SASertac Akar

Sertac Akar

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Sertac Akar has a total of 128 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Gravity Well Commercial Economics Assessment: Potential Revenue and Cost: Cooperative Research and Development (Final Report)

    by Dayo Akindipe, Bakersfield Renewell Energy, Merve Turan, Sertac Akar, Wesley Cole, Dora Shlosberg, Nicole Taverna, Stefan Streckfus, Sarah Douglass

    In the Gravity Well Revenue Study, we evaluate the potential revenue from energy storage using historical energy-only electricity prices, forward-looking projections of hourly electricity prices, and actual reported revenue. This analysis examines the impact of storage duration and round-trip efficiency, as well as the location of the storage, on storage revenue within the current and projected U.S. power system. We also investigated the impact of round-trip efficiency on storage revenue. We found that the relationship between storage revenue and round-trip efficiency is nonlinear. The value of improved round-trip efficiency declines as round-trip efficiency increases. In the Gravity Well Future Cost Study, we applied learning curves to predict the future cost trajectory of Gravity Wells (GrWs). Two types of analysis were implemented. The first was a bottom-up analysis that used historical learning rates for cost components, such as motors and gearboxes, and cost categories (e.g., engineering and design, etc.) to determine the learning-by-doing based single-factor learning curve. The single factor learning curve expresses the relationship between the cost of GrW and the number of units deployed (or the cumulative capacity). In the second analysis, we predicted future GrW costs via a top-down approach. This approach accounts for historical cost trends in other renewable energy and storage technologies, which have similarities with GrWs. Using a multifactor learning curve that accounts for both intrinsic (cumulative capacity) and extrinsic (the elasticity in the price of steel) factors, we estimated the future cost of GrWs.

  • Open Access

    SolarAPP+ Performance Review (2024 Data)

    by Katie Nissen, Emily Dalecki, Eric O'SHaughnessy, Kaifeng Xu, Sertac Akar, Noah Frey, Pablo Botin, Guilherme Castelao, Jaclyn Tagani

    The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2024, 799 AHJs had expressed interest in the platform, with 264 fully adopting (215) or piloting (49) the platform. In 2024, 861 installers submitted 37,393 permits through the SolarAPP+ platform, including 27,375 permits for PV+storage systems. SolarAPP+ permits accounted for around 43% of all permits issued in all participating AHJs, and more than 60% of all permits in several participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 12 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 18,400 hours of AHJ staff time in 2024. Finally, we estimate that SolarAPP+ eliminated over 100,000 business days in permitting-related delays in 2024.

  • Open Access

    CSP Systems Analysis 2022-2024 (Final Technical Report)

    by Ty Neises, Bill Hamilton, Taylor Brown, Janna Martinek, Parthiv Kurup, Sertac Akar, Josh McTigue, Michael Wagner, Matthew Boyd, Chad Augustine, et al.

    The CSP Systems Analysis project estimates the current market cost of CSP subsystems and technologies for use by the DOE Program and within NREL analysis tools. The project addresses upgrades to NREL's System Advisor Model (SAM) related to CSP, as well as development of new modules within SAM to expand the types of CSP systems that can be simulated and new tools for evaluating CSP subsystem performance or optimizing CSP system layouts, for example, SolarPILOT and SolTrace. The project evaluates the potential cost and performance of new CSP-relevant technologies and generally includes assessment of CSP technologies in support of the DOE subprogram. A primary goal of the CSP System Analysis project is to provide timely and accurate cost data to the DOE to assess the current state of CSP technologies as well as predict performance and cost for pre-commercial and emerging technologies that may impact the industry. Prior work in this task has produced technology cost reports and roadmaps for DOE and highlighted promising research paths that could reduce overall CSP cost, such as the supercritical CO2 power cycle and molten-salt trough systems. CSP Systems Analysis produces modeling tools to evaluate the performance of CSP systems, subsystems, or components, and journal articles, conference papers, technical reports and databases to disseminate information to the CSP industry. CSP technology costs are estimated and tracked using these tools as well as analysis of literature and industry sources. The CSP modeling tools and NREL analysis results are used by researchers; government, financial, and industry analysts; and other CSP stakeholders. The purpose of this final technical report is to summarize the key accomplishments of the past three years of this project. The project was divided into seven separate tasks, and in what follows, we describe the background, objectives, key accomplishments, and path forward for each task within the project, with one section of this report summarizing each task.


