Tai Sik Lee
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Research Interests
Tai Sik Lee has a total of 30 co-authors. Here are the top co-authors by number of shared publications:
Byung Chul Chang
Hanyang University
4 shared publications- Dong Wook Lee
Jeju National University
4 shared publications - Leonhard E. Bernold
School of Civil and Environmental Engineering, University of New South Wales, Sydney, NSW 2052, Australia
4 shared publications - Dong Wook Lee
Dept. of Civil and Environmental Eng., Hanyang Univ., Korea
2 shared publications - Eun Soo Park
Hanyang University
2 shared publications Jaeho Lee
GRA, Department of Civil and Environmental Engineering, Hanyang University, 1271 Sa 3 Dong, Sangrok-gu, Ansan, South Korea
2 shared publications
Latest Publications
- Open Access
- 15 September 2017
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 22 (7) , 2528-2537
Application of Enzyme to Clay Brick and its Effect on Mechanical Properties
- 15 September 2017
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 22 (7) , 2528-2537
Open AccessApplication of Enzyme to Clay Brick and its Effect on Mechanical Properties
- Open Access
- 1 September 2016
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 20 (6) , 2154-2161
Measuring productivity changes in the Korean construction management industry
- 1 September 2016
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 20 (6) , 2154-2161
Open AccessMeasuring productivity changes in the Korean construction management industry
- Open Access
- 1 January 2015
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 19 (1) , 28-35
Research on improvement of system for automatic line stripe removal using dry ice blaster
- 1 January 2015
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 19 (1) , 28-35
Open AccessResearch on improvement of system for automatic line stripe removal using dry ice blaster
- Open Access
- 1 May 2014
- Published by Korean Society for Engineering Education in Journal of Engineering Education Research
- Vol. 17 (3) , 22-33
Effectiveness of Teaching Engineering in English with Specific Purpose
- 1 May 2014
- Published by Korean Society for Engineering Education in Journal of Engineering Education Research
- Vol. 17 (3) , 22-33
Open AccessEffectiveness of Teaching Engineering in English with Specific Purpose
- 17 April 2012
- Published by American Society of Civil Engineers (ASCE)
- p. 489-494
Mobility Evaluation of an Anchored Lunar Exploration Rover
One of the recent issues for lunar exploration is finding a spot which has abundant amount of Moon ice and characterizing it. This is essential for future lunar outpost site selection. Orbital remote sensing is one way for prospecting Moon ice, this could provide variable information of global location. However, there is a limit of remote sensing as it cannot perform subsurface investigation and we cannot know which is actually over there before we touch it or feel it. Thus, developing a rover which could explore inside the crater is required for the Moon ice prospecting inside the Permanent Shadow Region (PSR). This paper presents the new approach to travel steep slopes through lunar anchoring supported rover tested on lunar similar environment. These are preliminary work in designing and testing a locomotion system offering high agility and tractions for the Extreme Rough Terrain Exploration Rover (ERTER). Results of the first locomotion tests will be presented during the Earth & Space 2012 conference.
- 17 April 2012
- Published by American Society of Civil Engineers (ASCE)
- p. 489-494
Mobility Evaluation of an Anchored Lunar Exploration Rover
One of the recent issues for lunar exploration is finding a spot which has abundant amount of Moon ice and characterizing it. This is essential for future lunar outpost site selection. Orbital remote sensing is one way for prospecting Moon ice, this could provide variable information of global location. However, there is a limit of remote sensing as it cannot perform subsurface investigation and we cannot know which is actually over there before we touch it or feel it. Thus, developing a rover which could explore inside the crater is required for the Moon ice prospecting inside the Permanent Shadow Region (PSR). This paper presents the new approach to travel steep slopes through lunar anchoring supported rover tested on lunar similar environment. These are preliminary work in designing and testing a locomotion system offering high agility and tractions for the Extreme Rough Terrain Exploration Rover (ERTER). Results of the first locomotion tests will be presented during the Earth & Space 2012 conference.
- 17 April 2012
- Published by American Society of Civil Engineers (ASCE)
- p. 128-134
Feasibility Study on Lunar Concrete Landing Pad
NASA has the plan for human exploration after the year 2020. This human exploration concept is based on ISRU (In Situ Resource Utilization). The concept of ISRU is reducing delivery cost supporting reasonable and efficient space exploration. And it plans to use the resources of the Moon and equipment at least. According to this human exploration plan, it mentioned how to make landing pad in the Moon such as soil compaction, dust and soft regolith replacement, and the bank construction around landing pad. But there is one problem with removing the dust that cannot be perfectly stabilized. Thus, this paper will present a new approach for landing pad construction in the Moon considering ISRU. First of all, this landing pad construction needs standardized building materials and methods suitable for lunar environment. Since Lunar Concrete using the lunar simulant called KOHLS-1(Korea-Hanyang Lunar Simulant- 1) has enough strength for compression, prototype is manufactured based on it. Then, landing pad is constructed in a similar way to lunar concrete manufacturing method. After making the landing pad, it is applied to feasibility study with SELENE-2 in JAXA, Astrobotic in Google X Prize and so on about compression strength. And the result has shown that it has enough strength which is suitable for other lading scenarios on the Moon.
