sur la simulation à événements discrets (SED), la dynamique des systèmes, l’approche basée-agents ou par la simulation hybride (SH). Ce diagnostic, étayé par plusieurs publications récentes, nous a conduits à ne pas chercher la solution dans le courant de recherche de la SH mais à contourner les difficultés méthodologiques rencontrées par la création d’un jeu de quatre composants génériques, faciles à intégrer dans les principaux simulateurs de type SED. Notre solution a été utilisée avec succès pour la simulation du plus gros complexe industriel de l’industrie du phosphate.
- 16 September 2019
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 58 (18) , 5502-5520
DSS approach for heterogeneous parallel machines scheduling considering proximate supply chain constraints
This paper describes the basis of a Decision Support System (DSS) designed to schedule fertiliser production orders to be delivered within time windows, in plants made up of multiple heterogeneous parallel processors (production lines), considering that fertiliser production rates and nomenclatures depend on lines, that setup times depend on sequence and lines, and taking into account downtime constraints (preventive maintenance …). A mixed linear programming model is encapsulated in the DSS which considers the schedule’s impacts, immediately upstream and downstream of plants in the supply chain. These side-effects may make the proposed solution unfeasible and the DSS helps redefining the problem to avoid them.
- 16 September 2019
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 58 (18) , 5502-5520
DSS approach for heterogeneous parallel machines scheduling considering proximate supply chain constraints
This paper describes the basis of a Decision Support System (DSS) designed to schedule fertiliser production orders to be delivered within time windows, in plants made up of multiple heterogeneous parallel processors (production lines), considering that fertiliser production rates and nomenclatures depend on lines, that setup times depend on sequence and lines, and taking into account downtime constraints (preventive maintenance …). A mixed linear programming model is encapsulated in the DSS which considers the schedule’s impacts, immediately upstream and downstream of plants in the supply chain. These side-effects may make the proposed solution unfeasible and the DSS helps redefining the problem to avoid them.