  • Open Access

    SolarAPP+ Performance Review: Final Technical Report

    by Emily Dalecki, Sertac Akar, Danny Chang, Jeff Cook, Seth Crew, Jessica de la Paz, Anneliese Fensch, Sushmita Jena, Katie Nissen, Eric O'SHaughnessy, et al.

    The National Renewable Energy Laboratory (NREL) and its project partners have developed the novel Solar Automated Permit Processing plus (SolarAPP+) software platform that provides a flexible, web-based PV-permitting tool for residential systems that can be integrated with existing and complementary software platforms. The main objective of this research is to analyze the implementation of SolarAPP+. Analysis was conducted by identifying the benefits, tradeoffs, and overall performance of SolarAPP+, including achieving its goals of delivering automated, code compliant systems, influencing permitting cycle times, and improving application submittals and/or inspection performance. The NREL team published the results of this analysis in annual SolarAPP+ Performance Review technical reports.

  • RePED 250: Manufacturing and Market Analysis of High-Temperature Alternators

    by Devon Kesseli, Sertac Akar, Jody Robins

    The novel repetitive pulsed electric drill 250 (RePED 250) has the potential to greatly lower the costs and drilling times of geothermal projects. This tool discharges electric pulses through hard rock formations, shattering the rock in tension and allowing it to be quickly removed. One hurdle in bringing this technology to market is the RePED 250 downhole alternator. This component is essential for supplying power to the electronic drilling tool. There are currently no downhole tools on the market that meet the RePED 250 alternator's high temperature and power requirements. This report focuses on the path to commercialization for this novel alternator technology being developed as part of the RePED 250 project. One aim of this work is to identify the geothermal market size for the RePED 250 alternator, as well as other potential markets for this technology outside of geothermal. The geothermal market is very small, with only approximately 13 wells drilled in the United States each year. The worldwide market is several times this size and growing each year. The ability of the RePED 250 technology to drastically reduce the cost of geothermal projects may also lead to an increase in this market size. Technology developed for the high-temperature, high-power RePED 250 alternator can also be used to create high-temperature and high-power motors. These motors and alternators will have potential applications in oil and gas drilling, a $300 billion dollar industry in the United States alone, as well as in more distant industries such as aircraft, weapon systems, space exploration, and electric vehicles. Other aspects of the RePED 250 alternator's path to commercialization are also analyzed, including the supply chain for production materials and potential manufacturing methods. The supply chain and manufacturing practices for low-temperature motors and alternators are well established and require relatively minor changes for the high-temperature and high-power RePED 250 alternator. Sourcing for high-temperature materials has been identified, as well as potential supply chain risks. These most notably include electrical steel and high-temperature samarium cobalt (SmCo) magnets. Overall, these risks are not expected to be significant at the likely manufacturing scale required for the RePED 250.

  • Open Access

    RePED 250: A Revolutionary, High Drilling Rate, High-T Geothermal Drilling System and Companion Power Electronics (Final Report)

    by Devon Kesseli, Kirk Slenes, Steve Pronko, William Moeny, Ben McGilton, Hannes Labuschagne, David Sanabria-Diaz, Joshua Major, Karen Heinselman, Douglas DeVoto, et al.

    Geothermal drilling in the United States is drastically slower and more costly than Oil and Gas drilling, primarily due to the additional challenges in geothermal wells: hard rock types and high temperatures. The Repetitive Pulsed Electric Drill (250 degrees C) (RePED-250), developed by Tetra Corporation has the potential to change this with a novel electro-crushing technology. RePED-250 releases pulses of electricity through the rock, which causes it to break in tension, instead of compression like conventional rotary drilling. The tensile strength of hard rocks like granite is only ~5% of their compressive strength, requiring less energy, time, and wear on the bit than conventional drilling. The RePED drill bit has no moving parts, uses drilling mud to remove rock fragments, and standard drill pipe, enabling a direct transition from conventional drilling systems. The objective of this project is to move RePED technology towards commercial readiness for high-temperature geothermal applications. This involves: 1) Creating high-temperature, high power electronic components for the RePED drill capable of operating at the high temperatures of a geothermal well. The target is a 250 degrees C ambient environment. Specifically, capacitors, high voltage switches, and a downhole generator capable of generating the necessary power. 2) Demonstrating RePED's effectiveness drilling through hard rock (granite) and examining its pathway to commercialization and effect on the US geothermal market. Work on this project has led to significant improvement over the state-of-the-art for all the examined electronics, through design, modeling, and testing of these novel components, though some additional development is still needed to deploy these high-temperature parts in a geothermal well. Besides their use in RePED-250, each component has applications in other industries where the stability of electronics at high-temperature is needed. To address the second barrier to commercialization, a 9" hole was drilled through a sample block of granite, demonstrating the tool's effectiveness in hard rock. The team investigated RePED-250's effect on well cost, and the geothermal industry, through various models described in the report.