- 17 April 2012
- Published by American Society of Civil Engineers (ASCE)
- p. 128-134
Feasibility Study on Lunar Concrete Landing Pad
NASA has the plan for human exploration after the year 2020. This human exploration concept is based on ISRU (In Situ Resource Utilization). The concept of ISRU is reducing delivery cost supporting reasonable and efficient space exploration. And it plans to use the resources of the Moon and equipment at least. According to this human exploration plan, it mentioned how to make landing pad in the Moon such as soil compaction, dust and soft regolith replacement, and the bank construction around landing pad. But there is one problem with removing the dust that cannot be perfectly stabilized. Thus, this paper will present a new approach for landing pad construction in the Moon considering ISRU. First of all, this landing pad construction needs standardized building materials and methods suitable for lunar environment. Since Lunar Concrete using the lunar simulant called KOHLS-1(Korea-Hanyang Lunar Simulant- 1) has enough strength for compression, prototype is manufactured based on it. Then, landing pad is constructed in a similar way to lunar concrete manufacturing method. After making the landing pad, it is applied to feasibility study with SELENE-2 in JAXA, Astrobotic in Google X Prize and so on about compression strength. And the result has shown that it has enough strength which is suitable for other lading scenarios on the Moon.
- Open Access
- 1 May 2011
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 15 (5) , 781-792
A competency model for project construction team and project control team
- 1 May 2011
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 15 (5) , 781-792
Open AccessA competency model for project construction team and project control team
- Open Access
- 1 January 2011
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 15 (1) , 15-21
Viability analysis of innovative surface stripe removal system
- 1 January 2011
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 15 (1) , 15-21
Open AccessViability analysis of innovative surface stripe removal system
- Open Access
- 1 November 2010
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 14 (6) , 803-814
Improved link system between schedule data and 3D object in 4D CAD system by using WBS code
- 1 November 2010
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 14 (6) , 803-814
Open AccessImproved link system between schedule data and 3D object in 4D CAD system by using WBS code
- 11 March 2010
- Published by American Society of Civil Engineers (ASCE)
- p. 1418-1422
Experimental Study of Lunar Regolith Anchoring Forces
Anchoring technology to secure building structures has already been in use over 6000 years ago. In the Bronze Age boats were anchored with a large rock at the end of a rope. Anchors will undoubtedly play an important role in enabling not only the exploration of the moon but also in the construction of lunar facilities. Unlike the earth, the lunar surface is amiss of convenient means to anchor one end of a cable or rod in rocks or tree trunks. Alternative earth anchors will face much different soil conditions to be successfully installed and used on the moon. The key problem is the fact that nothing is known about the behavior of anchors in lunar regolith. This paper presents the beginning of an experimental study to assess the effect of circular wedge anchoring in compacted lunar simulant. It will introduce to key hardware that has been built and explains the models behind the planned pull-out tests with various anchor lengths and anchor sizes. The goal of the upcoming work will be to establish a function between pull-out force and theoretical models of failure mechanisms. These functions should provide the basis for experimentally verifications in lunar environments. Results of the first pull-out tests will be presented during the Earth&Space 2010 conference.
- 11 March 2010
- Published by American Society of Civil Engineers (ASCE)
- p. 1418-1422
Experimental Study of Lunar Regolith Anchoring Forces
Anchoring technology to secure building structures has already been in use over 6000 years ago. In the Bronze Age boats were anchored with a large rock at the end of a rope. Anchors will undoubtedly play an important role in enabling not only the exploration of the moon but also in the construction of lunar facilities. Unlike the earth, the lunar surface is amiss of convenient means to anchor one end of a cable or rod in rocks or tree trunks. Alternative earth anchors will face much different soil conditions to be successfully installed and used on the moon. The key problem is the fact that nothing is known about the behavior of anchors in lunar regolith. This paper presents the beginning of an experimental study to assess the effect of circular wedge anchoring in compacted lunar simulant. It will introduce to key hardware that has been built and explains the models behind the planned pull-out tests with various anchor lengths and anchor sizes. The goal of the upcoming work will be to establish a function between pull-out force and theoretical models of failure mechanisms. These functions should provide the basis for experimentally verifications in lunar environments. Results of the first pull-out tests will be presented during the Earth&Space 2010 conference.