  • SolarAPP+ Performance Review (2023 Data)

    by Jeff Cook, Sertac Akar, Danny Chang, Anneliese Fensch, Katie Nissen, Eric O'Shaughnessy, Kaifeng Xu

    The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to AHJs at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2023, the National Renewable Energy Laboratory (NREL) had contacted over 1,700 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 793 AHJs had expressed interest in the platform as of the end of 2023. 161 AHJs had begun piloting the platform and 97 of these had publicly launched the platform by the end of 2023. In 2023, 668 installers submitted 18,906 permits through the SolarAPP+ platform, including 4,834 permits submitted as part of a solar plus storage program. SolarAPP+ permits accounted for around 43% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 14.5 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 7,200 hours of AHJ staff time in 2023. Finally, we estimate that SolarAPP+ eliminated over 150,000 business days in permitting-related delays in 2023.

  • Open Access

    Summary Paper: An Initial Heliostat Supply Chain Analysis

    by Parthiv Kurup, Sertac Akar, Chad Augustine, David Feldman

    This paper summarizes the prior analysis, key findings, and recommendations from the published report titled “Initial Heliostat Supply Chain Analysis” [1]. Globally, the growing demand for concentrating solar power (CSP) technologies, primarily for electricity generation plants has been met with supply chains primarily composed of plentiful commodity materials such as steel, aluminum, and glass. Often the commodity materials can be sourced in the domestic market where power plant will be constructed. Although specialty components are required for CSP solar fields —including mirror panels used for heliostat applications—these specialty components constitute about 30-50% of total system installed costs [2]. Only a few companies and countries, including the United States, have developed the capacity to supply such specialty components. The U.S. heliostat supply chain at present is comprised of few companies (e.g., CSP developers), component suppliers, and is its infancy. By 2035, with current and aggressive solar photovoltaic (PV) capacity expansions, there is the potential for 500,000–1,500,000 direct and indirect jobs in the areas of manufacturing, installation and development, and operations and maintenance (O&M) [3]. Utilizing the CSP capacity estimations the recent NREL report [4], the construction of 39 gigawatts (GW) of CSP (assuming mainly power tower) in the U.S. could lead to approximately 195,000 manufacturing, construction, and O&M jobs. This does not include the longer-term jobs and economic impact (e.g., taxes from plant operations staff) from operating the plants once constructed. It is recommended that further CSP component and system supply chain analysis and modelling be undertaken.


  • Open Access

    Hybrid Solar Thermal Energy System for District Heating Application

    by Sertac Akar, Parthiv Kurup, Matthew Boyd, Colin McMillan

    Solar district heating (SDH) systems can be good alternatives to conventional systems when they are optimized with hybrid configurations and thermal energy storage (TES). In this scope, a hybrid renewable thermal energy system (RTES) model has been built combining flat plate collector (FPC) solar system with parabolic trough collector (PTC) system via a heat exchanger and coupled with TES. To undertake the hybridization of the system, System Advisor Model (SAM) software was modified, which allowed control over configurations and more accurate modelling of heat transfer between the collectors. The model is first compared to an existing hybrid solar district heating systems (DHS) system in Taars, Denmark. The results showed a good correlation with an overestimation of only 6.4% compared to most recent heat output. Then the same system configuration was modeled in different geographic locations to investigate the impact of changes in direct normal irradiance (DNI) to the heat sink thermal output of the hybrid system. The results showed that the annual net thermal power output in California, USA can be three times more than the annual net thermal power output in Taars, Denmark. Finally, multiple hybrid configurations with varying solar field sizes were simulated based on the heat demand of two different university campuses DHS. The results showed that, retrofit applications of this hybrid DHS system coupled with TES could reduce the natural gas consumption of the existing systems between 25% and 41%. The use of hybrid RTES highlighted in this paper can be extended to many more opportunities.